OBC HVAC - House study plan
OBC HVAC - House · Give each week a clear focus.
8 weeks · About 7 hours per week
Heating, ventilating and air-conditioning systems: Part 6 requirements applicable to houses
List every Part 6 requirement that reaches a single-family house HVAC system, writing a one-sentence plain-language rule beside each section number.
Explain in writing how Part 6 and Part 9 divide responsibility for a house HVAC system, and identify the situations where the Part 9 provisions govern instead.
Draw a one-page decision flow that routes a given HVAC question (capacity, temperature, control, ventilation, exhaust) to the correct Part.
Work 25 practice items on Part 6 scope and record the score plus a written cause for each wrong answer.
Your checkpoint
A one-page Part 6 map with section-by-section rules, the applicability decision flow, and a scored 25-item error log.
Part 9 residential HVAC design and installation - heating and cooling load, equipment and controls
Perform a full heating and cooling load calculation for a sample two-storey house using the referenced residential load method, showing every input and assumption.
Size heating and cooling equipment from those loads and justify the selected capacity margin in a short written rationale.
Specify the control strategy for the sample house - thermostats, zoning, fan operation, humidification - and cite the Code basis for each control.
Compare your computed loads against a rule-of-thumb estimate and explain, in writing, why the detailed method governs.
Your checkpoint
A complete load calculation worksheet for the sample house with a matching equipment and controls selection sheet, each item referenced to a Code clause.
Ductwork, air distribution, ventilation and exhaust systems for houses
Trace the full air path from return grille to supply diffuser on a sample layout and label the duct sizing basis at each segment.
Size supply, return and branch ducts for three rooms of the sample house, documenting the friction rate and velocity limits applied.
Select and locate exhaust systems for kitchen, bathrooms and clothes dryer, verifying each against the required ventilation rate and termination rules.
Design the whole-house ventilation provision and show how it coordinates with the exhaust and duct distribution already laid out.
Your checkpoint
A marked-up duct layout with sizing calculations for three rooms, plus a ventilation and exhaust schedule listing rates, terminations and Code references.
Combustion air, venting, and clearances for fuel-fired appliances
Calculate the required combustion air for each fuel-fired appliance in a sample mechanical room using both the indoor-air and outdoor-air methods.
Determine and sketch the required clearance to combustibles for a furnace, water heater and vent connector, dimensioning each clearance on the drawing.
Diagram a venting arrangement for a mid-efficiency and a high-efficiency appliance, marking slope, termination height and any horizontal run limits.
Identify five common venting errors on a fabricated case and write the correcting Code rule for each.
Your checkpoint
An annotated mechanical-room drawing showing combustion air openings, all clearances dimensioned, and a venting diagram with the governing rule written beside each critical dimension.
Fire protection considerations for HVAC - fire separations, fire dampers, penetration and opening protection & Administration, definitions and scope of the Building Code Act / OBC
Locate every required fire separation and fire-resistance rating that an HVAC installation can penetrate in a house, and record the rating for each.
Specify fire dampers, opening protection and penetration sealing for three representative duct penetrations, naming the listed assembly used.
Summarize the Building Code Act framework - scope, powers, owner and contractor duties - in a one-page written outline.
Explain in writing how a permit, an inspection and an order to comply fit into the Act's enforcement chain.
Your checkpoint
A penetration schedule listing each duct or pipe penetration, its required rating, and the damper or seal specified, plus a one-page Act outline.
General provisions, referenced standards and permits/inspection requirements & Energy efficiency, insulation and building envelope coordination
List the referenced standards that a house HVAC design depends on and state, in one line each, what the standard controls.
Outline the permit application and inspection sequence for a residential HVAC alteration, identifying what must be shown on the submitted drawings.
Describe how insulation level, air barrier continuity and envelope tightness change the heating load and the ventilation requirement of the same house.
Quantify that effect by re-running the week 2 load calculation on a better-insulated, tighter version of the sample house and comparing results.
Your checkpoint
A permit-and-inspection checklist and a side-by-side load comparison table for the original versus upgraded envelope, with a written explanation of the differences.
Plans, specifications, documentation and site review of HVAC installations
Draft a complete HVAC submission package for the sample house - drawings, equipment schedule, load summary and specification notes.
Compile a site review checklist that a reviewer could carry to a rough-in inspection, covering venting, clearances, duct sealing and combustion air.
Re-attempt the practice items missed in weeks 1 to 6 and write a corrected rule for any item still wrong.
Rank your nine domains by practice score and schedule the specific review blocks you will run in week 8.
Your checkpoint
A full sample submission package with site review checklist, plus a ranked weak-domain list and a written week 8 review schedule.
Administration, definitions and scope of the Building Code Act / OBC & General provisions, referenced standards and permits/inspection requirements & Heating, ventilating and air-conditioning systems: Part 6 requirements applicable to houses & Part 9 residential HVAC design and installation - heating and cooling load, equipment and controls & Combustion air, venting, and clearances for fuel-fired appliances & Ductwork, air distribution, ventilation and exhaust systems for houses & Fire protection considerations for HVAC - fire separations, fire dampers, penetration and opening protection & Energy efficiency, insulation and building envelope coordination & Plans, specifications, documentation and site review of HVAC installations
Complete two full-length timed mock exams under exam conditions and score each against the domain weightings.
Re-study the three lowest-scoring domains from the mock results, writing a condensed rule card for each.
Recite the key numeric limits - clearances, ventilation rates, load margins, ratings - from memory and verify each against the Code.
Review every error log entry from weeks 1 to 7 and confirm each rule can now be stated without notes.
Your checkpoint
Two scored mock exams, three domain rule cards, and a signed-off error log showing every previously missed rule restated correctly.
Milestones
Week 2: Can complete a full house load calculation and equipment selection from a blank worksheet in under 90 minutes without notes, scoring at least 80% on 20 load-and-sizing practice items.
Week 4: Can dimension combustion air openings, all appliance clearances and a venting layout for an unfamiliar mechanical room, scoring at least 80% on 25 venting and clearance items.
Week 6: Can list the permit and inspection steps, the key referenced standards and the fire-resistance ratings for duct penetrations, scoring at least 75% on a mixed 30-item set drawn from domains 1, 2 and 7.
Week 8: Score at least 80% overall on both timed mock exams with no single domain below 70%, and restate every error-log rule correctly from memory.