Gold Seal Superintendent flashcards
Gold Seal Superintendent · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Critical path
- The longest-duration path through a schedule network; its activities have zero total float in deterministic CPM and determine the minimum possible project duration.
- Total float formula
- Total float equals late start minus early start, or late finish minus early finish; it is the time an activity can be delayed without delaying project completion.
- PERT expected duration
- PERT expected duration equals optimistic plus four times most likely plus pessimistic, divided by six; it weights the most likely estimate most heavily.
- Resource leveling
- A scheduling technique that adjusts activity start and finish dates to resolve resource peaks or shortages; it may extend the project when it consumes critical-path float.
- Milestone
- A zero-duration schedule marker for a significant event, decision, or contractual date; it consumes no resources and is not a work activity.
- Schedule baseline
- The approved version of the project schedule used to compare progress and analyze delay; changing it requires formal approval through schedule control.
- Contingency
- A budget allowance for known-unknown risks within the approved project scope; it is controlled by the project team and drawn down as risks are realized.
- Cost performance index
- CPI equals earned value divided by actual cost; a value below one means the work performed cost more than budgeted.
- Estimate at completion
- EAC forecasts total project cost; a common formula is budget at completion divided by CPI when current cost efficiency is expected to continue.
- Labor burden
- The percentage added to base wages for payroll taxes, insurance, benefits, and statutory costs; it converts base labor rates into fully loaded labor costs.
- Quantity takeoff
- The measurement of net material quantities from drawings and specifications; waste, overlaps, and unit conversions are applied separately when pricing.
- Substantial completion
- The stage when the work is usable for its intended purpose although minor punch-list items remain; it commonly starts warranty and lien periods.
- Change order
- A written and signed contract amendment that changes scope, price, or time; a field instruction may need confirmation before it becomes a binding change.
- Compensable delay
- A delay caused by the owner or an owner-risk event that entitles the contractor to both a time extension and associated cost recovery, subject to contract notice rules.
- Lien holdback
- A statutory percentage withheld from progress payments under provincial construction lien law; its amount, release timing, and substitution rules vary by jurisdiction.
- Notice provision
- A contract clause requiring timely written notice of a claim or event; missing the deadline can bar entitlement even when the underlying claim is valid.
- Hierarchy of controls
- A ranked approach to hazard control: elimination, substitution, engineering controls, administrative controls, and personal protective equipment, from most to least effective.
- Risk score
- A priority value calculated as likelihood multiplied by severity; higher scores indicate hazards requiring earlier or stronger controls.
- Job hazard analysis
- A process that breaks a task into steps, identifies hazards at each step, and defines controls before work begins; also called a job safety analysis.
- Near miss
- An unplanned event that did not cause injury or damage but had the potential to do so; it is reported and investigated to prevent recurrence.
- Confined space entry
- Work inside a space with limited entry or exit and possible hazardous atmosphere; it requires assessment, testing, isolation, ventilation, a permit, an attendant, and rescue planning.
- Root cause
- The underlying management-system or design reason an incident occurred; it differs from immediate causes such as an unsafe act or condition.
- Quality assurance
- Planned process activities that prevent defects by establishing procedures, standards, training, and audits before and during construction work.
- Quality control
- Inspection, testing, and measurement of completed or in-process work against specified acceptance criteria to identify nonconforming results.
- Inspection and test plan
- A document listing work activities, acceptance criteria, inspection methods, frequencies, and hold or witness points required for quality verification.
- Cost of quality
- The sum of prevention, appraisal, internal failure, and external failure costs; external failures usually carry the highest total cost to the project.
- Nonconformance report
- A record of work that does not meet a requirement; it documents the condition, disposition, root cause, corrective action, and verification of closure.
- Tuckman team stages
- Forming, storming, norming, performing, and adjourning; teams often experience conflict during storming before stable performance develops.
- Communication channels formula
- The number of possible communication channels equals n times n minus one, divided by two, where n is the number of participants.
- Collaborating conflict mode
- A conflict approach that seeks a win-win solution by addressing both parties' concerns; it is useful when issues are important and time is available.
- SMART goals
- Goals that are specific, measurable, achievable, relevant, and time-bound; the format makes expected results and deadlines clear.
- Situational leadership
- A leadership model that adjusts directive and supportive behavior according to a follower's competence and commitment for a specific task.