OBC HVAC - House · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Heating, ventilating and air-conditioning systems: Part 6 requirements applicable to houses

  • List every Part 6 requirement that reaches a single-family house HVAC system, writing a one-sentence plain-language rule beside each section number.

  • Explain in writing how Part 6 and Part 9 divide responsibility for a house HVAC system, and identify the situations where the Part 9 provisions govern instead.

  • Draw a one-page decision flow that routes a given HVAC question (capacity, temperature, control, ventilation, exhaust) to the correct Part.

  • Work 25 practice items on Part 6 scope and record the score plus a written cause for each wrong answer.

Your checkpoint

A one-page Part 6 map with section-by-section rules, the applicability decision flow, and a scored 25-item error log.

Week 2

Part 9 residential HVAC design and installation - heating and cooling load, equipment and controls

  • Perform a full heating and cooling load calculation for a sample two-storey house using the referenced residential load method, showing every input and assumption.

  • Size heating and cooling equipment from those loads and justify the selected capacity margin in a short written rationale.

  • Specify the control strategy for the sample house - thermostats, zoning, fan operation, humidification - and cite the Code basis for each control.

  • Compare your computed loads against a rule-of-thumb estimate and explain, in writing, why the detailed method governs.

Your checkpoint

A complete load calculation worksheet for the sample house with a matching equipment and controls selection sheet, each item referenced to a Code clause.

Week 3

Ductwork, air distribution, ventilation and exhaust systems for houses

  • Trace the full air path from return grille to supply diffuser on a sample layout and label the duct sizing basis at each segment.

  • Size supply, return and branch ducts for three rooms of the sample house, documenting the friction rate and velocity limits applied.

  • Select and locate exhaust systems for kitchen, bathrooms and clothes dryer, verifying each against the required ventilation rate and termination rules.

  • Design the whole-house ventilation provision and show how it coordinates with the exhaust and duct distribution already laid out.

Your checkpoint

A marked-up duct layout with sizing calculations for three rooms, plus a ventilation and exhaust schedule listing rates, terminations and Code references.

Week 4

Combustion air, venting, and clearances for fuel-fired appliances

  • Calculate the required combustion air for each fuel-fired appliance in a sample mechanical room using both the indoor-air and outdoor-air methods.

  • Determine and sketch the required clearance to combustibles for a furnace, water heater and vent connector, dimensioning each clearance on the drawing.

  • Diagram a venting arrangement for a mid-efficiency and a high-efficiency appliance, marking slope, termination height and any horizontal run limits.

  • Identify five common venting errors on a fabricated case and write the correcting Code rule for each.

Your checkpoint

An annotated mechanical-room drawing showing combustion air openings, all clearances dimensioned, and a venting diagram with the governing rule written beside each critical dimension.

Week 5

Fire protection considerations for HVAC - fire separations, fire dampers, penetration and opening protection & Administration, definitions and scope of the Building Code Act / OBC

  • Locate every required fire separation and fire-resistance rating that an HVAC installation can penetrate in a house, and record the rating for each.

  • Specify fire dampers, opening protection and penetration sealing for three representative duct penetrations, naming the listed assembly used.

  • Summarize the Building Code Act framework - scope, powers, owner and contractor duties - in a one-page written outline.

  • Explain in writing how a permit, an inspection and an order to comply fit into the Act's enforcement chain.

Your checkpoint

A penetration schedule listing each duct or pipe penetration, its required rating, and the damper or seal specified, plus a one-page Act outline.

Week 6

General provisions, referenced standards and permits/inspection requirements & Energy efficiency, insulation and building envelope coordination

  • List the referenced standards that a house HVAC design depends on and state, in one line each, what the standard controls.

  • Outline the permit application and inspection sequence for a residential HVAC alteration, identifying what must be shown on the submitted drawings.

  • Describe how insulation level, air barrier continuity and envelope tightness change the heating load and the ventilation requirement of the same house.

  • Quantify that effect by re-running the week 2 load calculation on a better-insulated, tighter version of the sample house and comparing results.

Your checkpoint

A permit-and-inspection checklist and a side-by-side load comparison table for the original versus upgraded envelope, with a written explanation of the differences.

Week 7

Plans, specifications, documentation and site review of HVAC installations

  • Draft a complete HVAC submission package for the sample house - drawings, equipment schedule, load summary and specification notes.

  • Compile a site review checklist that a reviewer could carry to a rough-in inspection, covering venting, clearances, duct sealing and combustion air.

  • Re-attempt the practice items missed in weeks 1 to 6 and write a corrected rule for any item still wrong.

  • Rank your nine domains by practice score and schedule the specific review blocks you will run in week 8.

Your checkpoint

A full sample submission package with site review checklist, plus a ranked weak-domain list and a written week 8 review schedule.

Week 8

Administration, definitions and scope of the Building Code Act / OBC & General provisions, referenced standards and permits/inspection requirements & Heating, ventilating and air-conditioning systems: Part 6 requirements applicable to houses & Part 9 residential HVAC design and installation - heating and cooling load, equipment and controls & Combustion air, venting, and clearances for fuel-fired appliances & Ductwork, air distribution, ventilation and exhaust systems for houses & Fire protection considerations for HVAC - fire separations, fire dampers, penetration and opening protection & Energy efficiency, insulation and building envelope coordination & Plans, specifications, documentation and site review of HVAC installations

  • Complete two full-length timed mock exams under exam conditions and score each against the domain weightings.

  • Re-study the three lowest-scoring domains from the mock results, writing a condensed rule card for each.

  • Recite the key numeric limits - clearances, ventilation rates, load margins, ratings - from memory and verify each against the Code.

  • Review every error log entry from weeks 1 to 7 and confirm each rule can now be stated without notes.

Your checkpoint

Two scored mock exams, three domain rule cards, and a signed-off error log showing every previously missed rule restated correctly.

Milestones

Week 2: Can complete a full house load calculation and equipment selection from a blank worksheet in under 90 minutes without notes, scoring at least 80% on 20 load-and-sizing practice items.

Week 4: Can dimension combustion air openings, all appliance clearances and a venting layout for an unfamiliar mechanical room, scoring at least 80% on 25 venting and clearance items.

Week 6: Can list the permit and inspection steps, the key referenced standards and the fire-resistance ratings for duct penetrations, scoring at least 75% on a mixed 30-item set drawn from domains 1, 2 and 7.

Week 8: Score at least 80% overall on both timed mock exams with no single domain below 70%, and restate every error-log rule correctly from memory.