Scope of Work

The written description of all labor, materials, and services a contractor must provide under a contract. The foreperson uses it to confirm that crew activities match what was sold and priced.

Related: Change Order, Submittal
Change Order

A written, signed modification to the contract that adjusts scope, price, or schedule. Work should not proceed under a change until it is authorized, so the crew is not performing unpaid labor.

Related: Scope of Work, Request for Information
Request for Information

A formal written question sent to the designer to resolve unclear, conflicting, or missing contract information. The answer becomes part of the project record and may lead to a change order.

Related: Change Order, Submittal
Submittal

Product data, shop drawings, samples, or mockups the contractor sends for designer review before installation. Approved submittals confirm the specified product and become the standard the installed work is measured against.

Related: Mockup, Request for Information
Mockup

A full-size sample of finished work built on site for approval before production work begins. It sets the visual and workmanship standard the crew must match throughout the project.

Related: Submittal, Punch List
Punch List

A written list of incomplete or defective items identified near the end of a project. The foreperson assigns, tracks, and verifies closure of each item so final acceptance and payment are not delayed.

Related: Substantial Completion, Mockup
Substantial Completion

The stage when the work is sufficiently finished for the owner to use it for its intended purpose. It starts warranty periods, shifts certain risks, and triggers release of retainage under most contracts.

Related: Punch List, Retainage
Retainage

A percentage of each payment withheld by the owner until the project reaches defined milestones. Forepersons should understand it because slow punch work or missing documentation can hold up the company's cash.

Related: Substantial Completion, Pay Application
Pay Application

The periodic request for payment showing work completed and materials stored. It is supported by measured quantities and approved change orders, so accurate daily reporting directly affects how much the company is paid.

Related: Retainage, Daily Report
Daily Report

A record of crew hours, work performed, equipment used, weather, deliveries, visitors, and delays for each shift. It is the primary evidence for change orders, delay claims, and productivity analysis.

Related: Pay Application, Look-Ahead Schedule
Quality Control Plan

A written set of inspections, tests, and acceptance criteria the crew follows to prevent defects. It assigns who checks what and when, so problems are caught before work is covered or hidden.

Related: Inspection Hold Point, Mockup
Inspection Hold Point

A defined stage where work must stop and be inspected or tested before continuing. Skipping a hold point can force costly removal of finished work and may void manufacturer or code acceptance.

Related: Quality Control Plan, Three-Week Look-Ahead
Critical Path

The longest chain of dependent activities through a schedule, which sets the shortest possible project duration. Any delay on this path delays completion unless the sequence or resources are changed.

Related: Float, Three-Week Look-Ahead
Float (Slack)

The amount of time an activity can slip without delaying the project finish. Knowing which tasks have float helps a foreperson decide where to shift crew resources when a problem arises.

Related: Critical Path, Constraint Log
Three-Week Look-Ahead

A rolling short-interval schedule showing tasks planned for the next three weeks, with crews, materials, and constraints identified. It converts the master schedule into weekly commitments the foreperson can control.

Related: Constraint Log, Daily Report
Constraint Log

A running list of items blocking scheduled work, such as missing approvals, late materials, or unavailable equipment. Removing constraints before the task starts is what makes look-ahead schedules reliable.

Related: Three-Week Look-Ahead, Float (Slack)
Work Breakdown Structure

A hierarchical split of project scope into manageable work packages. It lets a foreperson assign crews, estimate labor hours, and track cost and progress at a level detailed enough to manage.

Related: Quantity Takeoff, Production Rate
Quantity Takeoff

A measured count of materials and work items derived from the drawings and specifications. Accurate takeoffs drive material orders, labor estimates, and progress measurement.

Related: Work Breakdown Structure, Production Rate
Production Rate

The amount of installed work a crew completes per unit of time, such as linear feet per hour. Comparing planned and actual rates reveals productivity problems while there is still time to correct them.

Related: Earned Value, Quantity Takeoff
Earned Value

A progress measurement comparing budgeted value of work completed against actual cost and planned schedule. It shows whether the crew is ahead or behind and whether labor is over or under budget.

Related: Production Rate, Work Breakdown Structure
Short-Interval Scheduling

Breaking work into short, committed periods, often one week, with clear assignments and measurable targets. Crews commit to specific quantities, and the foreperson reviews results to improve next week's plan.

