CA Landscape study plan
CA Landscape · Give each week a clear focus.
8 weeks · About 7 hours per week
Landscape Construction and Hardscape Installation
Compute cut-and-fill quantities from spot elevations and a grading plan for a sloped yard.
Lay out a paver patio and a segmental retaining wall, calculating base aggregate, sand, and block counts from dimensions.
Interpret standard hardscape detail sections (footing, base course, edge restraint, drainage weep) and label each component on a hand sketch.
Sequence a hardscape installation from layout through compaction, and list the inspection hold points.
Calculate wall batter, embedment, and geogrid requirements for a 3-ft wall using a published gravity-wall rule of thumb.
Your checkpoint
A complete takeoff and step-by-step installation sequence for a 400 sq ft paver patio plus a 3-ft segmental block wall, with quantities, waste factors, and hold points listed.
Irrigation Systems Design and Installation & Landscape Construction and Hardscape Installation
Sketch a zone-by-zone irrigation layout, spacing heads to the manufacturer's published spacing-to-pressure ratio.
Calculate precipitation rate for each hydrozone and verify matched precipitation across head types.
Size lateral and mainline pipe using a flow-and-friction-loss chart, keeping velocity under the standard limit.
Write start-up, seasonal adjustment, and winterization checklists for a drip and a spray system.
Re-solve three hardscape quantity problems from Week 1 without notes to confirm retention.
Your checkpoint
A one-page irrigation design for a 5,000 sq ft two-hydrozone landscape including head layout, GPM per zone, pipe sizing, and precipitation-rate calculations.
Plan Reading, Estimating, and Bidding & Site Evaluation, Soils, and Drainage
Convert scaled plan measurements to field dimensions and build a material takeoff from a residential landscape plan set.
Assemble a bid with labor, material, equipment, overhead, and profit, and identify the line items most likely to be omitted.
Classify soil texture by feel and by jar-settling test, then state the drainage implications of each result.
Compute slope percentage and size a swale or French drain to carry a design storm flow.
Distinguish the contract documents (plan, spec, general conditions) and identify which governs in a conflict.
Your checkpoint
A sealed bid package containing a full takeoff, unit-cost build-up, and a one-page drainage calculation sheet for a site with a 5% slope.
Landscape Planning and Plant Selection & Planting, Transplanting, and Establishment
Match at least 25 plants to specified light, water, soil, and spacing conditions and justify each selection.
Produce a planting plan with a plant schedule, spacing, and quantity counts verified against the plan area.
Write the transplanting procedure for balled-and-burlapped and container stock, including pit width, depth, and backfill.
Calculate amendment and mulch volumes from bed area and application depth.
Explain establishment watering schedules for the first 90 days by plant type.
Your checkpoint
A planting plan with plant schedule, spacing, and quantities for a 2,000 sq ft bed, plus a 25-question self-quiz on Domains 1-6 scored at 70% or better.
Planting, Transplanting, and Establishment & Landscape Maintenance and Renovation
Diagnose five establishment failures (girdling roots, planted too deep, salt burn, drought stress, wrong exposure) from symptom descriptions.
Build an annual maintenance calendar covering pruning, fertilization, mowing height, aeration, and renovation timing.
Select the correct pruning cut for a given situation and state the season for each plant category.
Evaluate a renovation site and prescribe soil remediation, plant removal, and replanting sequence.
Refine the Week 4 planting plan using maintenance constraints such as mature size and access.
Your checkpoint
A 12-month maintenance calendar for one representative residential property with task, timing, and labor hours per visit.
Landscape Maintenance and Renovation & Pest, Disease, and Weed Management
Identify common landscape weeds by growth habit and lifecycle, and match each to an appropriate control strategy.
Explain integrated pest management thresholds and when chemical control is justified.
Differentiate fungal, bacterial, and abiotic plant damage from symptom patterns.
Read a pesticide label for rate, re-entry interval, and restricted-entry precautions, and record them correctly.
Revisit irrigation scheduling as a disease-management tool and adjust a sample schedule.
Your checkpoint
A pest and weed identification and control matrix covering 15 organisms with lifecycle, threshold, and control method, self-scored at 80% or better.
Jobsite Safety and Regulatory Compliance & Plan Reading, Estimating, and Bidding & Site Evaluation, Soils, and Drainage
Conduct a written jobsite hazard assessment for trenching, hauling, and power equipment, listing controls.
List the regulatory requirements that apply to a residential landscape job, including permits, utility locates, and water-use rules.
Re-work the weakest two domains from the Week 4 quiz, re-deriving the underlying formulas from scratch.
Build a one-page formula and reference sheet from memory, then verify it against source material.
Your checkpoint
A completed jobsite safety and compliance checklist plus a verified one-page formula sheet covering estimating, drainage, and irrigation math.
Plan Reading, Estimating, and Bidding & Site Evaluation, Soils, and Drainage & Landscape Planning and Plant Selection & Irrigation Systems Design and Installation & Landscape Construction and Hardscape Installation & Planting, Transplanting, and Establishment & Landscape Maintenance and Renovation & Pest, Disease, and Weed Management & Jobsite Safety and Regulatory Compliance
Take two full-length timed practice exams under test conditions and score each by domain.
Review every missed item, write the correct reasoning, and re-test those items after 48 hours.
Drill the two lowest-scoring domains until each reaches 75% or better on a fresh set.
Finalize the formula sheet and confirm the exam-day logistics and permitted reference materials.
Your checkpoint
Two scored practice exams with a domain-by-domain error log, and a final readiness summary showing 80% or better overall with no domain below 70%.
Milestones
Week 2: Irrigation and hardscape calculations reproduce correctly without notes: zone GPM, precipitation rate, pipe sizing, and paver/wall quantities all within 10% of the answer key.
Week 4: Midpoint self-quiz on Domains 1 through 6 scored at 70% or better, with a written list of the three weakest subtopics.
Week 6: Maintenance and pest/weed matrices completed and self-scored at 80% or better, and the 12-month calendar is complete for every month.
Week 8: Two full timed practice exams averaged at 80% or better overall, with no single domain below 70% and the formula sheet reproducible from memory.