BICSI Installer 2 Copper study materials
BICSI Installer 2 Copper study resources

BICSI Installer 2 Copper study plan

BICSI Installer 2 Copper · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Pathway and space preparation & Tools, equipment, and materials

  • Classify the pathway types (overhead, underfloor, conduit, tray, sleeve) present in a walk-through of a real or simulated site

  • Calculate pathway fill and required support placement for a specified bundle, showing your work

  • Match each installation task on a sample job list to the correct hand tool and test instrument

  • Assemble and inspect a personal tool kit, flagging any item that is damaged, out of calibration, or missing

Your checkpoint

A written pathway survey and tool selection sheet for a two-floor hypothetical building, covering at least 6 pathway types and 10 tools, with fill calculations shown

Week 2

Copper cable handling and installation & Safe work practices

  • Compare copper cable grades and jacket ratings and select the correct one for three given environments (plenum, riser, outdoor)

  • Compute minimum bend radius and maximum pull tension for four cable diameters, then state the go/no-go limit for each

  • Draft a pull sequence for a 30-cable horizontal run, including setup, intermediate supports, and cable dressing

  • Write a job hazard analysis covering ladder use, pulling overhead, hand-tool safety, and PPE selection

Your checkpoint

A complete pull plan package for a 30-cable horizontal run: tension and bend radius calculations, step-by-step pull sequence, and a signed-off JHA

Week 3

Cable termination & Safe work practices

  • Terminate RJ45 jacks on both T568A and T568B pinouts and verify each against a wiring chart

  • Punch down a 25-pair block and a patch panel, keeping pair twist intact to within the allowable distance from the termination point

  • Dress, bundle, and label completed cable runs so each end is traceable from the closet to the outlet

  • Apply correct PPE and posture while performing repetitive termination work at height and in a closet

Your checkpoint

A termination bench sample of 10 jacks plus one 25-pair block and one patch panel section, all labeled and passing visual inspection and wire-map continuity

Week 4

Testing and documentation

  • Execute length, continuity, wire-map, and pair-configuration tests on the Week 3 sample and record every result

  • Read a field tester's pass/fail output and explain what each failing parameter indicates about the installation

  • Produce an as-built drawing and a labeling schedule that match the installed sample

  • Assemble a test report with a pass/fail table, instrument details, and technician sign-off

Your checkpoint

A finished test-and-documentation package for the Week 3 termination sample: pass/fail table, as-built sketch, label schedule, and signature block

Week 5

Troubleshooting installation issues

  • Build a fault-isolation decision tree that moves from symptom to layer to likely cause

  • Introduce eight deliberate faults into your bench sample (opens, shorts, split pairs, reversed pairs, excessive length, damaged jacket) and diagnose each

  • Use a time-domain reflectometer or tester's fault-locating function to estimate the distance to a fault and compare against your measurement

  • Distinguish installation-caused faults from equipment and configuration problems and document how you ruled each out

Your checkpoint

A fault log of 8 injected cases, each with the symptom observed, the test used, the located cause, the corrective action, and the retest result

Week 6

Network components and system integration

  • Identify the components between the demarcation point and the work area and state the function of each

  • Compare cross-connect and interconnect topologies and choose the right one for two given closet scenarios

  • Sketch the power, grounding, and bonding relationships in a small equipment rack or cabinet

  • Explain how power over Ethernet affects cable selection and bundle sizing in a horizontal run

Your checkpoint

A one-page system diagram tracing a circuit from the demarcation point through the cross-connect, patch panel, horizontal cable, and outlet to the device, annotated with component roles

Week 7

Accepted telecommunications cabling installation practices & Safe work practices

  • Audit your Week 1 through Week 6 artifacts against accepted practices for separation from power, support spacing, fill, firestopping, and grounding

  • List every deviation you find and write the corrective action for each

  • Re-run the job hazard analysis for a scenario that adds confined-space or ceiling-void work

  • Summarize the safety and workmanship rules you would apply on any copper installation job

Your checkpoint

A scored compliance audit of your own prior work with a deviation register and a one-page safety and workmanship quick-reference sheet

Week 8

Pathway and space preparation & Copper cable handling and installation & Cable termination & Testing and documentation & Troubleshooting installation issues & Network components and system integration & Tools, equipment, and materials & Safe work practices & Accepted telecommunications cabling installation practices

  • Take a full-length timed practice exam covering all nine domains and record the score by domain

  • Re-study only the two lowest-scoring domains using your own notes and artifacts

  • Re-take missed items and explain in writing why the correct answer is correct

  • Recite from memory the key calculations and practices you will be tested on (bend radius, pull tension, fill, support, labeling)

Your checkpoint

A timed practice exam score of at least 80 percent overall with a written remediation list for every missed item

Milestones

Week 2: Pull plan and JHA are complete and self-reviewed; bend radius and tension calculations are correct on all four cable sizes

Week 4: Week 3 termination sample passes wire-map and continuity testing with a documented test report and as-built drawing

Week 6: System diagram is complete and you can explain cross-connect versus interconnect and grounding relationships without notes

Week 8: Timed practice exam score of 80 percent or higher overall and no domain below 70 percent