- Loss budget
- The sum of cable attenuation, splice loss, connector loss, and passive splitter loss in a link; it must be less than or equal to the system link budget to ensure acceptable performance.
- Single-mode attenuation
- Typical planning values are about 0.4 dB/km at 1310 nm and 0.3 dB/km at 1550 nm; actual values come from manufacturer specifications and should be used for design calculations.
- Bend radius rule
- Common practice limits cable bend radius to about 10 times the cable diameter under no-load conditions and 20 times under full tensile load, unless the manufacturer specifies a different value.
- F1/F2/F3 hierarchy
- Feeder (F1) runs from the central office to a feeder/distribution point; distribution (F2) reaches access points; drop (F3) connects the access point to the subscriber.
- Conduit fill rule
- For multi-cable pulls, total cable cross-sectional area should generally not exceed about 40 percent of the conduit inner cross-sectional area, leaving room for future capacity and pulling friction.
- Route selection factors
- Designers weigh right-of-way availability, permitting, soil and rock conditions, water crossings, joint-use opportunities, future growth corridors, and construction cost when choosing an OSP route.
- Minimum cover depth
- Direct-buried cable must be placed below a minimum depth set by local code or utility requirements, with greater depth under roadways and railroad crossings, and marked with warning tape or markers.
- Aerial clearance
- Aerial communications lines must maintain NESC-specified separations from supply conductors, roads, railways, and structures, and must respect pole attachment and span length limits.
- Loose-tube cable
- An OSP cable construction in which fibers sit in gel-filled or dry buffer tubes within a protective jacket; well suited to outdoor feeder and distribution routes and long spans.
- Tight-buffered cable
- A cable construction where each fiber has a direct protective buffer coating; commonly used indoors and for short intrabuilding runs where loose-tube OSP cable is not appropriate.
- Strength member function
- Strength members and the cable jacket carry pulling tension and external loads; the optical fibers themselves must never be relied on to bear tension during installation or service.
- Locating wire
- A metallic or toneable element included in buried cable so the route can be found with locating equipment; armored cable may also provide protection against rodents and abrasion.
- Splice closure requirements
- Closures should be re-enterable, environmentally sealed, and rated for the installation environment such as aerial, buried, pedestal, or vault, and must protect splices from moisture and mechanical damage.
- Fiber color code
- Industry-standard fiber color sequences identify individual fibers within a buffer tube, and buffer tubes are color-coded to identify their position within the cable.
- Copper binder groups
- OSP copper pairs are organized into 25-pair binder groups identified by tip and ring conductor colors and binder colors, allowing accurate pair identification and splicing.
- Copper protection
- Copper OSP facilities are exposed to lightning and power influence, so bonding, grounding, and primary protector placement at the building entrance are required for safety and reliability.
- OSP hardware inventory
- Common hardware includes pedestals, handholes, vaults, splice cases, cable racks, strand, lashing wire, and drop hardware, each with a rated load and environment of use.
- Maximum pulling tension
- Pulling tension must not exceed the cable manufacturer's rated maximum; long pulls may require lubricant, intermediate assist, or pulling from both directions to stay within limits.
- Sidewall pressure
- The force exerted on cable against a bend during pulling; excessive sidewall pressure can crush or abrade cable even when pulling tension remains below the rated maximum.
- Conduit proofing
- Before pulling, ducts should be mandreled and proofed to confirm they are clear and within tolerance, then lubricated to reduce friction and protect the cable.
- ADSS placement
- All-dielectric self-supporting cable must be installed where the electric field at the attachment point is acceptable; placement on joint-use poles requires field or design verification.
- Fusion splice process
- Splicing involves cleaning the fiber, precision cleaving, fusing in the splicer, verifying splice loss, and protecting the splice in a tray within the closure.
- Bidirectional OTDR testing
- OTDR testing is performed from both ends because backscatter differences can bias one-directional readings; bidirectional results give accurate splice and span loss values.
- Call before you dig
- Existing utilities must be located and marked before trenching or plowing; permits, cover depth, and surface restoration requirements must also be satisfied during construction.
- As-built records
- Final documentation should capture actual route, depths, splice locations, and test results so future maintenance, locating, and capacity planning can be performed accurately.
- Critical path
- The longest-duration path through the project schedule; any delay on the critical path delays project completion, so it receives the most schedule management attention.
- Earned value metrics
- Cost variance equals EV minus AC, schedule variance equals EV minus PV, CPI equals EV divided by AC, and SPI equals EV divided by PV; values below 1.0 indicate unfavorable performance.
- Risk response strategies
- Documented risk responses include avoid, mitigate, transfer, and accept; each entry should record probability, impact, response strategy, and a named risk owner.
- Change control
- Any change to scope, cost, or schedule baseline requires documented review and approval before implementation, preserving traceability and preventing unapproved scope growth.
- NESC scope
- The National Electrical Safety Code governs clearances, strength, and installation of supply and communication lines, including joint-use pole attachments and aerial separation requirements.
- NEC Articles 770 and 800
- NEC Article 770 covers optical fiber cables and Article 800 covers communications circuits; both address entrance facilities, grounding, and permitted cable substitutions.