OBC Plumbing House study materials
OBC Plumbing House study resources

OBC Plumbing House cheat sheet

OBC Plumbing House · Keep the key ideas within reach.

Quick reference

Plumbing Terminology, Definitions, and Symbols

  • Fixture unit (fU): a dimensionless measure of the probable load a fixture places on the drainage or water supply system; 1 fU equals roughly 1 cubic foot per minute (7.5 gpm) of flow.

  • Drainage fixture unit (DFU) rates fixture discharge into a building drain; supply fixture unit (WSFU) rates demand on the water distribution system, and the two scales are not interchangeable.

  • Slope is vertical fall per unit horizontal run: 1/4 inch per foot equals 2.08 percent; 1/8 inch per foot equals 1.04 percent; 1/2 inch per foot equals 4.17 percent.

  • A trap seal is the water depth in a trap, commonly 2 to 4 inches; a trap weir is the top edge of the trap dip that sets the seal depth.

  • Vent stack versus stack vent: a stack vent is the extension of a soil or waste stack above the highest fixture branch; a vent stack serves lower fixtures only.

  • A wet vent is a vent that also carries waste from fixtures on the same floor; a dry vent carries air only.

  • Plan symbols: solid line = drain below floor or concealed; dashed line = vent; circle with cross = floor drain; triangle = cleanout.

  • Developed length is the total measured run of pipe along its centerline including fittings; it governs trap arm length and vent distance limits.

Quick reference

General Regulations, Permits, and Inspections

  • A plumbing permit is required before installing, altering, or replacing any plumbing system or fixture, except minor repairs such as clearing stoppages or replacing washers.

  • Permits are issued to the owner or a licensed contractor; the permit must be posted on the job site and available for inspection.

  • Required inspection sequence: rough-in (before concealing), then final; some jurisdictions add a slab or underground inspection before the slab is poured.

  • Concealed work must be tested and approved before covering; a water test of the DWV system typically holds 10 feet of head (about 4.3 psi) for at least 15 minutes.

  • Final inspection verifies fixtures are set, traps primed, vents terminate properly, and all fixtures have potable water and function.

  • Work done without a permit is subject to stop-work orders, double fees, or removal and re-inspection at the owner's expense.

  • A certificate of occupancy may be withheld until plumbing final approval is granted by the authority having jurisdiction (AHJ).

  • Inspections must be requested within the time the AHJ specifies; work covered before inspection may be ordered exposed.

Quick reference

Drainage, Waste, and Vent Systems

  • Building drain carries waste to the building sewer; it extends 30 inches outside the building wall, where it becomes the building sewer.

  • Fixture branch diameter is set by the largest DFU load served; a water closet requires a minimum 3-inch branch.

  • Trap arm length limits: 1-1/4 inch trap = 5 feet, 1-1/2 inch = 6 feet, 2 inch = 8 feet, 3 inch = 12 feet, 4 inch = 16 feet, measured from trap weir to vent.

  • Every trap must be vented, and each trap arm may serve only one fixture (except where a common vent or wet vent is permitted).

  • Vent terminals must extend at least 6 inches above the roof and be at least 10 feet from or 2 feet above any window, door, or air intake.

  • Cleanouts are required at the base of each stack, at the building drain, at changes of direction over 45 degrees, and at intervals not exceeding 100 feet on horizontal runs.

  • Horizontal drainage pipe must slope at least 1/4 inch per foot for pipe 3 inches and smaller, and 1/8 inch per foot for 4 inches and larger.

  • A backwater valve is required on fixtures below the level of the next upstream manhole to prevent sewage backup.

Quick reference

Water Supply and Distribution Systems

  • Static pressure at fixtures should be between 40 and 80 psi; above 80 psi a pressure-reducing valve is required, and below 20 psi may indicate inadequate supply.

  • Thermal expansion of heated water in a closed system requires an expansion tank or thermal expansion relief device.

  • Water heater temperature and pressure relief (TPR) valve discharge must terminate 6 to 24 inches above the floor or outside, never capped.

  • Minimum pipe sizing uses the WSFU method or the fixture-count method; a 3/4-inch service line commonly serves a single-family dwelling.

  • Backflow prevention: an air gap is the highest protection; a reduced-pressure-zone (RPZ) assembly is required for high-hazard cross-connections.

  • Shock arrestors absorb water hammer from fast-closing valves and are installed near the fixture or valve.

  • Water service line depth must be below the local frost line to prevent freezing; typical minimum cover is 12 to 48 inches depending on climate.

  • Hot water distribution: recirculation or a manifold system reduces wait time; hot and cold lines should be insulated to limit heat loss.

Quick reference

Fixtures, Fixture Fittings, and Appliances

  • Water closets must use no more than 1.6 gallons per flush (gpf); high-efficiency models use 1.28 gpf or less.

  • Urinals are limited to 1.0 gpf, and high-efficiency urinals to 0.5 gpf or less.

  • Showerheads are limited to 2.5 gpm at 80 psi; lavatory faucets are limited to 2.2 gpm, and kitchen faucets to 2.2 gpm.

  • A fixture must be set level and securely fastened; floor-mounted water closets require a closet flange at finished floor level.

