OBC Complex Buildings · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Building Classification and Occupancy of Complex Buildings & Plan Review, Permits, and Inspection Procedures

  • Classify ten mixed-use complex buildings by occupancy group and construction type using code definitions, writing the governing section for each decision

  • Distinguish separated versus nonseparated mixed occupancies and state when each approach is permitted

  • Map the permit and plan review sequence for a complex building from submittal through certificate of occupancy

  • Draft a one-page occupancy classification worksheet you can reuse on practice scenarios

Your checkpoint

Completed occupancy classification worksheet for ten practice buildings with cited code sections and a written justification for each choice

Week 2

Building Classification and Occupancy of Complex Buildings & Plan Review, Permits, and Inspection Procedures

  • Apply height and area limits to complex buildings and calculate allowable increases for sprinklers and frontage

  • Identify when a building must be treated as high-rise and list the additional plan review triggers that follow

  • Assemble the document set a reviewer expects for a complex building submittal

  • Compare inspection milestones for structural, fire-rated, and MEP rough-in phases

Your checkpoint

Height and area calculation packet for three practice buildings including frontage and sprinkler increase math with a submittal checklist

Week 3

Fire Safety and Life Safety Systems

  • Select the correct fire sprinkler and standpipe approach for a mixed-occupancy building and justify the hazard classification used

  • Trace fire alarm notification and detection requirements room by room through a sample floor plan

  • Explain how fire barriers and fire walls differ and where each is required to separate occupancies

  • Summarize smoke control and stair pressurization triggers for high-rise conditions

Your checkpoint

Annotated sample floor plan marking sprinkler coverage, alarm devices, and fire-resistance-rated separations with a short written rationale

Week 4

Fire Safety and Life Safety Systems & Means of Egress and Accessibility

  • Calculate occupant load for each area of a complex building using the correct density factors

  • Verify egress width, travel distance, and common path limits against the calculated loads

  • Evaluate exit remoteness and dead-end conditions on two practice layouts

  • Identify where the fire command center and interior finish limits apply

Your checkpoint

Occupant load and egress compliance report for two practice floor plans with pass or fail findings and corrections noted

Week 5

Means of Egress and Accessibility & Structural Requirements and Building Envelope

  • Design an accessible route from site arrival through the building to each occupancy, including vertical circulation

  • Check accessible means of egress and areas of refuge requirements for a high-rise scenario

  • Verify structural fire-resistance ratings for primary frame, floor assemblies, and shaft enclosures

  • Assess exterior envelope requirements for separation distance, openings, and fire department access

Your checkpoint

Accessibility and structural fire-resistance review sheet covering accessible route, area of refuge, and required assembly ratings for one practice building

Week 6

Mechanical, Electrical, and Plumbing Systems Coordination & Fire Safety and Life Safety Systems

  • Coordinate penetration protection and firestopping details across structural and MEP trades

  • Locate where duct smoke detectors, fire dampers, and shaft ratings are triggered by the mechanical design

  • Trace emergency power and standby power distribution serving life safety loads

  • Identify conflicts between sprinkler main routing and structural or mechanical elements and propose resolutions

Your checkpoint

Coordination matrix listing ten common MEP and life safety conflicts with the responsible trade, code basis, and resolution for each

Week 7

Plan Review, Permits, and Inspection Procedures & Structural Requirements and Building Envelope

  • Run a full plan review of a practice complex building using your accumulated checklists

  • Write correction notices that cite the requirement and state the fix clearly

  • Sequence special inspections and acceptance testing for fire-rated and life safety systems

  • Prepare the documentation needed to close out a certificate of occupancy

Your checkpoint

Complete mock plan review with a written correction notice set of at least eight findings and a closeout documentation list

Week 8

Building Classification and Occupancy of Complex Buildings & Fire Safety and Life Safety Systems & Structural Requirements and Building Envelope & Means of Egress and Accessibility & Mechanical, Electrical, and Plumbing Systems Coordination & Plan Review, Permits, and Inspection Procedures

  • Consolidate all domain checklists into a single review workflow you can apply under time pressure

  • Complete two timed mixed-domain practice sets and analyze every missed item by root cause

  • Rehearse explaining code decisions aloud to test recall and defensibility

  • Confirm weak areas are resolved or flagged for continued review

Your checkpoint

Final integrated review workflow plus a scored timed practice results log with root-cause notes for each miss

Milestones

Week 2: Correctly classify and size ten of twelve practice buildings, citing the governing code section for each

Week 4: Score at least 80 percent on a self-made occupant load and egress quiz without notes

Week 6: Complete the coordination matrix and explain each conflict aloud in under ten minutes

Week 8: Score at least 80 percent on both timed mixed-domain practice sets and have a root-cause note for every miss