Belarus Construction Specialist Attestation flashcards
Belarus Construction Specialist Attestation · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Construction permit
- A document issued by the local executive authority that authorizes construction or reconstruction of an object; it is issued after design and expert review and precedes site works.
- Expert review of project
- Mandatory assessment of design documentation for compliance with technical normative documents and safety requirements; a positive conclusion is required before a construction permit for regulated objects.
- Author's supervision
- Designer's control over construction to ensure the works follow the approved design; the designer records deviations, issues instructions, and confirms design changes during construction.
- Project of organization of construction
- Design-stage document establishing construction duration, staging, site plan, temporary facilities and resource schedules; it is developed by the design organization as part of the project.
- Critical path
- The longest chain of dependent activities in a schedule network; its length equals the minimum project duration, and any delay on it extends the whole project.
- Float of an activity
- The amount by which an activity can be delayed without delaying the project; computed as late finish minus early finish, and zero float marks a critical activity.
- Project of works execution
- Contractor-developed document detailing technology, crews, equipment, safety measures and quality control for specific works; it is based on the project of organization of construction.
- Ultimate limit state
- A condition in which a structure loses bearing capacity through strength, stability or fatigue failure, or the foundation fails; design must prevent it with partial safety factors.
- Serviceability limit state
- A condition in which a structure remains safe but its normal use is impaired by excessive deflection, crack opening, vibration or foundation settlement; checked under design loads.
- Snow load on roof
- Vertical load from snow determined by the snow region, roof shape and exposure, with coefficients for thermal effects and drift; used in combinations with other variable loads.
- Concrete cover to reinforcement
- Thickness of concrete between the reinforcement surface and the outer face; it protects bars from corrosion and provides fire resistance, and its minimum depends on exposure class.
- Concrete strength class
- Designation such as C20/25 giving characteristic cylinder and cube compressive strengths in MPa; it governs structural capacity and is verified by testing cubes at specified ages.
- Water-cement ratio
- Mass ratio of water to cement in a concrete mix; lower values increase strength and reduce permeability, while higher values improve workability but reduce durability.
- Incoming inspection of materials
- Check of delivered materials and products against certificates, passports and project requirements before use; undocumented or nonconforming materials are rejected and not allowed into works.
- Thermal conductivity of insulation
- Property expressing heat flow through a material per unit thickness and temperature difference; it determines the insulation thickness needed to achieve the required thermal resistance.
- Fire flow in water supply
- The additional water flow that an internal or external network must deliver for firefighting, stored or available at the required pressure; it sets pipe and pump capacity.
- Hydraulic testing of pipelines
- Pressure test of a pipeline or heating system to verify tightness and strength before backfilling or commissioning; results are recorded in an act.
- Air exchange rate
- The volume of air supplied to or removed from a room per hour, expressed relative to room volume; it is set by room purpose and ensured by natural or mechanical ventilation.
- Gas pipeline pressure classes
- Categories of gas networks by operating pressure - low, medium and high - which determine pipe material, safety distances from buildings and utilities, and required shutoff devices.
- Work at height
- Work performed at a height where a fall hazard exists, generally 1.8 m and above; it requires fall protection, trained workers and a permit in defined cases.
- Crane danger zone
- The area where a load may fall or the crane may move; it is fenced and controlled, and lifting operations require certified operators, slingers and signalmen.
- Targeted safety instruction
- Instruction given before specific works or after an accident, change of technology or violation; it is recorded in the instruction log with the worker's signature.
- Hidden works act
- Document certifying that works to be covered by subsequent construction were inspected and conform to the design and norms; covering without the act requires reopening.
- Operational quality control
- Control performed during each technological operation by the contractor's personnel and engineers, checking compliance with the project and norms before the next stage begins.
- As-built survey
- Geodetic measurement of completed structures and utilities recording actual plan position and elevations; deviations from design are compared with tolerances and documented.
- Estimated cost structure
- The composition of construction cost as direct costs plus overhead costs plus planned profit; direct costs include materials, labor and machine operation.
- Resource method of pricing
- Cost estimation based on actual quantities of resources - materials, labor hours and machine hours - multiplied by current prices, plus overheads and profit.
- Fixed contract price
- A contract price that is not adjusted for cost changes during construction; it transfers price risk to the contractor and suits complete, well-defined design documentation.
- Construction geodetic grid
- A system of fixed points on site used to transfer design axes and elevations to the works; points are placed outside the excavation zone and checked for stability.
- Setting-out works
- Transfer of design plan position and elevations to the site using the geodetic control network, instruments and leveling, followed by as-built verification of accuracy.
- Fire resistance rating
- The time in minutes during which a structure retains load-bearing capacity, integrity and thermal insulation under fire exposure; it defines the required fire-resistance degree of the building.
- Fire compartment
- A part of a building separated by fire barriers with a set fire-resistance rating, limiting fire and smoke spread and permitting a maximum floor area by fire-safety norms.