Related: Three-Week Look-Ahead, Production Rate
Job Hazard Analysis

A step-by-step review of a task that identifies hazards and the controls needed before work starts. It is often documented on a pre-task card and reviewed with the crew at the start of the shift.

Related: Pre-Task Safety Meeting, Competent Person
Pre-Task Safety Meeting

A brief meeting before each shift or new task where the crew reviews hazards, controls, and emergency procedures. Documenting attendance and topics creates a record of the employer's safety communication.

Related: Job Hazard Analysis, Toolbox Talk
Toolbox Talk

A short, focused safety discussion on a single topic, such as ladder use or silica dust. Regular talks keep awareness high and provide documented evidence of ongoing safety training.

Related: Pre-Task Safety Meeting, Job Hazard Analysis
Competent Person

Someone who can identify existing and predictable hazards and has authority to take prompt corrective action. Many standards, such as excavation and scaffolding rules, require one to be designated.

Related: Job Hazard Analysis, Fall Protection
Fall Protection

Systems and practices that prevent workers from falling from heights or arrest a fall when it occurs. Requirements typically apply at six feet in construction and include guardrails, nets, and personal fall arrest.

Related: Competent Person, Personal Protective Equipment
Personal Protective Equipment

Gear worn to reduce injury, such as hard hats, safety glasses, gloves, and hearing protection. It is the last line of defense after elimination, substitution, and engineering controls have been applied.

Related: Fall Protection, Job Hazard Analysis
Excavation Protective System

Shoring, shielding, or sloping used to protect workers in trenches from cave-ins. A competent person must inspect the system daily and after events like rain or vibration.

Related: Competent Person, Confined Space
Confined Space

A space large enough to enter, with limited entry or exit, not designed for continuous occupancy. Entry may require testing, permits, and an attendant depending on the hazards present.

Related: Excavation Protective System, Lockout/Tagout
Lockout/Tagout

A procedure that isolates hazardous energy sources and applies locks and tags before servicing equipment. It prevents accidental startup or release of stored energy that could injure a worker.

Related: Confined Space, Job Hazard Analysis
Incident Investigation

A structured review of an accident or near miss to find root causes rather than blame. Findings should lead to corrected procedures, training, or equipment changes that prevent recurrence.

Related: Toolbox Talk, Job Hazard Analysis
Delegation

Assigning a task with the authority and resources needed to complete it, plus clear expectations. Effective delegation frees the foreperson for planning while developing the crew's skills.

Related: Span of Control, Constructive Feedback
Span of Control

The number of workers one supervisor can effectively direct. Wide spans require more delegation and clear procedures; narrow spans allow closer coaching but add supervisory cost.

Related: Delegation, Crew Balancing
Constructive Feedback

Specific, timely information about performance delivered to improve results, not to attack the person. It describes observed behavior and its impact and ends with a clear, agreed next step.

Related: Progressive Discipline, Delegation
Progressive Discipline

A stepwise response to repeated performance or conduct problems, typically verbal warning, written warning, suspension, then termination. Consistent documentation protects fairness and the employer's position.

Related: Constructive Feedback, Daily Report
Crew Balancing

Adjusting the number and mix of workers and equipment so no step in a sequence bottlenecks the others. Balanced crews keep each trade productive and reduce idle labor hours.

Related: Production Rate, Span of Control
Coordination Meeting

A scheduled meeting among trades and the general contractor to resolve interference, sequence, and access conflicts. Forepersons bring look-ahead needs and constraints so issues are solved before they stop work.

Related: Three-Week Look-Ahead, Constraint Log
Constructability Review

An early examination of drawings to find details that are difficult, unsafe, or impossible to build as shown. Catching these issues before mobilization avoids rework and costly field changes.

Related: Request for Information, Shop Drawing
Shop Drawing

A detail drawing prepared by a fabricator or contractor showing how a component will actually be made and installed. It translates design intent into fabrication dimensions and connections.

Related: Submittal, Constructability Review
Load-Bearing Element

A structural member that carries building loads to the foundation, such as beams, columns, and bearing walls. Removing or altering one without engineering approval can cause collapse.

Related: Constructability Review, As-Built Drawing
As-Built Drawing

A marked-up drawing showing the actual installed conditions, including deviations, buried utilities, and field changes. It guides future maintenance and prevents damage during later work.

Related: Shop Drawing, Load-Bearing Element