Red Seal Mobile Crane Operator: Rigging, Load Calculation, and Lift Planning

Red Seal Mobile Crane Operator · Work through your exam, one topic at a time.

All guide sections

Rigging, Load Calculation, and Lift Planning

What this domain tests

This domain tests whether you can determine load weight, select and inspect rigging, calculate sling tension, and build a lift plan that controls the load. The exam expects working knowledge of sling configurations, working load limits (WLL), centre of gravity, sharp-edge protection, and critical-lift triggers.

Core rules and concepts

  • Identify the load: weight, dimensions, centre of gravity, lifting points, and any attached components.
  • Sling configurations change capacity: vertical, choker, basket, and bridle. A choker reduces capacity; a basket can increase it if the D/d ratio and angle are suitable.
  • Sling angle matters. Tension rises as the angle from vertical increases. For a two-leg bridle, leg tension = load ÷ (2 × cos(half the included angle)).
  • Never exceed the sling's WLL after accounting for configuration, angle, edge protection, and dynamic effects.
  • Use shackles and hooks rated for the load; hooks need a functioning latch. Avoid side-loading hooks unless rated.
  • A lift plan should identify the crane position, radius, boom length, rigging, signal person, path, exclusion zone, and contingency.
  • Critical lifts often include two-crane lifts, loads near capacity, unusual rigging, or lifts over occupied areas; they need a documented plan and supervisor involvement.

Worked example

A 2,000 kg load is lifted with a two-leg bridle. The included angle between the legs is 60°, so each leg is 30° from vertical. Tension per leg = 2,000 ÷ (2 × cos 30°) = 2,000 ÷ 1.732 = 1,155 kg. If each sling has a vertical WLL of 1,500 kg and the configuration is acceptable, the tension is within capacity. If the included angle were 90°, tension would rise to 1,414 kg per leg, leaving little margin.

Traps that cost marks

  • Halving the load for a two-leg sling without checking the angle.
  • Using the horizontal angle instead of the included angle between legs.
  • Ignoring sling weight, shackles, spreader beams, and attached hardware.
  • Forgetting that choker use and sharp edges reduce capacity.
  • Planning the crane but not the load path or centre of gravity.