Lockout/tagout verification
After isolating and locking the energy source, the worker must test for absence of voltage with a meter rated for the system voltage before touching conductors.
Arc flash boundary
The distance from live parts at which incident energy equals 1.2 cal/cm2. Inside this boundary, arc-rated PPE is required for the calculated incident energy level.
Limited approach boundary
A distance from exposed live parts that unqualified persons may not cross unless escorted by a qualified person. Set by system voltage in CSA Z462.
Three-phase power formula
P equals the square root of three times line voltage times line current times power factor. Used to compute load in watts for balanced three-phase circuits.
Voltage drop calculation
Single-phase: VD equals 2 times K times current times length divided by circular mils. Three-phase substitutes 1.732 for the factor 2. K is 12.9 for copper.
Impedance triangle
Impedance Z equals the square root of resistance squared plus reactance squared. Inductive reactance XL equals 2 pi f L; capacitive reactance is inversely proportional to frequency.
Power factor correction kVAR
kVAR required equals kW times the difference between the tangents of the original and target power factor angles. Capacitors supply reactive power locally.
Continuous load 80 percent rule
CEC Rule 8-104 limits continuous load to 80 percent of the overcurrent device rating unless the assembly is listed for 100 percent loading.
Conduit fill 40 percent
CEC Rule 12-1000 permits conductors to occupy no more than 40 percent of a raceway's interior cross-sectional area when three or more conductors are installed.
Megohmmeter insulation test
Applies 500 or 1000 V DC to measure insulation resistance. CEC Rule 44-600 requires a minimum of 1 megohm for circuits rated 600 V or less.
Clamp ammeter limitation
A clamp meter reads the net current through its jaws. Placing it around both conductors of a circuit cancels the magnetic fields and reads zero.
Box fill calculation
Per CEC Table 22, each conductor, clamp, device, and ground contributes volume. The sum must not exceed the box's marked cubic-centimetre capacity.
Raceway bend limit
CEC Rule 12-510 limits a run to 360 degrees of bends between pull points. Additional bends require a junction box or conduit body.
EMT support spacing
Electrical metallic tubing must be supported within 1 m of each box and at intervals not exceeding 3 m along the run per CEC Rule 12-1014.
Service disconnect location
The service disconnecting means must be readily accessible, installed at or nearest the point of entry, and marked to identify it as the service disconnect.
Main bonding jumper
Connects the neutral bus to the service enclosure. It is installed only at the service or separately derived source, never in downstream panels.
Grounding electrode conductor sizing
Sized from CEC Table 16 based on the largest ungrounded service conductor. Minimum 6 AWG copper for typical residential services.
Motor branch circuit sizing
CEC Rule 28-104 requires branch circuit conductors rated at 125 percent of motor full-load current from Tables 44 and 45.
Motor overload protection
Running overloads are set per CEC Table 29, typically 115 to 125 percent of nameplate full-load current, protecting the motor from sustained overcurrent.
Motor disconnecting means
Required within sight and not more than 9 m from the motor. Motors over 750 W need a lockable disconnect per CEC Rule 28-600.
Reversing three-phase motor
Interchange any two of the three supply conductors at the motor or starter to reverse rotation. This changes phase sequence.
Transformer kVA formula
Three-phase kVA equals 1.732 times voltage times current divided by 1000. Single-phase kVA equals voltage times current divided by 1000.
Transformer overcurrent protection
CEC Rule 26-250 permits primary-only protection under specified conditions; otherwise primary and secondary protection are both required based on transformer rating.
Generator sizing for motors
Generator capacity must accommodate motor starting kVA and limit voltage dip, typically to 15 percent, while carrying the steady connected load.
Triplen harmonic neutral current
Third-order harmonic currents from nonlinear loads add arithmetically in the neutral. K-rated transformers and oversized neutrals mitigate overheating.
Lumen method calculation
Number of luminaires equals illuminance times area divided by lumens per luminaire times coefficient of utilization times maintenance factor.
Dwelling lighting load
CEC Rule 8-400 requires a minimum lighting load of 3 W per square metre for the first 45 square metres of a single dwelling.
Class 2 circuit limit
Class 2 circuits are limited to 100 VA and use Chapter 3 wiring methods with separation from Class 1 and power circuits per CEC Section 16.
Emergency lighting duration
Emergency lighting must provide at least 30 minutes of illumination at an average of 10 lux along the path of egress.
Take-off waste factors
Estimates add waste to measured quantities: typically 5 to 10 percent for cable and about 3 percent for conduit, depending on routing complexity.
Bid price components
Material cost plus labour hours times labour rate plus overhead plus profit. Labour units come from estimating databases by installation type.
Change order purpose
Documents scope changes after contract award, priced before execution, and signed by both parties to protect the contractor's compensation.
As-built drawings
Marked-up drawings reflecting all field changes and deviations from design. Delivered to the owner and retained by the authority having jurisdiction.