OBC Plumbing House study plan
OBC Plumbing House · Give each week a clear focus.
8 weeks · About 7 hours per week
Plumbing Terminology, Definitions, and Symbols & Drainage, Waste, and Vent Systems
Define at least 60 core plumbing terms (trap, stack, vent, fixture unit, developed length, grade, invert, crown, weir, air gap) in your own words and group them by system.
Decode common plumbing symbols and abbreviations used on isometric and plan drawings, including waste, vent, water, and gas line symbology.
Sketch a simple DWV isometric from a written description showing soil stack, branch wastes, traps, and vents.
Explain the difference between a soil stack, waste stack, vent stack, and stack vent without notes.
Convert fixture units to drainage fixture unit loads for a small bathroom group using a provided table you copy out yourself.
Your checkpoint
A personal glossary of 60+ terms plus one hand-drawn DWV isometric labeled with correct symbols and fixture-unit totals.
Drainage, Waste, and Vent Systems
Trace the path of a vent system from fixture trap to termination and identify each vent type (individual, common, wet, circuit, island, relief).
Calculate trap arm length limits and slope requirements for common fixture sizes.
Identify the conditions that require a vent and the conditions that permit common venting.
Describe how a trap seal is protected and list the causes of trap seal loss.
Size a simple branch drain and vent using fixture-unit tables you build yourself from study notes.
Your checkpoint
A one-page venting cheat sheet plus two worked sizing problems with all arithmetic shown.
Drainage, Waste, and Vent Systems & Water Supply and Distribution Systems
Lay out a complete DWV system for a two-bath house on paper, including stack, building drain, and vent termination above roof.
Explain building drain versus building sewer, and where the property line changes code jurisdiction.
Describe water supply components: service line, meter, main, riser, branch, and fixture stop.
Compute minimum pipe sizing for a supply branch given fixture values and developed length.
Explain the purpose of a water hammer arrestor, pressure-reducing valve, and backflow preventer.
Your checkpoint
A full-house DWV and water supply layout drawing with pipe sizes annotated and a short written justification for each size.
Water Supply and Distribution Systems & Health, Safety, and Sanitation Requirements
Describe potable water protection requirements, including air gaps, vacuum breakers, and cross-connection control.
Explain water temperature limits and scald protection at fixtures.
Identify the sanitary requirements for fixture clearance, lighting, and ventilation in bathrooms.
List the health-related reasons behind trap seal requirements and prohibited connections.
Explain how backflow and cross-connection hazards are tested and corrected.
Your checkpoint
A cross-connection and sanitation checklist of at least 15 items with the reason each matters, plus a midterm self-test scoring 80% or better.
Fixtures, Fixture Fittings, and Appliances & General Regulations, Permits, and Inspections
Classify fixtures by type and state the minimum fixture requirements for a single-family dwelling.
Explain fixture fitting requirements including faucets, flush valves, and trap standards.
Describe the permit process from application to final inspection and the role of each inspection stage.
List the inspections typically required (rough-in, underground, final) and what each verifies.
Explain who may perform plumbing work and when a permit is exempt.
Your checkpoint
A fixture schedule for a sample house plus a permit-and-inspection flow chart with each stage's pass criteria.
Plumbing Materials, Joints, and Connections & Storm Drainage and Special Waste Systems
Match common pipe materials (copper, PEX, PVC, ABS, cast iron, galvanized steel) to their approved uses and restrictions.
Describe approved joining methods for each material and where solvent cement or solder is prohibited.
Explain storm drainage design basics: roof drains, leaders, sizing by rainfall, and secondary drainage.
Identify special waste systems such as grease interceptors, chemical waste, and acid-neutralizing systems.
Explain the difference between combined and separate storm and sanitary systems.
Your checkpoint
A material-to-application matrix with joining methods, plus a storm drainage sizing example with calculations.
Fire Protection and Specialty Plumbing Systems & Related Building Code and Trade Coordination
Describe the basic components of a residential fire sprinkler system and how it ties to the domestic water supply.
Explain standpipe, riser, and sprinkler head spacing concepts at a general level.
Identify coordination points between plumbing and structural, electrical, and HVAC trades (sleeves, chases, clearances).
Explain penetration and firestopping requirements where pipes pass through rated assemblies.
Describe how plumbing rough-in must coordinate with framing and foundation stages.
Your checkpoint
A trade coordination checklist covering at least 12 conflict points plus a short written summary of fire protection basics.
Plumbing Terminology, Definitions, and Symbols & General Regulations, Permits, and Inspections & Drainage, Waste, and Vent Systems & Water Supply and Distribution Systems & Fixtures, Fixture Fittings, and Appliances & Storm Drainage and Special Waste Systems & Plumbing Materials, Joints, and Connections & Fire Protection and Specialty Plumbing Systems & Health, Safety, and Sanitation Requirements & Related Building Code and Trade Coordination
Complete a 100-question timed practice exam across all domains and score each domain separately.
Re-study any domain scoring below 75% and rewrite your weak-area notes.
Recite the top 40 terms and the ten most common code requirements from memory.
Redo two full sizing and layout problems under time pressure.
Build a one-page final review sheet of numbers, limits, and definitions.
Your checkpoint
A scored 100-question practice exam with a domain-by-domain error log and a one-page final review sheet.
Milestones
Week 2: Can explain vent types and trap seal protection, and correctly size a branch drain and vent with no reference open.
Week 4: Scores 80% or better on a self-made 40-question midterm covering domains 1, 3, 4, and 9.
Week 6: Correctly matches all major pipe materials to approved uses and joining methods and completes a storm drainage sizing example.
Week 8: Scores 80% or higher overall and at least 75% in every domain on a timed 100-question practice exam.