This page supports independent study for the BICSI OSP Designer credential, an outside plant design qualification offered by BICSI. BICSI describes itself as defining "the standards, credentials, and training that ensure systems are designed, installed, and delivered to perform," and its certifications are positioned to "validate expertise to deliver systems that perform." The credential is aimed at professionals who plan, design, and document outside plant telecommunications infrastructure, including route selection, cable and enclosure placement, construction coordination, and conformance with codes and standards. The BICSI OSP case studies are 5 cases and about 3,355 words.
1Right-of-Way Width Versus Easement Width on a Rural Aerial Route
A utility is designing a 6.4 km aerial OSP route along a rural county road to serve a new industrial park. The designer has a 15 m (50 ft) public right-of-way dedicated to the county, but a recorded utility easement only 4.6 m (15 ft) wide centered on the road centerline.
738 words, about 4 min2Choosing Between Direct-Buried and Ducted Cable in a Flood-Prone Crossing
A campus network needs a 900 m backbone segment that crosses a seasonal drainage channel and a paved service road. The designer proposes direct-buried loose-tube single-mode cable at 1.1 m (3.5 ft) depth with no conduit, plus a 25 mm (1 in) innerduct only under the road crossing.
672 words, about 3 min3Pull Tension and Sidewall Pressure on a Long Duct Run
A crew is installing 1,200 m of outside plant cable into a 50 mm (2 in) high-density polyethylene duct bank. The route has four 90-degree bends with 1.2 m radius, a 300 m straight section, and a 45 m vertical rise into a building vault.
633 words, about 3 min4Schedule Compression When a Permit Slips on a Multi-Site Build
An OSP project spans 14 sites over 22 weeks with a critical path through three pole-line permits, two road crossings, and a fiber pull that must follow splice testing. The road-crossing permit for site 7 has slipped 6 weeks due to a jurisdiction backlog.
672 words, about 3 min5Clearance and Grounding Decisions at a Joint-Use Pole
A communications utility is attaching to 12 existing joint-use poles along a 1.5 km route. The poles carry a 12.5 kV distribution circuit with a neutral at 8.5 m above grade.
640 words, about 3 min