BOMI RPA study materials
BOMI RPA study resources

BOMI RPA cheat sheet

BOMI RPA · Keep the key ideas within reach.

Quick reference

Real Property Administration

  • Bundle of rights: disposition, exclusion, possession, quiet enjoyment, control - ownership is a set of severable rights, not a single indivisible thing.

  • Deed validity requires four elements: competent grantor, identifiable grantee, words of conveyance, and delivery with intent to convey; recording protects priority, not validity.

  • Easement vs. license: an easement is an interest in land binding successors; a license is revocable permission and creates no interest.

  • Leasehold estates: estate for years terminates automatically at a fixed date with no notice; periodic tenancy renews automatically and requires notice to terminate.

  • Title evidence hierarchy: general warranty deed (widest covenants) > special warranty > bargain and sale > quitclaim (no covenants).

  • Adverse possession typically requires actual, open and notorious, exclusive, hostile, and continuous possession for a statutory period.

  • Rentable vs. usable area: load factor = rentable area ÷ usable area; a higher load factor increases the effective cost per usable square foot.

  • Property manager authority flows from the management agreement: scope of services, spending limits, leasing authority, and reporting cadence are contract terms, not assumed powers.

Quick reference

Property and Asset Management

  • Asset management optimizes the owner's investment return over a hold period; property management executes day-to-day operations at the building level.

  • NOI = effective gross income − operating expenses; it excludes debt service, income taxes, depreciation, and capital expenditures.

  • Effective gross income = potential gross income − vacancy and collection loss + other income.

  • Operating expense ratio = operating expenses ÷ effective gross income; compare against submarket benchmarks of similar age and class.

  • Capital reserve funding is a budgeted non-operating item; unfunded reserves shift cost to future owners and depress resale value.

  • Operating budget variance: dollar variance = actual − budget; percent variance = dollar variance ÷ budget line; investigate variances beyond a stated threshold.

  • Preventive maintenance is scheduled by condition and warranty cycle; corrective maintenance is reactive; deferred maintenance raises risk and future capital need.

  • Hold/sell analysis weighs NOI trajectory, capex needs, cap rate movement, and debt terms rather than current occupancy alone.

Quick reference

Building Systems and Operations

  • HVAC load components: conduction through envelope, solar gain, internal gains from people, lighting, and equipment, plus ventilation load.

  • Chilled water loop: chiller → chilled water pump → air handling unit coil → return; condenser water loop rejects heat via cooling tower.

  • VAV systems vary air volume at constant supply temperature; fan energy drops with the cube of flow reduction, so part-load savings are substantial.

  • Elevator maintenance contracts differ: full-service covers parts and labor; oil-and-grease covers routine lubrication only, leaving repairs to the owner.

  • Fire protection: sprinkler systems require periodic inspection and testing per adopted code; impairment procedures and hot-work permits govern shutdowns.

  • Electrical service capacity is rated in amps and volts; available capacity constrains tenant fit-out and must be verified before leasing commitments.

  • Life-safety systems include detection, notification, suppression, and egress; each has separate inspection and testing intervals.

  • Building commissioning verifies systems perform per design intent at turnover; retro-commissioning applies the same process to existing buildings.

Quick reference

Financial Management and Accounting

  • Cash basis recognizes transactions when cash moves; accrual basis recognizes revenue when earned and expenses when incurred, matching them to the period.

  • Straight-line rent recognition spreads total lease payments evenly over the lease term, even if cash rent escalates.

  • Cap rate = NOI ÷ value; value = NOI ÷ cap rate; a lower cap rate implies a higher price per dollar of income.

  • Cash-on-cash return = pre-tax cash flow ÷ equity invested; it measures leverage effect, not unlevered asset quality.

  • DSCR = NOI ÷ annual debt service; lenders commonly require a minimum coverage threshold before approving a loan.

  • Depreciation is a non-cash tax deduction; it reduces taxable income but does not reduce cash flow or NOI.

  • Escalation recovery: recoverable operating expenses × tenant pro rata share (tenant rentable area ÷ total rentable area), subject to base year or expense stop.

  • Gross-up adjustment in CAM reconciliations normalizes variable expenses to a stated occupancy level so tenants pay a fair share.

Quick reference

Leasing

  • Lease types: gross (landlord pays expenses), net (tenant pays taxes, insurance, maintenance), and modified gross (split defined by the lease).

  • Base year stop: tenant pays its pro rata share of expenses above the base year amount; expense stop uses a fixed dollar figure instead.

  • Tenant improvement allowance is landlord capital; amortization of the allowance into rent converts a lump sum into a lease-term income stream.

  • Concessions such as free rent reduce effective rent; compare deals on effective rent per square foot over the full term, not face rate.

  • Lease term components: commencement date, rent commencement date, expiration, renewal options, and early termination rights may all differ.

  • Assignment transfers the entire remaining interest; sublease transfers only part of the term or premises and leaves the original tenant liable.

  • Percentage rent = (gross sales − breakpoint) × overage percentage; natural breakpoint = base rent ÷ overage percentage.

  • Recovery structure must match lease language: cap on controllable expenses, audit rights, and exclusions are negotiated clauses, not defaults.

Quick reference

Marketing and Tenant Relations

  • Vacancy cost = lost rent + unrecovered operating expenses + leasing commissions + TI + downtime; leasing speed directly affects net effective rent.

  • Tenant retention economics: renewal typically avoids downtime and full TI, so renewal cost per year is usually lower than a new lease.

  • Space marketing requires accurate rentable area, load factor, and availability date; misstated area creates lease disputes at execution.

  • Tenant satisfaction drivers measurable by survey: response time to service requests, cleanliness, security, comfort, and communication.

  • Work order metrics: response time (receipt to dispatch) and resolution time (dispatch to completion) are tracked separately.

  • Tenant improvement project communication plan: milestone schedule, access notices, utility shutdown notices, and escalation contact.

  • Delinquency escalation sequence: reminder, formal notice per lease, then remedies permitted by lease and local law; self-help eviction is generally prohibited.

  • Lease abstract data - options, notice addresses, co-tenancy, exclusives - drives both marketing claims and enforcement.

Quick reference

Risk Management and Regulatory Compliance

  • Risk control hierarchy: avoid, reduce, transfer (insurance and contracts), and retain; retention is appropriate for low-severity, high-frequency exposures.

  • Certificate of insurance review checks named insured, additional insured status, limits, and notice of cancellation - a certificate is evidence, not coverage.

  • Indemnification and insurance are distinct: indemnity allocates liability; insurance funds it; the contract should make them consistent.

  • Fair housing law prohibits discrimination in sale, rental, and advertising based on protected classes defined by federal, state, and local law.

  • Environmental obligations include asbestos and lead-based paint disclosure, underground storage tank reporting, and mold/moisture response procedures.

  • OSHA obligations for building operations cover hazard communication, bloodborne pathogens, lockout/tagout, and recordkeeping of injuries.

  • ADA obligations split into removal of barriers in existing facilities (readily achievable) and design standards for new construction and alterations.

  • Incident documentation should record time, persons, conditions, and witnesses contemporaneously; documentation supports both claims defense and insurance recovery.