OBC Plumbing House study materials
OBC Plumbing House study resources

OBC Plumbing House study plan

OBC Plumbing House · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Plumbing Terminology, Definitions, and Symbols & Drainage, Waste, and Vent Systems

  • Define at least 60 core plumbing terms (trap, stack, vent, fixture unit, developed length, grade, invert, crown, weir, air gap) in your own words and group them by system.

  • Decode common plumbing symbols and abbreviations used on isometric and plan drawings, including waste, vent, water, and gas line symbology.

  • Sketch a simple DWV isometric from a written description showing soil stack, branch wastes, traps, and vents.

  • Explain the difference between a soil stack, waste stack, vent stack, and stack vent without notes.

  • Convert fixture units to drainage fixture unit loads for a small bathroom group using a provided table you copy out yourself.

Your checkpoint

A personal glossary of 60+ terms plus one hand-drawn DWV isometric labeled with correct symbols and fixture-unit totals.

Week 2

Drainage, Waste, and Vent Systems

  • Trace the path of a vent system from fixture trap to termination and identify each vent type (individual, common, wet, circuit, island, relief).

  • Calculate trap arm length limits and slope requirements for common fixture sizes.

  • Identify the conditions that require a vent and the conditions that permit common venting.

  • Describe how a trap seal is protected and list the causes of trap seal loss.

  • Size a simple branch drain and vent using fixture-unit tables you build yourself from study notes.

Your checkpoint

A one-page venting cheat sheet plus two worked sizing problems with all arithmetic shown.

Week 3

Drainage, Waste, and Vent Systems & Water Supply and Distribution Systems

  • Lay out a complete DWV system for a two-bath house on paper, including stack, building drain, and vent termination above roof.

  • Explain building drain versus building sewer, and where the property line changes code jurisdiction.

  • Describe water supply components: service line, meter, main, riser, branch, and fixture stop.

  • Compute minimum pipe sizing for a supply branch given fixture values and developed length.

  • Explain the purpose of a water hammer arrestor, pressure-reducing valve, and backflow preventer.

Your checkpoint

A full-house DWV and water supply layout drawing with pipe sizes annotated and a short written justification for each size.

Week 4

Water Supply and Distribution Systems & Health, Safety, and Sanitation Requirements

  • Describe potable water protection requirements, including air gaps, vacuum breakers, and cross-connection control.

  • Explain water temperature limits and scald protection at fixtures.

  • Identify the sanitary requirements for fixture clearance, lighting, and ventilation in bathrooms.

  • List the health-related reasons behind trap seal requirements and prohibited connections.

  • Explain how backflow and cross-connection hazards are tested and corrected.

Your checkpoint

A cross-connection and sanitation checklist of at least 15 items with the reason each matters, plus a midterm self-test scoring 80% or better.

Week 5

Fixtures, Fixture Fittings, and Appliances & General Regulations, Permits, and Inspections

  • Classify fixtures by type and state the minimum fixture requirements for a single-family dwelling.

  • Explain fixture fitting requirements including faucets, flush valves, and trap standards.

  • Describe the permit process from application to final inspection and the role of each inspection stage.

  • List the inspections typically required (rough-in, underground, final) and what each verifies.

  • Explain who may perform plumbing work and when a permit is exempt.

Your checkpoint

A fixture schedule for a sample house plus a permit-and-inspection flow chart with each stage's pass criteria.

Week 6

Plumbing Materials, Joints, and Connections & Storm Drainage and Special Waste Systems

  • Match common pipe materials (copper, PEX, PVC, ABS, cast iron, galvanized steel) to their approved uses and restrictions.

  • Describe approved joining methods for each material and where solvent cement or solder is prohibited.

  • Explain storm drainage design basics: roof drains, leaders, sizing by rainfall, and secondary drainage.

  • Identify special waste systems such as grease interceptors, chemical waste, and acid-neutralizing systems.

  • Explain the difference between combined and separate storm and sanitary systems.

Your checkpoint

A material-to-application matrix with joining methods, plus a storm drainage sizing example with calculations.

Week 7

Fire Protection and Specialty Plumbing Systems & Related Building Code and Trade Coordination

  • Describe the basic components of a residential fire sprinkler system and how it ties to the domestic water supply.

  • Explain standpipe, riser, and sprinkler head spacing concepts at a general level.

  • Identify coordination points between plumbing and structural, electrical, and HVAC trades (sleeves, chases, clearances).

  • Explain penetration and firestopping requirements where pipes pass through rated assemblies.

  • Describe how plumbing rough-in must coordinate with framing and foundation stages.

Your checkpoint

A trade coordination checklist covering at least 12 conflict points plus a short written summary of fire protection basics.

Week 8

Plumbing Terminology, Definitions, and Symbols & General Regulations, Permits, and Inspections & Drainage, Waste, and Vent Systems & Water Supply and Distribution Systems & Fixtures, Fixture Fittings, and Appliances & Storm Drainage and Special Waste Systems & Plumbing Materials, Joints, and Connections & Fire Protection and Specialty Plumbing Systems & Health, Safety, and Sanitation Requirements & Related Building Code and Trade Coordination

  • Complete a 100-question timed practice exam across all domains and score each domain separately.

  • Re-study any domain scoring below 75% and rewrite your weak-area notes.

  • Recite the top 40 terms and the ten most common code requirements from memory.

  • Redo two full sizing and layout problems under time pressure.

  • Build a one-page final review sheet of numbers, limits, and definitions.

Your checkpoint

A scored 100-question practice exam with a domain-by-domain error log and a one-page final review sheet.

Milestones

Week 2: Can explain vent types and trap seal protection, and correctly size a branch drain and vent with no reference open.

Week 4: Scores 80% or better on a self-made 40-question midterm covering domains 1, 3, 4, and 9.

Week 6: Correctly matches all major pipe materials to approved uses and joining methods and completes a storm drainage sizing example.

Week 8: Scores 80% or higher overall and at least 75% in every domain on a timed 100-question practice exam.