Red Seal Lather (ISM) · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Installation of gypsum board, sheathing, and related substrates & Material estimation, handling, and site preparation

  • Classify the main gypsum board product types (regular, moisture-resistant, fire-rated, abuse-resistant, exterior sheathing) and state one job condition that dictates each choice

  • Sequence a board installation from delivery through fastening, describing stacking, acclimation, and protection from moisture at each step

  • Calculate board, joint compound, tape, and fastener quantities for two sample room takeoffs, including 10 percent waste allowance

  • List the PPE and site housekeeping requirements that apply when cutting, lifting, and fastening board, and match each to the hazard it controls

Your checkpoint

A two-page takeoff sheet for two practice rooms showing board count, compound and tape quantities, fastener count, and a one-line justification for each product selected

Week 2

Installation of gypsum board, sheathing, and related substrates & Layout and installation of framing, furring, and suspended ceiling systems

  • Demonstrate correct fastener spacing, edge distance, and joint offset patterns for single-layer and double-layer board applications

  • Describe framing tolerance limits for stud spacing, alignment, and backing that must be verified before boarding

  • Explain how control joints, expansion joints, and penetration details are laid out and executed in large ceiling and wall areas

  • Identify the causes and prevention of joint cracking, fastener popping, and board sag in ceilings

Your checkpoint

A labelled sketch set of three details (control joint, double-layer board joint offset, ceiling penetration) with written installation notes for each

Week 3

Installation of exterior and interior wall and ceiling finishes & Layout and installation of framing, furring, and suspended ceiling systems

  • Distinguish the levels of gypsum board finish and state the level required for tile, flat paint, and high-gloss applications

  • Outline the taping and finishing sequence from first coat through sanding, naming the tool and compound type used at each stage

  • Describe the layout and installation of a suspended ceiling grid, including hanger spacing, leveling, and border panel sizing

  • Explain the installation of furring, resilient channel, and direct-applied systems for walls and ceilings

Your checkpoint

A finish-level matrix covering five common job conditions with the required level, coats, and inspection points noted for each

Week 4

Installation of exterior and interior wall and ceiling finishes & Installation of insulation, vapour barriers, and air barriers

  • Explain how vapour barrier and air barrier placement differs by climate and assembly type, and identify the consequences of reversing the order

  • Describe the installation of batt, board, and spray-applied insulation in wall and ceiling cavities, including where each is inappropriate

  • Detail the sealing of penetrations, laps, and transitions that make an air barrier continuous at floor, wall, and roof junctions

  • State the code-referenced fire and sound ratings that depend on insulation and barrier continuity in common assemblies

Your checkpoint

A wall-section diagram for one cold-climate and one warm-climate assembly, each annotated with barrier position, insulation type, and every sealed transition

Week 5

Installation of lath, plaster, and stucco systems & Installation of exterior and interior wall and ceiling finishes

  • Describe three-coat and two-coat plaster application sequences, naming the mix, thickness, and curing requirements for each coat

  • Explain the installation of metal lath, gypsum lath, and rib lath, including fastener pattern and lap requirements

  • Outline stucco application over sheathed and masonry substrates, including control joints, weep screeds, and curing

  • Identify the causes of plaster and stucco defects such as crazing, bond failure, and efflorescence, and state the corrective action for each

Your checkpoint

A one-page comparison table of three-coat plaster, two-coat plaster, and stucco covering coats, thicknesses, cure time, and one common failure per system

Week 6

Interpreting drawings, specifications, and building codes & Occupational health and safety, and work practices

  • Read a set of wall and ceiling drawings to extract stud spacing, board type, finish level, and fire rating for a given room

  • Locate and apply the code clauses governing fire separations, exit enclosure protection, and penetration firestopping in wall and ceiling assemblies

  • Interpret specification sections to resolve a conflict between a drawing note and a written specification

  • Build a job hazard analysis for a boarding and finishing task, listing controls in the hierarchy of control order

Your checkpoint

A completed drawing-and-spec review of one practice drawing set, listing every board type, finish level, and fire rating found, with a written resolution for two conflicts

Week 7

Use and maintenance of tools and equipment & Occupational health and safety, and work practices

  • Match each tool to its task, including board lifts, screw guns, cutout tools, taping knives, and mixing equipment, and state the routine maintenance for each

  • Diagnose three common tool faults and describe the safe correction procedure for each

  • State the guard, inspection, and lockout requirements that apply to powered cutting and mixing equipment

  • Describe safe use and inspection of access equipment used in ceiling work, including ladders and rolling scaffolds

Your checkpoint

A tool inventory and maintenance log covering ten tools, with inspection interval, common fault, and safe correction listed for each

Week 8

Occupational health and safety, and work practices & Interpreting drawings, specifications, and building codes & Layout and installation of framing, furring, and suspended ceiling systems & Installation of exterior and interior wall and ceiling finishes & Installation of gypsum board, sheathing, and related substrates & Installation of insulation, vapour barriers, and air barriers & Installation of lath, plaster, and stucco systems & Use and maintenance of tools and equipment & Material estimation, handling, and site preparation

  • Complete a timed mixed-domain practice set and record the score by domain to identify remaining weak areas

  • Re-derive the key numbers from memory: fastener spacing, coat thicknesses, finish levels, and barrier placement by climate

  • Review every missed or guessed question and write the correct reasoning in your own words

  • Confirm exam-day logistics and rehearse a time-allocation approach for long scenario questions

Your checkpoint

A scored practice exam with a written error log listing each missed item, its domain, the correct reasoning, and the source section to revisit

Milestones

Week 2: Can sketch and label board joint offsets, fastener spacing, and a control joint from memory without notes

Week 4: Can explain, unaided, why vapour barrier position changes with climate and name the failure caused by getting it wrong

Week 6: Can pull board type, finish level, and fire rating from a drawing set and cite the code clause that governs the fire separation