Home Inspection Standards of Practice (CAHPI Standards of Practice or CSA A770)

  • The standard defines a visual, non-invasive, readily accessible inspection of installed systems and components; it is not a code-compliance audit, warranty, or technically exhaustive evaluation.

  • Readily accessible means observable without moving stored goods, dismantling, or using destructive means; concealed areas and areas obstructed by finishes, insulation, or stored items are excluded.

  • Core systems within scope: structure, exterior, roofing, plumbing, heating, cooling, electrical, interior, insulation and ventilation, and fireplaces and solid-fuel appliances.

  • Inspectors are not required to walk on roofs; where safe access is unavailable, the roof is inspected from the ground, eaves, or windows and the limitation is reported.

  • Reportable conditions include safety hazards, systems near or beyond typical service life, material defects, and items not functioning as intended; cosmetic and decorative items are excluded.

  • Exclusions commonly include septic systems, wells, pools, underground items, environmental testing (mold, radon, asbestos), and code or bylaw compliance verification.

  • Limitations and exclusions must be stated in the written report; the report identifies inspected components, conditions observed, and recommendations for further evaluation.

  • A standards-compliant inspection does not guarantee future performance; the report describes the condition at the time of inspection under the conditions present.

Quick reference

Code of Ethics

  • Primary duty is to the client; the inspector must avoid conflicts of interest, including undisclosed referral fees or compensation from parties with a stake in the transaction.

  • Inspectors must not accept compensation from more than one party for the same inspection without full written disclosure and consent of all parties.

  • Findings must be reported honestly and objectively; inspectors must not soften or omit adverse findings to favor a sale, agent, or referral relationship.

  • Confidentiality: report contents and client information are not disclosed to third parties without client consent, except as required by law or for a legal proceeding.

  • Competence rule: an inspector accepts work only within their training and experience, or discloses the limitation and recommends a qualified specialist.

  • Continuing education and adherence to the standards of practice are ongoing obligations; misrepresentation of qualifications or credentials is prohibited.

  • Advertising and public statements must be truthful and not misleading; inspectors must not disparage competitors with false or unverifiable claims.

  • Where the inspector has a personal or financial interest in the property or a related business, that interest must be disclosed in writing before accepting the engagement.

Quick reference

Technical Knowledge of Home Systems and Components

  • Roofing: asphalt shingles are typically rated 15-25 years; granules in gutters, curling, and exposed mat signal aging; flashing failures at valleys, chimneys, and penetrations are common leak points.

  • Structure: visible foundation cracks are judged by width, displacement, and pattern; diagonal cracks at corners and stair-step masonry cracks suggest differential settlement.

  • Electrical: a standard circuit is 120 V; a 15 A circuit supports about 1,800 W and a 20 A circuit about 2,400 W (W = V x A); GFCI protection is required in wet locations and AFCI in bedrooms per modern codes.

  • Plumbing: water supply is typically 40-80 psi; a TPR valve on a water heater discharges at 150 psi or 210 degrees F, and its discharge pipe must run downhill to within 6 inches of the floor or exterior.

  • Heating: a forced-air gas furnace requires combustion air and a properly sloped, sealed flue; a heat exchanger crack is a carbon monoxide hazard and warrants immediate evaluation.

  • Cooling: a refrigerant system is checked for temperature differential (commonly 15-22 degrees F between return and supply) and for condensate drainage and clear outdoor unit airflow.

  • Insulation and ventilation: attic insulation is measured in R-value; ventilation is typically 1 square foot of net free vent area per 150 square feet of attic floor when no vapor retarder is present.

  • Exterior and site: grading should slope away from the foundation at roughly 6 inches over the first 10 feet; downspouts should discharge away from the foundation to limit water intrusion.

Quick reference

Professional Practice and Reporting

  • A written report is delivered within the time frame agreed in the contract; it identifies the inspector, client, property, date, and the standard followed.

  • Each observation should state the component, the condition, the implication, and a recommendation (monitor, repair, or further evaluation by a qualified specialist).

  • Photographs supplement but do not replace written narrative; captions must be accurate and not imply conditions beyond what was observed.

  • The pre-inspection agreement should define scope, exclusions, limitations, fee, and dispute resolution before the inspection begins.

  • Client communication: confirm scope expectations, explain that the inspection is visual and non-invasive, and clarify that the report is not a warranty.

  • Records and reports should be retained per the agreement and applicable law; documentation supports defensibility if a complaint or claim arises.

  • Language in reports should be factual and non-alarmist, avoiding definitive engineering conclusions the inspector is not qualified to make.

  • Referrals to specialists should be specific to the observed condition (for example, a licensed electrician for an unsafe panel condition) and documented in the report.