BOABC Plumbing Level I study materials
BOABC Plumbing Level I study resources

BOABC Plumbing Level I flashcards

BOABC Plumbing Level I · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Building drain
The lowest piping of a drainage system that receives waste from fixtures inside the building and conveys it to the building sewer, which begins outside the building wall.
Building sewer
The pipe that carries sewage from the building drain to the public sewer or private disposal system, beginning outside the building foundation wall.
Trap seal depth
The vertical distance between the trap weir and the top of the trap dip; the code requires a seal of 2 to 4 inches to prevent sewer gas entry.
Vent stack termination
A vent must extend at least 6 inches above the roof and at least 10 feet from any operable window, door, or outdoor air intake.
Backflow prevention
A device or assembly installed at a cross-connection between potable and nonpotable systems to prevent reverse flow and contamination of the drinking water supply.
Fixture unit
A dimensionless measure of the load a fixture places on the drainage or water-supply system, used to size pipe from code tables.
Drain slope requirement
Horizontal drainage pipe must slope at least 1/4 inch per foot for 2-inch and smaller pipe and 1/8 inch per foot for 3-inch and larger pipe.
Cleanout location
Cleanouts are required at the base of each stack, at the building drain and sewer junction, at direction changes over 45 degrees, and at intervals not exceeding 100 feet.
Plan review purpose
Plan review verifies that proposed plumbing work complies with the adopted code before a permit is issued and construction begins.
Riser diagram
A schematic drawing showing the vertical stacks, vents, and fixture connections in a plumbing system, used to verify venting and drainage layout during plan review.
Water closet clearance
A water closet must be at least 15 inches from its centerline to any side wall and have at least 30 inches of clear width in front.
Demand load method
A water-supply sizing method that totals fixture units, converts them to gallons per minute, and compares the result to pipe capacity at available pressure.
Plan set completeness
A plumbing plan set must include floor plans, riser diagram, fixture schedule, and connection point to the public sewer or private disposal system.
Cross-check disciplines
Plan review confirms that plumbing drawings align with architectural, structural, and mechanical drawings for penetrations, chases, and equipment locations.
Vent distance check
Plan review verifies that each trap's vent connection is within the code-allowed distance from the trap weir for the pipe size used.
Water service location
The plan must show the water service entry, meter, backflow preventer, and main shutoff valve so the inspector can verify installation.
Rough-in inspection
An inspection performed after piping is installed but before concealment, verifying slope, support, venting, and material compliance.
Water supply test
The potable water system is pressurized to at least working pressure, not less than 100 psi, for at least 15 minutes with no pressure drop.
DWV air test
A drain, waste, and vent system may be tested with air at 5 psi for 15 minutes as an alternative to a water test with a 10-foot head.
Final inspection
The last inspection confirming that fixtures, trim, water heater, gas piping, and all prior corrections are complete and operational.
Pipe support spacing
Horizontal cast-iron pipe is supported at 5-foot intervals for 2-inch pipe and 10-foot intervals for 4-inch and larger pipe.
Correction notice content
A written notice that cites the code section, describes the observed condition, and specifies the required corrective action and reinspection process.
Stop-work order
An order halting construction when work proceeds without a required permit or when a condition presents an immediate hazard to life or safety.
Inspection record
A dated entry documenting the inspector, the systems inspected, the findings, and any corrective action required, retained with the permit file.
Inspector authority limit
An inspector's authority extends only to the adopted code and permit scope; personal preference is not a valid basis for a correction.
Contemporaneous records
Field notes and photographs made at the time of inspection, dated and located, that serve as the official record of observed conditions.
Conflict of interest
A personal, family, or financial relationship that could influence an official decision; it must be disclosed and the inspector reassigned.
Means and methods
The contractor's chosen construction techniques; the inspector verifies code compliance but does not direct the contractor's means and methods.
Dispute resolution path
A contractor disputing a finding may request a written interpretation or file an appeal through the jurisdiction's established procedure.
Continuing education duty
Inspectors must stay current with the adopted code edition and local amendments through ongoing training and professional development.
Uniform enforcement
Permit fees, inspection scheduling, and enforcement actions must be applied consistently to all applicants; selective enforcement is an ethics violation.
Appeal period
An appeal of an inspector's decision must typically be filed with the board of appeals within 20 to 30 days after the decision.