CAHPI National Exam (CNE) flashcards
CAHPI National Exam (CNE) · Build recall with a focused review session.
31 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Readily accessible
- A condition where a system or component can be observed without moving stored goods, dismantling, or destructive action. Concealed or obstructed areas are outside the inspection scope.
- Visual non-invasive inspection
- An inspection performed by observation of installed systems using normal operating controls, without dismantling or destructive testing. It is not technically exhaustive or a code-compliance audit.
- Scope of standards inspection
- The standard covers structure, exterior, roofing, plumbing, heating, cooling, electrical, interior, insulation and ventilation, and fireplaces. Environmental and underground items are typically excluded.
- Roof access limitation
- Inspectors are not required to walk on a roof. When safe access is unavailable, the roof is observed from ground, eaves, or windows and the method is disclosed in the report.
- Reportable condition
- A condition that is a safety hazard, a material defect, a system near or beyond service life, or a component not functioning as intended. Cosmetic items are generally not reportable.
- Excluded systems
- Items commonly outside the standard include septic systems, wells, pools, underground components, and environmental testing such as mold, radon, and asbestos unless specifically contracted.
- Limitations disclosure
- The report must state conditions that limited the inspection, such as stored goods, locked areas, weather, or inaccessible components, so the client understands what was not observed.
- Duty to client
- The inspector's primary obligation is to the client. Findings must be reported honestly and objectively, without favoring agents, sellers, or referral sources.
- Conflict of interest
- A situation where the inspector has a personal or financial interest in the property or transaction. It must be disclosed in writing before the engagement is accepted.
- Undisclosed referral compensation
- Accepting fees or compensation from parties with a stake in the transaction without written disclosure and consent violates the code of ethics.
- Confidentiality of report
- Report contents and client information are not shared with third parties without client consent, except where required by law or in a legal proceeding.
- Competence limitation
- An inspector accepts only work within their training and experience. Where a condition exceeds that competence, the limitation is disclosed and a qualified specialist is recommended.
- Truthful advertising
- Public statements about qualifications, credentials, and services must be accurate and not misleading. False or unverifiable claims about competitors are prohibited.
- Continuing education obligation
- Inspectors must maintain and update their knowledge and skills through ongoing education and must adhere to the applicable standards of practice.
- Multiple-party compensation
- Accepting compensation from more than one party for the same inspection requires full written disclosure of the arrangement and consent from all parties involved.
- Asphalt shingle aging signs
- Granule loss in gutters, curling edges, and exposed mat indicate aging. Shingles are typically rated 15 to 25 years, and flashing at valleys and penetrations is a common leak point.
- Foundation crack evaluation
- Cracks are judged by width, displacement, and pattern. Diagonal cracks at corners and stair-step masonry cracks suggest differential settlement and warrant further evaluation.
- Electrical load formula
- Power in watts equals voltage times amperage. A 120-volt, 15-amp circuit supports about 1,800 watts, and a 20-amp circuit about 2,400 watts.
- GFCI and AFCI protection
- Ground-fault circuit interrupter protection is used in wet locations such as kitchens, baths, and exteriors. Arc-fault circuit interrupter protection is used on bedroom and living-area circuits.
- Water supply pressure
- Typical residential supply pressure is 40 to 80 psi. Pressure above 80 psi can stress fixtures and valves and may require a pressure-reducing valve.
- TPR valve discharge
- A water heater temperature-pressure relief valve opens at about 150 psi or 210 degrees F. Its discharge pipe must slope downhill and terminate within 6 inches of the floor or outside.
- Heat exchanger crack
- A cracked furnace heat exchanger can allow combustion gases into supply air, creating a carbon monoxide hazard. It requires immediate evaluation and typically shutdown.
- Refrigerant temperature differential
- A properly operating cooling system commonly shows a 15 to 22 degree F difference between return and supply air. Condensate drainage and outdoor airflow must also be verified.
- Attic ventilation ratio
- A common guideline is 1 square foot of net free vent area per 150 square feet of attic floor when no vapor retarder is present, or per 300 square feet with one.
- Site grading slope
- Soil should slope away from the foundation at roughly 6 inches over the first 10 feet. Downspouts should discharge well away from the foundation to reduce water intrusion.
- Report delivery requirement
- A written report is delivered within the time agreed in the contract. It identifies the inspector, client, property, inspection date, and the standard followed.
- Observation-recommendation format
- Each report item states the component, the observed condition, its implication, and a recommendation such as monitor, repair, or further evaluation by a qualified specialist.
- Pre-inspection agreement
- A contract signed before the inspection that defines scope, exclusions, limitations, fee, and dispute resolution. It establishes client expectations and supports defensibility.
- Photograph documentation
- Photographs supplement the written narrative but do not replace it. Captions must be accurate and must not imply conditions beyond what was actually observed.
- Report language standard
- Report language should be factual and non-alarmist. Inspectors avoid definitive engineering conclusions they are not qualified to make and recommend specialists where needed.
- Record retention
- Reports and supporting records are retained per the agreement and applicable law. Good documentation supports the inspector if a complaint or claim later arises.