CA Fire Sprinkler · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Sprinkler System Design and Hydraulic Calculations

  • Classify the four main sprinkler system types (wet-pipe, dry-pipe, preaction, deluge) and match each to its design assumptions and typical occupancies

  • Compute required sprinkler discharge density and design area from a given occupancy hazard classification using the density/area method

  • Trace a simple tree or loop layout and identify node-by-node where hydraulic demand accumulates from the most remote head to the supply

  • Set up a handwritten hydraulic worksheet template with columns for flow, pressure, pipe size, length, and fitting equivalent length

Your checkpoint

A completed one-page hydraulic calculation worksheet for a single-branch wet-pipe system showing flow and pressure at every node, checked against a peer or reference solution

Week 2

Sprinkler System Design and Hydraulic Calculations & Piping Materials, Fittings, and System Components

  • Apply the Hazen-Williams formula to compute friction loss in at least five pipe segments of varying diameter and flow

  • Determine equivalent pipe lengths for common fittings and valves using manufacturer or standard tables

  • Select appropriate pipe materials (black steel, CPVC, copper, galvanized) for a given water quality and occupancy scenario and justify the choice

  • Size branch lines, cross mains, and feed mains for a sample layout and verify balance between branch lines

Your checkpoint

A full hydraulic calculation package for a two-story light-hazard building including friction loss, elevation pressure, fitting losses, and safety margin, with a written summary of the controlling factor

Week 3

Water Supply, Standpipes, and Fire Pumps

  • Evaluate a water supply curve and determine available pressure at the required flow for a design scenario

  • Compute fire pump churn, rated, and overload pressures and select a pump curve that meets demand without overpressurizing the system

  • Distinguish standpipe classes and sizing requirements and integrate standpipe demand into a combined system calculation

  • Identify when a water storage tank, suction arrangement, or backflow preventer affects the available supply

  • Explain the role of a flow test in establishing supply and interpret pitot and gauge readings

Your checkpoint

A water supply analysis memo that plots supply versus demand curves for a sample project and states whether a fire pump is required, with pump selection rationale

Week 4

Installation, Hangers, Bracing, and Seismic Restraint

  • Determine hanger spacing and rod sizing for different pipe diameters and schedules based on support load

  • Locate sway bracing, lateral bracing, and restraint points on a sample riser and feed main layout

  • Identify seismic separation, flexible coupling, and clearance requirements for a project in a high-seismic California zone

  • Plan penetration, sleeve, and clearance details where pipe passes through rated and non-rated assemblies

Your checkpoint

A marked-up isometric drawing of a sample system showing hanger locations, brace types, and restraint points with a supporting schedule of spacing and rod sizes

Week 5

NFPA Standards, Codes, and Plan Review/Inspection Requirements

  • Map each major NFPA sprinkler standard to its scope and explain which governs design, installation, or inspection

  • Perform a plan review checklist walk-through on a sample submittal and log every deficiency with the specific requirement cited

  • Prepare a pre-final inspection checklist covering hydrostatic test, flushing, alarm devices, and signage

  • Describe the contractor's responsibilities during acceptance testing and the documentation required at turnover

Your checkpoint

A completed plan review report on a sample submittal listing at least ten deficiencies with code citations and a corrected action for each

Week 6

Contracting Business, Estimating, Bidding, and Project Management & Safety, Testing, and Maintenance of Sprinkler Systems

  • Build a material takeoff from a set of sprinkler plans and price the major components

  • Assemble a bid with labor, material, overhead, and contingency and identify the largest cost risks

  • Draft a project schedule showing rough-in, hydrostatic test, and final inspection milestones and their dependencies

  • Write a maintenance and inspection schedule covering gauges, valves, alarm devices, and obstruction investigation intervals

  • Explain the purpose and procedure of a main drain test and trip test and what results indicate a problem

Your checkpoint

A bid package for a sample project including takeoff, priced summary, schedule, and a one-page inspection and maintenance plan

Week 7

California Contractor License Law and Business Practices & Contracting Business, Estimating, Bidding, and Project Management

  • Distinguish the C-16 fire protection contractor classification from related classifications and identify work each may perform

  • Explain California licensing requirements for qualifying individuals, including the responsible managing employee role and limits on concurrent licenses

  • Describe contract requirements for written change orders, mechanics lien notices, and prompt payment timelines

  • Apply basic business practices including estimating overhead, tracking job costs, and managing subcontractor compliance

Your checkpoint

A written compliance checklist for a California fire sprinkler contractor covering licensing, contract, lien, and payment requirements, with a short scenario applying each item

Week 8

Sprinkler System Design and Hydraulic Calculations & Water Supply, Standpipes, and Fire Pumps & Installation, Hangers, Bracing, and Seismic Restraint & NFPA Standards, Codes, and Plan Review/Inspection Requirements & Contracting Business, Estimating, Bidding, and Project Management & Safety, Testing, and Maintenance of Sprinkler Systems & California Contractor License Law and Business Practices & Piping Materials, Fittings, and System Components

  • Review all eight domains using a timed mixed-topic practice set and log every missed item by domain

  • Re-derive the three calculations you missed most often until you can complete each without notes

  • Rewrite your weakest checklist or worksheet from earlier weeks from memory and compare it to the original

  • Build a final one-page reference sheet of formulas, spacing tables, and code scopes you can recreate on scratch paper

Your checkpoint

A scored full-length practice exam with a written error log mapping each mistake to a domain and a stated remediation step

Milestones

Week 2: Complete a full hydraulic calculation for a sample system without reference notes and score at least 80 percent against a provided solution

Week 4: Produce a correct hanger and bracing layout for a high-seismic sample project with no missing restraint points

Week 6: Deliver a priced bid package and inspection plan that a reviewer rates as complete on takeoff, labor, and code coverage

Week 8: Score at least 80 percent on the full-length practice exam with no domain below 70 percent