CA CEG study materials
CA CEG study resources

CA CEG flashcards

CA CEG · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Energy Use Index
Annual energy consumption divided by a normalization basis such as floor area or production output, letting facilities of the same function be compared after weather and activity adjustments.
Load Factor
Average load divided by peak load over a period; a low value indicates demand charges could be reduced by flattening peaks or shifting load.
ASHRAE Level 2 Audit
A detailed energy survey that includes an energy balance, end-use breakdown, and cost and savings estimates for identified measures, exceeding a walk-through assessment.
Degree-Day Method
Estimates annual heating or cooling energy as building UA times annual degree days times 24 hours, divided by system efficiency, for quick screening of envelope or plant changes.
IPMVP Option C
Whole-facility metering approach that uses utility bills and a regression baseline adjusted for weather and activity to determine total facility savings from a project.
Routine Adjustment
A change to the baseline made for independent variables such as weather, occupancy, or production that vary during the reporting period but are not caused by the project.
Simple Payback
Initial project cost divided by annual savings, expressed in years; it ignores the time value of money and all savings occurring after payback.
Savings-to-Investment Ratio
Present value of project savings divided by present value of project investment using the owner's discount rate; a ratio above one indicates a favorable project.
Power Factor
The ratio of real power in kilowatts to apparent power in kilovolt-amperes; low values increase current, losses, and utility penalty charges.
Total Harmonic Distortion
The root-sum-square of harmonic voltage or current magnitudes above the fundamental divided by the fundamental magnitude, expressed as a percentage.
Demand Ratchet
A billing mechanism that sets monthly demand charges from the highest peak recorded in a prior window, often eleven or twelve months, so one spike raises costs for a year.
Sensible Heat Equation
For air, sensible heat in Btu per hour equals 1.08 times cubic feet per minute times the dry-bulb temperature difference in degrees Fahrenheit.
Chiller kW per Ton
Chiller electrical input in kilowatts divided by cooling output in tons; it equals twelve divided by the coefficient of performance.
Fan Affinity Law
For a centrifugal fan, airflow varies with speed, pressure with speed squared, and shaft power with speed cubed, so modest speed reductions yield large energy savings.
Boiler Combustion Efficiency
One hundred percent minus stack losses, determined from flue gas temperature and oxygen or carbon dioxide content; excess air raises stack losses.
Steam Trap Failure
A trap stuck open passes live steam and wastes fuel, while a trap stuck closed traps condensate, causing water hammer and reduced heat transfer.
Flash Steam
Steam produced when high-pressure condensate is reduced to lower pressure; it can be recovered to a low-pressure header instead of vented.
U-Factor
Thermal transmittance of an assembly in Btu per hour per square foot per degree Fahrenheit; it is the reciprocal of the assembly R-value.
Thermal Bridging
Heat flow through highly conductive paths such as framing, shelf angles, or balconies that bypass insulation and lower the effective R-value of an assembly.
Blower Door Test
A pressurization test that measures building air leakage, reported as air changes per hour at fifty pascals, used to quantify infiltration and locate leaks.
Luminous Efficacy
Light output in lumens divided by electrical input in watts; it measures how efficiently a lamp converts power into visible light.
Lighting Power Density
Connected lighting wattage divided by floor area in watts per square foot; it is compared with code allowances by space type.
VFD Cube Law
For centrifugal pumps and fans, shaft power varies with the cube of speed, so reducing speed to eighty percent cuts power to about fifty-one percent.
CHP Total Efficiency
Useful electric output plus useful thermal output divided by fuel energy input; well-matched combined heat and power systems reach seventy to eighty percent.
Heat Rate
Fuel energy input in Btu divided by electric output in kilowatt-hours; lower values mean more efficient generation, with 3,412 Btu per kWh as the theoretical floor.
Pinch Analysis
A method that matches process heat sources and sinks by temperature level to identify minimum utility use and waste heat recovery opportunities.
PV Capacity Factor
Actual annual photovoltaic generation divided by the output the array would produce at full rated capacity for all 8,760 hours of the year.
Betz Limit
The maximum theoretical fraction, about fifty-nine percent, of the kinetic energy in a wind stream that a turbine rotor can extract.
Levelized Cost of Energy
Total present value of a generating project's capital, operating, and financing costs divided by its present value of energy output over the analysis period.
Scope 2 Emissions
Indirect greenhouse gas emissions from purchased electricity, steam, heat, or cooling; they can be reported using grid-average or contractual market-based methods.
CO2 Equivalent
A common emissions unit computed by multiplying each greenhouse gas mass by its global warming potential relative to carbon dioxide over a stated horizon.
Renewable Energy Credit
A tradable certificate representing the environmental attributes of one megawatt-hour of renewable generation, separate from the underlying electricity commodity.