ASTTBC PPE · Keep the key ideas within reach.

Quick reference

Professional Practice

  • A registrant may practise only within the scope of competence defined by education, training, and supervised experience; new task areas require supervision or additional qualification first.

  • The engineer of record holds final responsibility for design decisions; delegation of drafting or calculation does not transfer accountability for the sealed work.

  • A documented field review or design review must be completed before issuing a sealed drawing; verbal sign-off alone is insufficient evidence of review.

  • Continuing competence is demonstrated by a dated record of professional development activities, retained for the audit period set by the regulator.

  • Conflicts between client instructions and technical standards are resolved by written notice to the client; the standard governs until the client issues a written direction accepting documented risk.

  • A professional opinion offered in a dispute must disclose the basis, assumptions, and any limitation on the scope of the investigation.

  • Signing and sealing certifies that the work was prepared by, or directly supervised by, the seal holder, not that the work is free of all risk.

  • When assuming responsibility for another practitioner's prior work, verify the design basis independently; a review limited to format compliance does not constitute assumption of responsibility.

Quick reference

Ethics and Regulation

  • Duty of loyalty runs to the public interest first, then to the client, then to the employer; where these conflict, public safety governs disclosure decisions.

  • Confidential client information may be released without consent only where required by law, by a court order, or to prevent a clear risk to life safety.

  • A conflict of interest exists where a personal financial interest could reasonably be seen to influence judgment; disclose in writing and withdraw if the conflict cannot be managed.

  • Accepting compensation from both a supplier and a client for the same project is prohibited without full written disclosure and consent from all parties.

  • Advertising and competitive proposals must not misrepresent qualifications, and must not be based on a fee that compromises the technical adequacy of the work.

  • Practitioners must report to the regulator, in writing, within the period set by the Act, any judgment, conviction, or disciplinary finding that bears on fitness to practise.

  • Criticizing another practitioner's work publicly requires a factual, technically supported basis; unsupported disparagement is a disciplinary matter.

  • Regulatory obligations under the governing Act prevail over an employment contract clause that would require a registrant to conceal a safety non-compliance.

Quick reference

Applied Science Technology Practice

  • Stress equals force divided by cross-sectional area; strain equals change in length divided by original length; the ratio of the two is Young's modulus.

  • Factor of safety equals ultimate or yield strength divided by the allowable working stress; a higher factor is required where loads are uncertain or consequences of failure are severe.

  • Beam deflection scales with load times span cubed divided by the product of modulus and moment of inertia, so doubling span increases deflection about eightfold for the same load.

  • Thermal expansion equals the coefficient of linear expansion times original length times temperature change; restrained expansion generates stress equal to modulus times strain.

  • Ohm's law relates voltage, current, and resistance; power in a resistive circuit equals voltage times current, or current squared times resistance.

  • Flow rate in a pipe equals cross-sectional area times velocity; a reduction in diameter raises velocity by the square of the diameter ratio for constant flow.

  • Units must be carried through every calculation; convert to a consistent base set before computing and state the unit of the final result.

  • Measurement uncertainty is reported with the result, combining instrument accuracy, resolution, and repeatability, and the reported value is rounded to match that uncertainty.

Quick reference

Communication and Documentation

  • A sealed drawing carries the practitioner's name, seal, date, and revision identifier; superseded revisions are marked void rather than deleted from the record.

  • Design calculations record the design basis, code edition, load cases, assumptions, and references so an independent reviewer can reproduce the result.

  • Site instructions issued verbally must be confirmed in writing within the period set by the contract to be enforceable and to create a retrievable record.

  • Change orders identify the scope change, the technical justification, the cost and schedule effect, and the approving authority before work proceeds.

  • Records are retained for the period required by the regulator or the contract, whichever is longer, and remain legible and retrievable for the whole period.

  • Technical reports separate observation from interpretation; conclusions are traceable to stated evidence, and limitations of the investigation are stated explicitly.

  • Electronic signatures carry the same legal weight as handwritten seals where the identity of the signer is authenticated and the document is locked against alteration.

