Quick reference

Business Organization and Financial Management

  • A California contractor license is required when a project's combined labor and materials cost exceeds $500.

  • The standard contractor license bond is $25,000; an LLC contractor must also file a $100,000 LLC contractor surety bond.

  • A license qualifier must pass the law and trade exams; an RME must be a bona fide employee, and an RMO must be an officer or owner.

  • Changing entity form, such as sole proprietor to corporation or a new LLC, generally requires a new contractor license; license numbers are not transferable.

  • Gross profit = revenue - direct job costs; net profit = gross profit - overhead.

  • Markup on cost = profit / cost; margin = profit / selling price; a 25% markup equals a 20% margin.

  • Break-even sales = fixed costs / (1 - variable cost ratio).

  • Working capital = current assets - current liabilities.

  • A cash-flow projection subtracts monthly cash outflows from inflows to identify the peak borrowing need.

Quick reference

Licensing and Business Law

  • License classifications: A = general engineering; B = general building; C = specialty trades.

  • A B licensee may perform general building work but must subcontract specialty work unless the B licensee also holds that specialty classification.

  • Contractor license numbers must appear on contracts, bids, advertisements, and business documents.

  • A contractor must be licensed at the time of bidding and throughout performance on public works.

  • Business and Professions Code section 7031 bars an unlicensed contractor from collecting compensation for work requiring a license.

  • CSLB may issue citations, suspend, or revoke a license for violations such as unlicensed contracting, false advertising, or failure to maintain required bonds.

  • A home improvement salesperson must be registered with CSLB and work under a licensed contractor.

  • An LLC contractor must be registered with the Secretary of State and maintain the required LLC surety bond in addition to the standard license bond.

  • Advertising must not be false or misleading, and use of an expired license number is prohibited.

Quick reference

Contracting Requirements, Plans, and Specifications

  • Drawing scale 1/4 inch = 1 foot means one-quarter inch on the plan equals 12 inches actual; multiply the plan measurement by 48.

  • CSI MasterFormat organizes specifications by divisions; Division 01 is General Requirements.

  • An addendum modifies bid documents before bid opening; an ASI modifies or clarifies work after contract award.

  • Written dimensions generally control over scaled measurements.

  • An RFI asks the design team to clarify plans or specifications; the response may support a change order.

  • Shop drawings show the contractor's proposed fabrication or installation details and require design professional approval.

  • Contract documents typically include the agreement, conditions, drawings, specifications, addenda, and change orders.

  • Plan symbols and abbreviations are defined in the drawing legend; the north arrow indicates orientation.

  • A revision cloud marks changed drawing areas, and the revision number or date identifies the change.

Quick reference

Estimating and Bidding

  • Bid price = direct costs + overhead + profit + contingency + applicable taxes.

  • Unit cost = material + labor + equipment cost per unit of work.

  • Order quantity = net quantity x (1 + waste factor).

  • A public works bid bond is typically 10% of the bid; performance and payment bonds are each 100% of the contract price.

  • Addenda must be acknowledged in the bid; failure to acknowledge may make the bid nonresponsive.

  • An unbalanced bid prices early or likely-increased items high and later items low; agencies may reject materially unbalanced bids.

  • Contingency covers unknown conditions and is not profit.

  • California's subcontractor listing law requires prime bidders on public works to list subcontractors in the bid.

  • A bidder may request withdrawal before award if a clerical error is proven under applicable law.

Quick reference

Contract Formation and Contract Performance

  • A valid contract requires offer, acceptance, consideration, mutual assent, capacity, and legality.

  • Contracts that cannot be performed within one year must be in writing under the statute of frauds.

  • Change orders should be written and signed by authorized representatives; they modify price, time, or scope.

  • Substantial completion is when the work is usable for its intended purpose; it triggers warranty and retention consequences.

  • Liquidated damages are enforceable only if they are a reasonable estimate of probable loss, not a penalty.

  • Excusable delay extends time; compensable delay also supports cost recovery.

  • Termination for cause requires material breach or a contract-specified default; termination for convenience follows contract notice requirements.

  • California prompt payment law sets deadlines for owner-to-prime and prime-to-subcontractor payments.

