ASTTBC PPE flashcards
ASTTBC PPE · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Engineer of record
- The registrant who takes legal and professional responsibility for a design, its seal, and its compliance with applicable codes, regardless of who performed the detailed work.
- Scope of competence
- The boundary of tasks a registrant may perform unsupervised, established by education, training, and documented experience, and exceeded only under appropriate supervision.
- Seal and signature
- A mark certifying that the sealed document was prepared or directly supervised by the registrant, who accepts professional responsibility for its technical content.
- Continuing competence record
- A dated log of professional development activities retained by the registrant to demonstrate currency of knowledge when the regulator conducts an audit.
- Public interest paramount
- The principle that where client or employer interests conflict with public safety, the registrant's duty to protect the public takes precedence over confidentiality or loyalty.
- Conflict of interest
- A situation where a personal, financial, or family interest could reasonably be perceived to influence professional judgment, requiring written disclosure and possible withdrawal.
- Confidentiality exception
- Client information may be disclosed without consent only where required by law or court order, or where necessary to prevent a clear risk to life safety.
- Mandatory self-reporting
- The obligation to notify the regulator in writing, within the prescribed period, of a conviction, judgment, or disciplinary finding affecting fitness to practise.
- Factor of safety
- The ratio of ultimate or yield strength to allowable working stress, set higher where loads are uncertain or failure consequences are severe.
- Young's modulus
- The ratio of tensile stress to tensile strain in the elastic range, a measure of a material's stiffness expressed in units of pressure.
- Thermal expansion stress
- Stress generated when restrained material is prevented from expanding; it equals the modulus of elasticity multiplied by the coefficient of expansion and the temperature change.
- Ohm's law
- The relationship stating that voltage equals current multiplied by resistance in a linear circuit, with power equal to voltage times current.
- Continuity equation for pipes
- For incompressible flow, the volumetric flow rate equals cross-sectional area times velocity, so reducing diameter increases velocity proportionally.
- Measurement uncertainty
- A quantified range expressing the doubt in a measured value, combining instrument accuracy, resolution, and repeatability, and used to round the reported result.
- Design basis document
- A record of the code edition, load cases, assumptions, and references used in a design, sufficient for an independent reviewer to reproduce the calculations.
- Superseded drawing control
- The practice of marking earlier revisions as void while retaining them in the record, so that only the current revision is used for construction.
- Written confirmation of instruction
- A dated written record of a verbal site direction, issued within the contract period, which makes the instruction enforceable and retrievable.
- Observation versus interpretation
- A reporting convention separating measured facts from the author's inferences, so that conclusions remain traceable to stated evidence.
- Hierarchy of controls
- The ranking of hazard controls from most to least effective: elimination, substitution, engineering controls, administrative controls, and finally personal protective equipment.
- Lockout tagout
- A procedure isolating all energy sources, verifying a zero energy state by test, and removing locks only by the person who applied them.
- Confined space entry permit
- A written authorization requiring pre-entry atmospheric testing for oxygen, flammability, and toxicity, plus an attendant and a rescue plan.
- Incident investigation purpose
- To establish the sequence of events and contributing causes so that recurrence is prevented, with findings kept separate from disciplinary proceedings.
- Life-cycle assessment
- An accounting of environmental impacts across material extraction, manufacture, use, and end of life, expressed per functional unit for valid comparison.
- Embodied carbon comparison
- A comparison of greenhouse gas emissions per declared unit that is valid only where system boundaries and service life assumptions match between options.
- Phased environmental site assessment
- A staged investigation beginning with records review and a site visit, proceeding to sampling and analysis only where the first phase identifies potential contamination.
- Fail-safe design
- A design approach ensuring that loss of a single element produces warning and controlled behaviour rather than progressive collapse or sudden failure.
- Permit to practise
- The annual authorization issued by the regulator allowing a registrant to practise, separate from a business licence or a municipal building permit.
- Title protection
- A statutory provision reserving a professional designation for registrants, making its use by a non-registrant an offence under the governing Act.
- Cease-and-desist order
- A regulator's direction halting work that presents an immediate risk to public safety, effective before any hearing is convened.
- Independent check
- A verification step performed by a qualified person who did not prepare the work, documented with the checker's identity and the date.
- Critical path
- The longest duration sequence of dependent activities through a project network, whose delay directly delays project completion unless the path changes.
- Cost performance index
- Earned value divided by actual cost; a value below one indicates the work performed has cost more than the budgeted amount.