  • Correspondence on a dispute is treated as potentially disclosable; write factual, dated, and technical content rather than opinion or speculation.

Quick reference

Safety

  • Hierarchy of controls, in descending effectiveness: eliminate the hazard, substitute, engineer the control, administer the procedure, then rely on personal protective equipment.

  • A hazard assessment identifies the task, the hazards, the likelihood and severity of harm, and the controls applied; it is reviewed when the task, equipment, or crew changes.

  • Lockout and tagout requires isolation of all energy sources, verification of zero energy state by test, and removal of locks only by the person who applied them.

  • Fall protection is required where a worker can fall from a height set by the applicable regulation; guardrails, travel restraint, and fall arrest are ranked in that order.

  • Confined space entry requires pre-entry atmospheric testing for oxygen, flammability, and toxicity, a written entry permit, an attendant, and a rescue plan.

  • Incident investigation establishes the sequence of events and the contributing causes; the purpose is prevention, and the report is kept separate from disciplinary action.

  • Emergency response plans state evacuation routes, assembly points, alarm signals, and the designated warden for each area, and are exercised on a set schedule.

  • Personal protective equipment is the last line of defence because its effectiveness depends on correct selection, fit, and consistent use by the worker.

Quick reference

Sustainability and Public Protection

  • Life-cycle assessment totals impacts from material extraction through manufacture, use, and end of life; comparing options on construction cost alone omits most of the impact.

  • Embodied carbon is reported per functional unit and per declared unit; comparisons are valid only where system boundaries and service life assumptions match.

  • Sustainable design decisions are documented with the criteria applied, so that a claim of improved performance can be audited against the design basis.

  • Public protection requires that a structure or system fail safely, with warning and without progressive collapse, where a single element is lost.

  • Environmental site assessment follows a phased approach: records review and site visit first, sampling and analysis only where the initial phase identifies a potential contaminant.

  • Contaminated soil or groundwater discovered during work triggers a stop, notification to the owner and regulator, and containment until a remediation plan is approved.

  • Resilience planning considers the design event return period, redundancy of critical services, and access for emergency response after the event.

  • Greenwashing risk is managed by substantiating every environmental claim with a traceable calculation, standard, or third-party certification reference.

Quick reference

Regulatory Compliance and Enforcement

  • A permit to practise is issued by the regulator and is distinct from a business licence or a municipal building permit; each is obtained separately.

  • An unauthorized practice complaint is investigated by the regulator's inquiry committee, which may dismiss, caution, or refer the matter to a discipline hearing.

  • Discipline penalties range from a reprimand through conditions on practice, suspension, to revocation, and are published where the Act requires publication.

  • A registrant must respond to a regulator's written inquiry within the stated period; failure to respond is itself a ground for disciplinary action.

  • Practice review audits examine a sample of a registrant's sealed work for compliance with standards; the findings are used for improvement and for enforcement where warranted.

  • Title protection means only registrants may use the reserved designation; a non-registrant using the title commits an offence under the Act.

  • A cease-and-desist order may be issued where work presents an immediate risk to public safety, and takes effect before a hearing is held.

  • Registrants must keep the regulator informed of a change of address, employer, or practice status within the period prescribed by the bylaws.

Quick reference

Project Delivery and Quality Management

  • A quality management system defines the check, verify, and approve steps for each deliverable, and records who performed each step and when.

  • Independent check means the checker did not prepare the work; self-checking a calculation does not satisfy the verification requirement.

  • Design change control requires that a change be logged, assessed for effect on interfacing disciplines, approved, and reflected in every affected document.

  • A request for information is answered in writing and the answer becomes part of the contract record; unresolved requests are tracked to closure.

  • The critical path is the longest duration path through the network; any delay on that path delays project completion unless the path changes.

  • Earned value compares planned value, earned value, and actual cost; a cost performance index below one indicates cost overrun.

  • Commissioning verifies that installed systems perform to the design intent, and its records form part of the handover documentation.

  • As-built records reflect the installed condition, not the design intent, and are issued at substantial completion with the operating and maintenance manuals.