  • Each fixture must have a trap with a water seal of 2 to 4 inches, and no fixture may be double-trapped.

  • Fixture clearances: a water closet needs at least 15 inches from centerline to any side wall and 21 inches in front.

  • Drinking fountains must be provided where required by occupancy, and each must have an accessible height and knee clearance.

  • Garbage disposals must be connected to a drain with a trap; a dishwasher must have an air gap or high loop for backflow protection.

Quick reference

Storm Drainage and Special Waste Systems

  • Storm drainage is separate from sanitary drainage; combined systems are prohibited in most modern jurisdictions.

  • Roof drains are sized using the 100-year, one-hour rainfall intensity for the site, plus the roof area served.

  • Primary and secondary (overflow) roof drainage: secondary drains or scuppers must handle the design storm if the primary is blocked.

  • A trap is required on each roof drain or area drain to prevent sewer gas escape, and it must be protected from freezing.

  • Special wastes include grease, oil, sand, and chemical wastes; a grease interceptor is required for food service and must be sized to the fixture load.

  • Grease interceptors must be installed outside the building, with a minimum 2-inch inlet and outlet and access for cleaning.

  • Acid-neutralizing sumps are required for laboratory or plating wastes that discharge corrosive liquids.

  • Sump pumps discharge to an approved point; check valves prevent backflow and a dedicated circuit supplies power.

Quick reference

Plumbing Materials, Joints, and Connections

  • Copper tube types: K (thickest, underground), L (standard above ground), M (thin wall, above ground only).

  • PEX is joined with crimp or expansion fittings; it must be protected from UV light and from physical damage.

  • PVC DWV uses solvent cement; primer is required before cement on PVC, and joints must be fully inserted and twisted a quarter turn.

  • Cast iron soil pipe joins with no-hub couplings or hub-and-spigot lead joints; no-hub couplings require a torque wrench to the manufacturer's spec.

  • Galvanized steel pipe is joined with threaded fittings; dielectric unions are required where steel meets copper to prevent galvanic corrosion.

  • ABS pipe uses ABS solvent cement; PVC and ABS cement are not interchangeable.

  • Brass and bronze fittings are used for valves and trim; lead-free solder is required for potable water joints.

  • Support spacing: copper horizontal runs about every 6 feet, PVC about every 4 feet, and cast iron every 5 feet with hangers near joints.

Quick reference

Fire Protection and Specialty Plumbing Systems

  • A fire sprinkler system is a separate piping system with its own water supply and backflow prevention; it must not be connected to the domestic system without an approved backflow device.

  • Sprinkler head spacing: standard spray heads cover up to 130 square feet for light hazard, and heads must be at least 6 inches below the ceiling.

  • A standpipe system delivers water to fire hose connections in tall or large buildings; class I serves firefighters, class II serves occupants, class III serves both.

  • Fire department connections (FDC) must be accessible, marked, and located within the required distance of a hydrant.

  • A fire pump boosts pressure when the public supply is inadequate; it requires a dedicated suction line and a test header.

  • Specialty systems include medical gas (oxygen, vacuum), which requires brazed joints, dedicated piping, and certified installers.

  • A backflow preventer on the fire line must be inspected and tested annually per the AHJ.

  • Flow test data (static, residual, and pitot pressure) determine the available fire flow at a site.

Quick reference

Health, Safety, and Sanitation Requirements

  • Potable water must be protected from contamination by an air gap of at least twice the effective diameter of the supply pipe, and never less than 1 inch.

  • Cross-connections are prohibited; any connection between potable and non-potable water must have an approved backflow preventer.

  • Sewer gas contains methane and hydrogen sulfide; traps and vents keep gas out of occupied spaces.

  • Plumbing fixtures must be smooth, nonabsorbent, and easily cleanable; food service areas require indirect waste connections.

  • Indirect waste piping discharges through an air gap into a receptor; the gap must be at least 1 inch or twice the pipe diameter.

  • Water heaters must be seismically strapped where required and have a TPR valve piped to a safe discharge point.

  • Confined-space entry for sewer work requires gas testing and ventilation; hydrogen sulfide is heavier than air and collects in low areas.

  • Handwashing sinks must be provided in food preparation and toilet room areas; each must have hot and cold water, soap, and towels.

Quick reference

Related Building Code and Trade Coordination

  • Plumbing penetrations through fire-rated assemblies must be firestopped with an approved listed system equal to the rating of the assembly.

  • Structural members may not be notched or bored beyond code limits; a bored hole in a 2x10 joist must stay within the middle third of the depth and no larger than one-third the depth.

  • Pipe sleeves are required where piping passes through concrete or masonry, and the annular space must be sealed.

  • Electrical coordination: a dedicated GFCI circuit is required for receptacles near sinks and for pumps in wet locations.

  • HVAC coordination: condensate drains must connect to an approved receptor with an air gap, not directly to the sanitary drain.

  • Plumbing must maintain required clearances from electrical panels and gas meters and from storage water heaters' combustion air openings.

  • Access panels are required for concealed valves, cleanouts, and fixtures that need service.

  • The plumbing code and building code are adopted together; where they conflict, the more restrictive requirement governs.