BC Gas Fitter ARD · Give each week a clear focus.
8 weeks · About 7 hours per week
Gas Fitting & Electrical
Map every code section and formula list for Gas Fitting into a personal index with page references
Explain gas piping sizing variables (load, length, pressure drop, specific gravity) aloud without notes
Define electrical units (voltage, current, resistance, power) and state Ohm's law and the power equation from memory
Solve ten series and parallel resistance and current problems with worked steps shown
Your checkpoint
A 2-page handwritten reference sheet covering gas sizing variables and basic electrical formulas, self-tested with a 15-question quiz scored at 80% or higher
Gas Fitting & Electrical
Size branch and main gas lines for three practice layouts using the appropriate sizing tables
Identify combustion air requirements and ventilation methods for appliance installations
Trace a residential electrical circuit from panel to load and label every component
Interpret conductor ampacity, overcurrent protection, and grounding requirements for two sample scenarios
Your checkpoint
Three completed gas pipe sizing worksheets plus two labeled circuit diagrams, each checked against code references with errors corrected in red
Gas Fitting & Electrical
Describe venting categories, termination clearances, and connector requirements for common appliances
Perform gas leak test and pressure test procedures in the correct sequence
Calculate voltage drop for two branch circuits and compare results to allowable limits
Explain bonding and grounding requirements for gas piping and appliances
Your checkpoint
A written 20-step commissioning checklist combining gas pressure testing and electrical verification, with code citations for each step
Gas Fitting & Electrical
Complete a timed 40-question mixed Gas Fitting and Electrical practice set
Diagnose five fault scenarios (no ignition, weak flame, tripped breaker, open neutral, reversed polarity)
Recite the safety shutdown and lockout sequence for gas and electrical work
Review every missed practice question and write the underlying rule in your own words
Your checkpoint
Practice test score log showing domain-by-domain results, with a one-page error analysis listing each missed concept and its corrected rule
Plumbing & Steamfitting
Map Plumbing code sections on fixture traps, venting, and drainage slope into your personal index
Size a DWV system for a two-bathroom layout including vent stack and fixture units
Define steam system components (boiler, trap, header, condensate return) and state the function of each
Explain the relationship between pressure, temperature, and saturated steam using steam tables
Your checkpoint
A completed DWV sizing worksheet for a two-bathroom plan plus a labeled steam system schematic with every component annotated
Plumbing & Steamfitting
Calculate water supply demand and pipe sizing for a single-family dwelling
Describe cross-connection control and backflow prevention methods with installation examples
Identify steam trap types and match each to its typical application
Explain safety devices on steam and hot water systems (relief valves, low-water cutoff, expansion control)
Your checkpoint
A water supply sizing calculation packet with all steps shown, plus a comparison table of at least five steam trap types with application notes
Plumbing & Steamfitting
Complete a timed 40-question mixed Plumbing and Steamfitting practice set
Troubleshoot five scenarios (poor drainage, gurgling trap, water hammer, failed trap, low steam pressure)
State installation clearances and support spacing requirements for piping in both domains
Review missed questions and reconcile answers against code text
Your checkpoint
Practice test score log for Plumbing and Steamfitting with a one-page error analysis and corrected code references
Gas Fitting & Electrical & Plumbing & Steamfitting
Complete two full-length timed mock exams under test-day conditions
Review all four domain reference sheets and consolidate into one master sheet
Drill the 25 highest-risk facts from each domain until recalled without hesitation
Rehearse exam-day logistics including time allocation per question
Your checkpoint
Two completed mock exam score sheets with both scores at or above the target pass mark, plus a final one-page master reference sheet
Milestones
Week 2: Score 80% or higher on a self-made 20-question quiz covering Gas Fitting sizing and basic electrical formulas
Week 4: Score 75% or higher on the timed 40-question Gas Fitting and Electrical mixed practice set, with no domain below 65%
Week 6: Score 80% or higher on a self-made 20-question quiz covering DWV sizing and steam system components
Week 7: Score 75% or higher on the timed 40-question Plumbing and Steamfitting mixed practice set, with no domain below 65%
Week 8: Achieve the target pass mark on both full-length mock exams and confirm all four domain reference sheets are complete