  • A constructive change arises from owner-directed work or differing site conditions without a formal change order.

Quick reference

Mechanics' Liens, Stop Notices, and Payment Bonds

  • A 20-day preliminary notice preserves full mechanics lien rights; late notice limits the lien to work performed in the 20 days before notice.

  • A direct contractor generally must record a mechanics lien within 90 days after completion; a recorded Notice of Completion shortens that period to 60 days.

  • A subcontractor or supplier generally must record a lien within 90 days after completion; a recorded Notice of Completion shortens that period to 30 days.

  • A lien foreclosure suit must be filed within 90 days after the lien is recorded.

  • A stop payment notice asks an owner or construction lender to withhold funds for the claimant.

  • Public works payment bond claimants generally cannot record mechanics liens against public property.

  • A conditional lien release is effective only when payment is received; an unconditional release is effective on signing.

  • The owner records a Notice of Completion to shorten lien periods.

  • A payment bond claim requires statutory notice and timely suit; exact deadlines depend on the claimant category.

Quick reference

Labor Laws and Employment Practices

  • Overtime is 1.5 times the regular rate for hours over 8 per day or 40 per week; double time applies over 12 hours per day or over 8 hours on the seventh consecutive day.

  • A 30-minute meal period is required before the end of the fifth hour; a second 30-minute meal period is required before the end of the tenth hour.

  • Rest breaks are 10 minutes per 4 hours worked or major fraction thereof.

  • Public works projects over $1,000 require prevailing wages and DIR-registered contractors and subcontractors.

  • Certified payroll records using form PWC-100 must be submitted weekly on California public works.

  • Wages must be paid at least twice per month on designated paydays.

  • Final wages are due immediately on termination and within 72 hours if an employee quits without notice.

  • Workers' compensation insurance is required for employees; sole proprietors may exempt themselves.

  • Apprenticeship ratios limit apprentices to a set ratio of journeymen, and apprentices must be registered.

Quick reference

Safety, Insurance, and Risk Management

  • The Cal/OSHA construction fall protection threshold is 7.5 feet.

  • Excavations 5 feet or deeper require a protective system when cave-in potential exists.

  • A competent person must inspect excavations daily and before worker entry.

  • Every California employer must have a written Injury and Illness Prevention Program (IIPP).

  • Heat illness prevention requires water, shade, rest breaks, and high-heat procedures at 95 degrees Fahrenheit.

  • Hazard Communication requires accessible safety data sheets and labeling for hazardous chemicals.

  • Scaffolds must be designed and erected by qualified persons and inspected before use.

  • Workers' compensation, general liability, and builder's risk are common construction insurance coverages.

  • Additional insured status and certificates of insurance verify and allocate risk among project parties.

Quick reference

Public Works Contracting

  • Public works include construction, alteration, demolition, or maintenance paid with public funds.

  • Prevailing wages apply to California public works projects over $1,000.

  • Contractors and subcontractors must register with the DIR and submit certified payroll weekly.

  • A bid bond is typically 10% of the bid; performance and payment bonds are each 100% of the contract price.

  • Retention on California public works is generally capped at 5%.

  • Award generally goes to the lowest responsible bidder submitting a responsive bid.

  • California's subcontractor listing law requires prime bidders to list subcontractors in the bid.

  • A public works stop notice is served on the public entity to reach withheld funds.

  • Public agency bid openings are public, and bids are sealed until the opening.

Quick reference

Project Administration and Closeout

  • A recorded Notice of Completion shortens lien periods and starts final payment deadlines.

  • Substantial completion makes the project usable for its intended purpose; final completion follows correction of punch list items.

  • Closeout documents include as-built drawings, O&M manuals, warranties, spare parts, and training records.

  • Final payment typically requires conditional or unconditional final lien releases.

  • Retention release follows contract terms and statutory periods; public works retainage is generally capped at 5%.

  • Final inspection and certificate of occupancy confirm code compliance before occupancy.

  • Contracts, change orders, payroll records, and lien releases must be retained for statutory periods.

  • The warranty period often starts at substantial completion.

  • Punch list items must be completed before final payment and retention release unless the contract states otherwise.