Red Seal Mobile Crane Operator study plan
Red Seal Mobile Crane Operator · Give each week a clear focus.
8 weeks · About 7 hours per week
Rigging, load calculation, and lift planning
Calculate sling tension for vertical, bridle, and choker hitches using the load-angle multiplier, working ten practice problems to 90% accuracy
Determine load weight from material density and volume for steel, concrete, and timber shapes without consulting a reference table
Identify the centre of gravity of asymmetric loads and select rigging points that keep the hook over the CoG
Explain how sling angle below 60 degrees from horizontal increases leg tension and state the multiplier at 30, 45, and 60 degrees
Draft a lift plan for a simple two-point pick listing load weight, rigging weight, capacity required, and radius
Your checkpoint
A completed written lift plan for an asymmetric load with sling tensions calculated and checked against a rigging capacity table
Rigging, load calculation, and lift planning & Documentation, load charts, and record keeping
Read a manufacturer load chart to find capacity at a given radius, boom length, and quadrant, applying deductions for jib, stinger, and attachments
Convert between gross and net capacity and account for hook block, sling, and rigging weight in the net load calculation
Locate and interpret the notes, warnings, and asterisks on a load chart that change rated capacity
Complete a daily lift plan form and a critical lift checklist to a standard acceptable for a supervisor's review
Explain the record-keeping obligations for lift plans, inspections, and modifications under the applicable jurisdiction
Your checkpoint
Three load-chart worksheets showing radius, boom length, gross capacity, deductions, and net capacity, plus one fully completed lift plan form
Crane operation and load handling
Describe the crane's load moment indicator and rated capacity limiter functions and state the operator's response when a limit is approached
Sequence a lift from pre-lift check through load attachment, hoist, swing, placement, and release, naming the signal at each step
Explain the effect of boom deflection, side loading, and wind on load radius and capacity during a pick-and-carry
Identify the causes of two-blocking and the controls that prevent it
State the operating rules for travel with a suspended load and when a lift becomes a critical lift requiring extra planning
Your checkpoint
A written step-by-step procedure for a pick-and-carry task with the control action and safety check at each step
Crane setup, site preparation, and ground conditions
Assess ground bearing pressure for outrigger floats using load, float area, and soil type, and select mat size accordingly
Identify hazards in a site survey: overhead power lines, buried utilities, slope, excavations, and adjacent structures
State minimum clearance distances from energized lines and the procedure when clearance cannot be maintained
Set up a crane level with outriggers fully extended and explain why partial extension changes capacity
Describe barricade and exclusion zone requirements around the swing radius
Your checkpoint
A site survey checklist and ground bearing pressure calculation for one scenario, with mat selection justified in writing
Crane inspection, maintenance, and pre-operational checks & Occupational health and safety, legislation, and regulatory compliance
Perform a pre-operational walkaround inspection of structure, wire rope, hooks, latches, brakes, and safety devices and record defects
Identify wire rope rejection criteria including broken wires, kinks, corrosion, and diameter reduction
Explain the employer and operator duties under occupational health and safety legislation, including the right to refuse unsafe work
State the inspection intervals for daily, monthly, and annual inspections and who may perform each
Describe lockout and energy isolation before maintenance or repair on the crane
Your checkpoint
A completed pre-operational inspection form with at least five simulated defects identified and classified as remove-from-service or monitor
Crane assembly, disassembly, and transport
Sequence the assembly of a lattice-boom crane including boom sections, pins, pendants, and boom hoist rigging
Calculate counterweight and component weights against transport limits and plan a load sequence for a multi-load move
State the checks required after assembly before the first lift, including verification of the load moment system and limit switches
Describe the disassembly procedure and the hazards of removing pins under load or trapping points during boom lowering
Explain permit and escort requirements for moving an oversize load on public roads
Your checkpoint
An assembly and disassembly sequence sheet listing steps, required personnel, and the verification check after each stage
Communication, signalling, and hand signals & Crane operation and load handling
Demonstrate and correctly name the standard hand signals for hoist, lower, swing, stop, emergency stop, and dog everything
Explain the roles of signalperson, rigger, and operator and the rule that only one person signals at a time
Set up and test radio communication, including agreed channel, call signs, and lost-communication procedure
Describe the operator's response to an unclear or improper signal and to loss of signal during a lift
Explain voice and hand signal protocols for a blind lift where the operator cannot see the load
Your checkpoint
A hand-signal reference sheet with the candidate's own descriptions of at least twelve signals, plus a written lost-communication procedure
Occupational health and safety, legislation, and regulatory compliance & Documentation, load charts, and record keeping & Rigging, load calculation, and lift planning
Complete a timed mock exam across all eight domains and score each domain to identify weak areas
Review every missed question and write a corrected explanation in the candidate's own words
Re-verify load chart and rigging calculations from weeks 1 and 2 without notes
Confirm familiarity with the documentation the operator must carry and maintain on site
Build a final one-page summary of formulas, clearances, and rejection criteria for last-minute review
Your checkpoint
A scored mock exam with a per-domain breakdown and a one-page formula and criteria summary sheet
Milestones
Week 2: Can calculate net capacity from a load chart, including all deductions, in under ten minutes with correct units
Week 4: Can complete a site survey and ground bearing pressure calculation and justify mat selection without reference material
Week 6: Can write the assembly sequence for a lattice boom from memory and name the post-assembly verification checks
Week 8: Scores at least 80% overall on the mock exam with no single domain below 70%