CA Landscape study materials
CA Landscape study resources

CA Landscape cheat sheet

CA Landscape · Keep the key ideas within reach.

Quick reference

Plan Reading

  • Scale notation 1" = 10' means one measured inch on the sheet equals 10 feet on the ground; multiply plan inches by the scale factor to get field feet.

  • Contour lines connect points of equal elevation; the contour interval is the vertical distance between adjacent lines and appears in the legend.

  • Closely spaced contours indicate steep terrain; widely spaced contours indicate gentle slopes; concentric closed contours indicate a high or low point.

  • Percent slope = (rise ÷ run) × 100, so a 1-foot drop over a 20-foot run is 5%.

  • Existing contours are commonly dashed and proposed contours solid or labeled; comparing them reveals cut, fill, and grade change intent.

  • Spot elevations are point elevations given to hundredths of a foot and take precedence over values interpolated between contours.

  • A benchmark is a known elevation datum cited on the plan; every spot elevation and invert is referenced to it.

  • Detail callouts cite sheet and detail number (e.g., 3/S-501); section markers show the cut line and viewing direction.

  • Check the title block and revision cloud before pricing or layout - dated revisions supersede earlier sheets.

Quick reference

Estimating and Bidding

  • Cubic yards = (length ft × width ft × depth ft) ÷ 27.

  • A 4-inch slab uses about 0.0123 cubic yards of concrete per square foot (0.333 ft ÷ 27).

  • Approximate weights: aggregate 1.4 tons/CY, sand 1.35 tons/CY, topsoil 1.1–1.3 tons/CY; confirm with the supplier.

  • Plant count at square spacing = area ÷ spacing²; at triangular (staggered) spacing = area ÷ (spacing² × 0.866).

  • Waste factors: 5–10% for pavers, pipe, and edging; 10–15% for sod, seed, and plants to cover cuts and losses.

  • One cubic yard of mulch covers about 324 sq ft at 1 inch, 162 sq ft at 2 inches, and 108 sq ft at 3 inches.

  • Bid structure = direct job costs + overhead + profit + contingency; unit prices govern added or deleted work.

  • Labor cost = quantity ÷ productivity rate (units per crew-hour) × crew-hour cost, including burden.

  • Sod pallet coverage varies by cut and supplier (roughly 400–500 sq ft); verify before ordering.

Quick reference

Site Evaluation, Soils, and Drainage

  • Ribbon test: a ribbon under 1 inch indicates sandy loam, 1–2 inches loam to clay loam, over 2 inches clay.

  • Bulk density above roughly 1.6 g/cm³ in loam restricts root penetration; construction traffic is the usual cause.

  • Most landscape plants perform at pH 6.0–7.0; lime raises pH, elemental sulfur lowers it, and both require a soil test.

  • Collect a composite sample of 10–15 cores at 6–8 inch depth from across the planting area, mixed in one bag.

  • Provide a minimum 2% surface slope (about 1/4 inch per foot) away from structures; drainage swales are commonly 3–5%.

  • A French drain uses washed aggregate, filter fabric, and perforated pipe at about 1% slope to daylight or a sump.

  • Soil horizons: O organic, A topsoil, B subsoil, C parent material, R bedrock.

  • Infiltration (percolation) rate in inches per hour determines whether a site can absorb stormwater or needs storage/amended soils.

  • Cut-and-fill balance: size grading so on-site cut approximates fill, reducing haul-off and import costs.

Quick reference

Landscape Planning and Plant Selection

  • USDA hardiness zones are set by average annual minimum temperature; zone 7 spans roughly 0 to 10°F.

  • Light definitions: full sun = 6 or more hours of direct sun; part shade = 3–6 hours or filtered light; shade = under 3 hours.

  • Space plants by mature spread; for massing, set centers at roughly one-half to two-thirds of mature width.

  • Hydrozoning places plants of similar water need on the same irrigation valve so schedules can be matched.

  • Nomenclature: Genus species 'Cultivar' - genus and species italicized, cultivar in single quotes, not italicized.

  • Right plant, right place: match mature size, light, soil moisture, and root space to the site before choosing species.

  • Avoid regionally listed invasive species; native and regionally adapted plants generally reduce water, fertilizer, and pesticide inputs.

  • Design principles: unity, balance, scale/proportion, rhythm, and one dominant focal point per view.

  • In wildfire-prone areas, maintain a noncombustible zone roughly 0–5 feet from structures (defensible space).

Quick reference

Irrigation Systems Design and Installation

  • Sprinkler precipitation rate (in/hr) = (96.3 × GPM per sprinkler) ÷ (head spacing ft × row spacing ft).

  • Space sprinklers at 50–60% of published throw diameter (head-to-head or slightly less) to achieve uniform coverage.

  • All heads on one zone should have matched precipitation rates so the zone applies water evenly.

  • Keep flow velocity below about 5 ft/second in laterals to limit friction loss, noise, and water hammer.

  • Static pressure is measured with no flow; dynamic (operating) pressure is lower and is what the nozzles actually receive.

