Building Science Fundamentals

  • Heat flows from warmer to colder across all three modes: conduction (solid), convection (fluid/air), radiation (electromagnetic); total envelope load is the sum of parallel paths.

  • Conduction formula: Q = U x A x ΔT, where U is assembly conductance (1/R), A is area, and ΔT is indoor-outdoor temperature difference.

  • Assembly R-value is the sum of layer resistances plus surface films; adding a low-permeance layer inside the insulation moves the dew point and raises condensation risk.

  • Psychrometrics: relative humidity = (vapor pressure / saturation vapor pressure) x 100; dew point is the temperature at which air reaches saturation at constant moisture content.

  • Air leakage carries both sensible and latent load; a 1-inch hole can move more moisture than a large diffusion area, so air sealing precedes insulation decisions.

  • Stack effect drives upward air movement in winter (warm air buoyant) and downward in summer; neutral pressure level shifts with envelope leakage distribution.

  • Thermal bridging through studs, slabs, and balcony penetrations lowers effective R-value; parallel-path method: U_eff = f_frame x U_frame + f_cavity x U_cavity.

  • Moisture balance: wetting (rain, vapor diffusion, air leakage, ground moisture) versus drying (ventilation, diffusion, drainage); a durable assembly keeps drying capacity greater than wetting.

Quick reference

Building Assessment and Data Collection

  • Pre-assessment scope defines building type, vintage, occupancy, HVAC systems, and known complaints; scope drives which instruments and sampling plan are used.

  • Site walk sequence: exterior (drainage, envelope, penetrations) then interior (moisture, air leakage, HVAC, occupant patterns) to avoid missing systemic causes.

  • Moisture meters: pin-type reads surface conductivity; pinless reads relative moisture via capacitance; both require material-specific calibration and confirmation with a second method.

  • Blower door test setup requires all exterior openings closed, interior doors open or pressure-balanced, combustion appliances off, and baseline pressure recorded before the test.

  • Sampling plan should record location, time, instrument, method, and calibration status; chain of custody matters for any data used in a report or dispute.

  • Visual inspection hierarchy: water entry points first, then storage and distribution (HVAC, plumbing), then occupant-generated moisture sources.

  • Occupant interviews capture complaint timing, weather correlation, and recent changes (renovations, new appliances) that explain data patterns.

  • Data quality checks: repeat readings, compare instruments, flag outliers, and note environmental conditions (temperature, wind, stack effect) that bias results.

Quick reference

Diagnostic Testing and Measurement

  • Blower door: CFM50 divided by conditioned volume gives ACH50; divide by 60 for ACH natural estimate only with a documented leakage curve, not a fixed factor.

  • Pressure diagnostics use a manometer referenced to outside; a zone reading near the house pressure indicates a connected zone, while near zero indicates isolation.

  • Infrared thermography requires a minimum ΔT (typically 10°F or more) between inside and outside to resolve thermal anomalies; solar gain and wind create false positives.

  • Duct leakage testing (Delta Q or duct blaster) measures system leakage at 25 Pa; results are reported as CFM25 and as a percentage of system airflow.

  • Combustion safety: measure CO in flue and ambient air, draft pressure, and spillage; a draft reading that reverses under worst-case conditions indicates a hazard.

  • Pressure pan testing: measure pressure difference across a register with the house depressurized; higher readings indicate greater duct leakage to outside.

  • Tracer gas and zone pressure testing isolate pathways; a door or hatch that changes zone pressure when opened confirms a connection.

  • Instrument calibration: manometers zeroed before each test, anemometers checked against known flow, and all readings recorded with units and conditions.

Quick reference

Field Documentation and Reporting

  • Field notes should record date, time, weather, instrument model and serial, calibration date, test conditions, and exact measurement locations.

  • Photos require scale references and orientation notes; label each image with location, direction, and what it documents.

  • Report structure: objective and scope, methods, findings with data, limitations, conclusions, and recommended actions with priority.

  • Distinguish measured facts from interpretation; label estimates as estimates and cite the instrument and method behind every number.

  • Record negative results (tests that found nothing) because absence of evidence informs the conclusion and protects against later disputes.

  • Units and conversions must be explicit: Pa, CFM, ACH, °F/°C, and moisture content percentages; mixing units is a common documentation error.

  • Limitations section should state inaccessible areas, weather constraints, and any test conditions that reduce confidence in results.

  • Recommendations should be actionable and prioritized by risk, cost, and verification method so the client can act and confirm the fix.