Red Seal Industrial Electrician study materials
Red Seal Industrial Electrician study resources

Red Seal Industrial Electrician: Transformers and Power Distribution Systems

Red Seal Industrial Electrician · Work through your exam, one topic at a time.

All guide sections

Transformers and Power Distribution Systems

Ratings and connections

Transformer capacity is expressed in kVA, not kW, because the limit is heating from volts and amps, not real power. Single-phase kVA = V × I / 1000; three-phase kVA = √3 × V_line × I_line / 1000. The turns ratio sets the voltage ratio, but in a delta-wye unit the ratio of line voltages is not simply the per-winding turns ratio - the √3 factor must be included. Wye secondaries provide a neutral for single-phase line-to-neutral loads and a low-impedance ground point; delta secondaries have no neutral unless corner-grounded or zig-zag grounded.

Impedance, fault current and protection

Percent impedance (%Z) is the voltage drop at full-load current expressed as a percentage of rated voltage, and it sets the available short-circuit current: I_sc ≈ full-load amps ÷ (%Z/100). Low %Z means high fault current and a need for higher interrupting ratings; high %Z means better fault limitation but more voltage sag on motor starting. Inrush current on energization can be 8–12 times full-load current for a few cycles, so primary protection must ride through it. Transformers require primary protection, secondary protection (or a single primary device in defined cases), and grounding/bonding of the secondary neutral per the Code.

Traps

Using kW instead of kVA; ignoring the √3 in three-phase fault calculations; forgetting that paralleled transformers must match voltage ratio, polarity, %Z, and tap settings; and confusing temperature rise/insulation class with allowable loading.

Worked example

A 500 kVA, 600 V three-phase transformer with 5% impedance. Full-load current = 500 000 / (1.732 × 600) = 481 A. Available short-circuit current ≈ 481 / 0.05 = 9 620 A, or about 9.6 kA. The secondary overcurrent device must have an interrupting rating above 9.6 kA, and equipment downstream must be rated for that fault level.