  • Backflow protection is code-required: an RPZ, PVB, or dual check. A PVB must be installed above the highest downstream head.

  • Drip emitters are rated 0.5–2.0 GPH; typical spacing is 12–18 inches, closer in sandy soil and wider in clay.

  • Cycle-and-soak scheduling runs short repeated cycles so water infiltrates instead of running off clay or sloped sites.

  • Winterizing blowouts should keep air pressure at the compressor near 50 psi or lower to avoid damaging heads, valves, and pipe.

Quick reference

Landscape Construction and Hardscape Installation

  • Compact aggregate base in 2–4 inch lifts to about 95% density; use 4 inches under walks and patios and 6–8 inches under driveways.

  • Slope pavers and flatwork 1–2% away from buildings; never direct surface flow toward a structure.

  • Concrete thickness: 4 inches for walks, 5–6 inches reinforced for driveways; control joints every 8–12 feet.

  • Setting beds: about 1 inch of sand for modular pavers; about 1/2–1 inch of mortar for mortared units.

  • Retaining walls: batter roughly 1 inch per foot of height, embed at least 6 inches plus 1 inch per foot of height, and backfill with drainage gravel and filter fabric.

  • Walls above about 4 feet, or any wall carrying surcharge, generally require engineered design and a permit.

  • Step geometry: risers 6–7 inches, treads 12–14 inches; verify with 2R + T = 24–27 inches.

  • Call 811 (the local one-call center) before any excavation and wait the required notice period.

  • Geotextile between base and subgrade prevents fines from migrating up into the aggregate layer.

Quick reference

Planting, Transplanting, and Establishment

  • Dig the planting hole 2–3 times the root ball width but no deeper than the ball; set the root flare at or slightly above grade.

  • Remove burlap, twine, and wire baskets from the root ball, and cut or straighten circling roots.

  • Backfill with native soil; heavy amendment of the backfill can discourage roots from growing out of the ball.

  • Irrigate new trees with roughly 10 gallons per inch of trunk caliper per week during the first growing season.

  • Apply mulch 2–4 inches deep over the root zone, pulled back 2–3 inches from the trunk.

  • Stake only when the root ball is unstable; use flexible ties with slack and remove them within 1–2 years.

  • Establishment period is roughly one year per inch of caliper; keep irrigation going through that window.

  • Plant bare-root stock while dormant; container and B&B stock can go in whenever soil is workable.

  • Install sod within 24–48 hours of delivery and keep it moist until it knits to the soil.

Quick reference

Landscape Maintenance and Renovation

  • One-third rule: never remove more than one-third of the blade height in a single mowing.

  • Mowing heights: cool-season turf 2.5–3.5 inches; warm-season grasses roughly 1–2 inches depending on species.

  • Three-cut pruning removes the weight first, then the stub, preserving the branch collar; avoid flush cuts.

  • Core aerification relieves compaction; dethatching removes thatch once it exceeds about 1/2 inch.

  • Fertilizer N-P-K rates follow a soil test; split applications and never exceed label rates.

  • Rejuvenation pruning cuts old stems to the ground to force vigorous new growth on overgrown shrubs.

  • Maintain mulch at 2–3 inches total depth; deeper piles can suffocate roots and harbor rodents.

  • Sharp mower blades and pruners make clean cuts that close faster and reduce entry points for disease.

Quick reference

Pest, Disease, and Weed Management

  • IPM sequence: cultural, mechanical/physical, biological, and chemical controls last.

  • Action threshold: treat only when pest numbers or damage exceed the level that justifies treatment cost and risk.

  • Preemergence herbicides must be applied before weed seed germination; crabgrass germinates near 55°F soil temperature.

  • Rotate herbicide mode-of-action groups to slow resistance, and never exceed labeled rates.

  • Disease triangle: susceptible host + virulent pathogen + favorable environment; breaking one leg prevents the disease.

  • Protectant fungicides coat tissue before infection; systemic products move within the plant and are used preventively or early.

  • Rule out abiotic causes (drought, salt, mower injury, poor drainage) before applying any pesticide.

  • The label is a legal document: follow directions, observe the restricted-entry interval, and use listed PPE.

Quick reference

Jobsite Safety and Regulatory Compliance

  • Baseline PPE: eye protection, hearing protection, head protection, sturdy boots, and gloves as the task requires.

  • Hearing protection is required at 85 dBA time-weighted average; chainsaws and backpack blowers commonly exceed 100 dBA.

  • Trench protective systems (shoring, shielding, sloping) are required at 5 feet depth; provide a ladder within 25 feet of workers at 4 feet.

  • Ladder rule: 4:1 slope, extend 3 feet above the landing, and maintain three points of contact.

  • Call 811 before digging and keep equipment at least 10 feet from energized power lines unless the utility de-energizes them.

  • Cut concrete and masonry wet or with water-fed tools plus a respirator to control respirable silica dust.

  • Safety Data Sheets must be accessible for every hazardous chemical on site; HAZCOM training precedes handling.

  • Heat illness prevention: water, rest, shade; acclimatize new workers and watch for confusion, cramps, and collapse.