A 200-ton centrifugal chiller using R-134a serves a comfort-cooling loop. The condenser is water-cooled, with cooling tower water entering at 85°F and leaving at 95°F design. Recently, the chiller has been tripping on high condenser pressure (cutout at 165 psig). The compressor motor current is at 95% of full load amperes (FLA) even though the building load is only 60% of design. The condenser approach temperature (saturated condensing temperature minus leaving water temperature) has increased from 2°F to 8°F. The cooling tower is operating with three of four cells, and the tower fan is at full speed. The cooling water flow rate is measured at 480 gpm, but the design is 600 gpm. The water treatment log shows that the condenser tubes were last brushed 14 months ago, and the chemical inhibitor residual is low. The chiller is needed for a critical server room, so shutdown must be minimized.

1. Determine the root cause of the high condenser pressure and explain how the measured data supports your conclusion.

Read the worked answer

The high condenser pressure is caused by reduced heat transfer in the condenser, primarily due to fouling and reduced water flow. The approach temperature has increased from 2°F to 8°F, which is a direct indicator of fouling: the condenser tubes have a layer of scale or biofilm that insulates the refrigerant from the water, so the refrigerant must condense at a higher temperature to transfer the same heat. The cooling water flow is 480 gpm instead of 600 gpm (20% low), which increases the water-side temperature rise and reduces the heat transfer coefficient. The low chemical inhibitor residual suggests that corrosion and scaling are likely. The compressor motor current at 95% FLA while the load is only 60% indicates that the compressor is working harder than expected; a centrifugal compressor's power increases with condensing pressure, so the high pressure is causing the high current. The chiller is tripping on the high-pressure cutout because the saturated condensing temperature corresponding to 165 psig for R-134a is about 115°F, which is well above the design condensing temperature of about 105°F (corresponding to 95°F leaving water plus 10°F approach? Actually design approach 2°F, so condensing temp = 97°F, pressure about 110 psig). The increased approach and low flow are the root causes. The fact that the tower is running three of four cells and the fan is at full speed suggests that the tower is trying to reject heat but the condenser is not transferring it efficiently. The low water flow could be due to a partially closed valve, a fouled strainer, or a failing pump. The fouling is the primary cause, with low flow as a secondary contributor.

2. Recommend immediate actions to keep the chiller online for the server room, and a plan to restore full capacity.

Read the worked answer

Immediate actions: (1) Increase cooling water flow to design by checking the condenser water pump, strainer, and valves; if a valve is throttled, open it fully. If the pump is worn, consider temporary operation of a backup pump. (2) Reduce the load on the chiller by lowering the chilled water setpoint? Actually, to reduce condenser pressure, reduce the entering condenser water temperature if possible: start the fourth cooling tower cell and ensure the tower fans are at maximum; if the tower is undersized, consider temporary supplemental cooling (e.g., a portable chiller or water spray on the condenser). (3) Clean the condenser tubes online if possible using a brush or chemical cleaning; however, online cleaning may not be feasible without shutdown. As a temporary measure, reduce the compressor load by staging on a second chiller if available, or by limiting the chiller to 80% capacity via the control system. (4) Monitor the high-pressure cutout and be prepared to reset. Plan to restore full capacity: schedule a shutdown within 48 hours to mechanically clean the condenser tubes (brush and chemical cleaning), inspect and repair the cooling water pump, and restore water treatment chemical residuals. After cleaning, verify the approach temperature returns to 2–3°F. Also, investigate why the inhibitor residual is low and adjust the chemical feed. If the tubes are severely fouled, consider replacing them. The server room load should be maintained by a temporary redundant cooling unit during the shutdown. The engineer should also review the cooling tower operation: three of four cells may indicate that the tower is not sized for the current wet-bulb temperature, so consider adding tower capacity or improving airflow.