California Supplemental Examination (CSE) study plan
California Supplemental Examination (CSE) · Give each week a clear focus.
8 weeks · About 7 hours per week
California Building Standards Code (Title 24) - code administration, occupancy, construction types, and permits
Map Title 24 Parts 1 through 12 to their California Building Code counterparts and mark which parts the CSE actually tests
Classify 20 sample buildings into CBC Chapter 3 occupancy groups and write the code basis for each classification
Sequence the California permit workflow from submittal through plan check, issuance, and inspection, naming the responsible party at each step
Summarize CBC Chapter 6 construction Types I through V with their height and area limits in a comparison table
Your checkpoint
A one-page Title 24 roadmap plus a 20-entry occupancy classification log, each entry cited to a CBC section
California Building Standards Code (Title 24) - code administration, occupancy, construction types, and permits & Seismic and structural requirements - seismic design, retrofit, and geotechnical considerations specific to California
Resolve 15 mixed-use and high-rise scenarios by applying occupancy separation, allowable area, and construction type rules together
Identify the CBC Chapter 16 and 17 provisions that trigger a California geotechnical report and a soils investigation
Distinguish the roles of the architect, structural engineer, and geotechnical engineer in the California design team
Draft a permit submittal checklist for a nonresidential tenant improvement in a California jurisdiction
Your checkpoint
A written worked solution for 15 scenario items plus a one-page permit submittal checklist
Accessibility - CBC Chapters 11A/11B, ADA, and fair housing requirements
Compare CBC Chapter 11B and Chapter 11A scopes and state which occupancies each governs
Calculate required accessible parking, path-of-travel clear widths, and restroom fixture counts for three plan snippets
Cross-walk CBC accessibility provisions to the corresponding ADA Standards clauses
Apply federal fair housing design requirements to a multifamily unit layout and flag every violation
Your checkpoint
An accessibility compliance worksheet covering three plan snippets with CBC 11B, ADA, and fair housing citations side by side
Seismic and structural requirements - seismic design, retrofit, and geotechnical considerations specific to California
Explain how California's seismic design categories derive from ASCE 7 and map them to CBC Chapter 16 requirements
Compare soft-story retrofit, cripple-wall retrofit, and unreinforced masonry ordinances and state which buildings each targets
Interpret a sample geotechnical report for liquefaction, landslide, and fault-zone disclosure implications
Describe the seismic hazards mapping act disclosure duties owed to a client on a California project
Your checkpoint
A seismic quick-reference sheet and a written analysis of one sample geotechnical report with design recommendations
Professional practice, ethics, and California Architects Board laws and regulations
Outline the Architects Practice Act scope, including what constitutes the practice of architecture and who may use the title
Delineate CAB enforcement processes, from citation to disciplinary action, and the architect's reporting obligations
Apply the AIA Code of Ethics and CAB regulations to five conflict-of-interest and competence scenarios
Review continuing education and license renewal requirements for California architects
Your checkpoint
A two-page ethics and regulation decision tree tested against five written scenarios
Fire and life safety - egress, fire-resistive construction, sprinklers, and wildfire/WUI provisions & Energy, green building, and sustainability - Title 24 Parts 6 and 11, CALGreen
Size and locate exits for three occupancies using occupant load, travel distance, and common-path rules in CBC Chapter 10
Determine required fire-resistance ratings for a mixed-occupancy building and specify where sprinklers change the calculation
Apply wildland-urban interface requirements in CBC Chapter 7A to a sample exterior assembly
Compare Title 24 Part 6 envelope, lighting, and mechanical compliance paths and list CALGreen mandatory measures from Part 11
Your checkpoint
An egress and fire-resistance calculation packet for three occupancies plus a one-page WUI and CALGreen checklist
Land use, zoning, and environmental review - general plans, local ordinances, CEQA & Contracts, project delivery, and construction administration in California practice
Trace how a general plan element flows into a zoning ordinance and then into a specific project entitlement
Determine whether a sample project is categorically exempt, requires a negative declaration, or requires an EIR under CEQA
Compare California project delivery methods and identify when alternative delivery is authorized for public work
Draft the key contract and administration provisions covering payment, changes, delay, and termination on a California project
Your checkpoint
A CEQA determination memo for a sample project plus a one-page contract risk allocation matrix
California Building Standards Code (Title 24) - code administration, occupancy, construction types, and permits & Accessibility - CBC Chapters 11A/11B, ADA, and fair housing requirements & Seismic and structural requirements - seismic design, retrofit, and geotechnical considerations specific to California & Fire and life safety - egress, fire-resistive construction, sprinklers, and wildfire/WUI provisions & Energy, green building, and sustainability - Title 24 Parts 6 and 11, CALGreen & Land use, zoning, and environmental review - general plans, local ordinances, CEQA & Contracts, project delivery, and construction administration in California practice & Professional practice, ethics, and California Architects Board laws and regulations
Complete two timed 80-question practice exams under test conditions and score above 75 percent on each
Rework every missed item to its governing code section and rebuild notes around those gaps
Recite from memory the occupancy, egress, accessibility, and seismic triggers most frequently tested
Confirm exam-day logistics, approved references, and the CAB candidate handbook requirements
Your checkpoint
Two scored practice exams with a written error log and a one-page final review sheet
Milestones
Week 2: Score 70 percent or higher on a self-made 40-question Domain 1 quiz covering occupancy, construction type, and permits
Week 4: Correctly answer 8 of 10 accessibility and seismic scenario items without notes
Week 6: Complete the egress and fire-resistance packet with no arithmetic errors in occupant load or travel distance
Week 8: Score 75 percent or higher on both timed practice exams with every missed item traced to a code citation