The Deck That Was Never Permitted

CAHPI National Exam (CNE) · Put your knowledge to work in context.

All case studies

The Deck That Was Never Permitted

You are inspecting a 12-year-old detached house for a buyer. The rear deck is 12 ft by 16 ft, roughly 8 ft above grade, supported by 6x6 posts on concrete footings. The ledger board is attached to the rim joist with lag screws at roughly 16 in centres; you cannot see flashing at the top of the ledger. The joist hangers are present and appear properly sized, but several nails are missing from the hanger tabs. The guard is 36 in high with balusters spaced about 5 in apart. The buyer's agent tells you the deck does not appear on the municipal permit record and asks whether you will 'just note it as unpermitted.' The seller is present and listening.

1. Which of these observations fall within a standards-of-practice inspection, and which require engineering judgement beyond it?

Read the worked answer

A standards-of-practice inspection is a visual, non-invasive, performance-based assessment. Within that scope: the missing hanger nails, the absence of visible ledger flashing, the baluster spacing, and the guard height are all observable conditions I can report. The guard at 36 in and balusters at 5 in are worth flagging because current typical requirements call for a 36 in minimum guard and baluster openings that will not pass a 4 in sphere; a 5 in gap is a fall hazard for small children, and I can state that as an observation without pretending to be a code official. Beyond scope: determining whether the ledger connection is adequate. Lag screws at 16 in centres may or may not be sufficient depending on ledger length, joist spacing, siding type, and whether the fasteners engage the rim joist or only sheathing. Verifying that requires load calculations or an engineer's review. Similarly, I cannot confirm footing depth or soil bearing. My report should distinguish clearly between what I saw and what needs a specialist, and I should not certify structural adequacy I have not evaluated.

2. How do you handle the agent's request to 'just note it as unpermitted' in front of the seller?

Read the worked answer

I would decline the framing politely and redirect to what I actually know. I do not have access to the permit file, I have not verified the agent's claim, and permit status is a legal and administrative question, not an inspection finding. Writing 'unpermitted deck' in a report would be repeating hearsay as fact and could expose me to a defamation or negligence claim if it is wrong. What I can say is that the deck's visible construction details warrant verification of permit history and any required inspections, and that the buyer should confirm this with the local authority. Said in front of the seller, that language is neutral and factual. I would also make clear that permit status and structural adequacy are separate issues: even a permitted deck can have missing hanger nails. Keeping those threads distinct protects everyone and keeps the report defensible. If the agent pushes, I explain that my report describes conditions, and I do not editorialize about permits on anyone's say-so.

3. Draft the substance of what your report should say about the ledger connection and guard, and explain why that wording is defensible.

Read the worked answer

For the ledger: state that the ledger is fastened to the rim joist with lag screws at approximately 16 in centres, that flashing at the top of the ledger was not visible, and that the adequacy of the connection and the presence of proper flashing could not be determined by visual inspection. Recommend evaluation by a qualified deck contractor or structural engineer, and note that concealed water intrusion at an unflashed ledger is a common cause of rot in the rim joist. For the guard: state the measured height and baluster spacing, and note that the spacing exceeds the 4 in sphere commonly used as a child-safety benchmark, creating a fall-through hazard. This wording is defensible because every clause is tied to something I measured or saw, the limitations are explicit, and the recommendations name who should act. It avoids declaring the deck unsafe or the connection inadequate, which I cannot support, while still giving the buyer the information they need to make a decision. The report protects the client and the inspector at the same time.