First 50 of 200 questions. Each one lists the choices, the correct answer, and an explanation. The checker at the top of this page saves progress in this browser when it is available.
Continue in the practice tool above to load more questions, 50 at a time.
Question 1Occupational skills and work practices
Before spreading thin-set mortar over a concrete substrate, a tilesetter checks the slab. Which condition most directly requires mechanical surface preparation before tiling?
- The slab has been cured for 28 days and is fully dry
- The slab has a dense, smooth, hard-troweled finish with curing compound residue Correct answer.
- The slab surface temperature is 20 °C in the shade
- The slab has a light broom finish that feels slightly abrasive
Explanation
Thin-set mortar relies on mechanical keying into a sound, open, absorbent surface. A hard-troweled slab carrying curing compound is too smooth and contaminated for reliable bond, so scarifying or shot-blasting is needed. A broom finish, adequate curing and moderate temperature are all favourable, not problematic.
Question 2Occupational skills and work practices
Under the standard work practice for ceramic tiling, what is the purpose of the notched trowel in thin-set installation?
- To score the substrate so the mortar grips more tightly
- To level the substrate before any mortar is applied
- To press the tile into the mortar after placement
- To meter out a consistent bed of mortar that can be collapsed to full contact Correct answer.
Explanation
The notches leave ridges of mortar of a controlled depth and spacing; when the tile is beaten in, these ridges collapse and spread to give near-full coverage. Combing the mortar this way is about controlling bed thickness and coverage, not about abrading or levelling the substrate.
Question 3Occupational skills and work practices
A tilesetter is installing large-format porcelain tiles on an interior floor. Which practice best controls lippage between adjacent tiles?
- Setting tiles tight against each other with no joint
- Using a levelling clip and wedge system combined with a consistent mortar bed Correct answer.
- Increasing the mortar bed thickness on one side of each tile
- Buttering only the back of each tile and leaving the floor bed dry
Explanation
Lippage on large-format tile is controlled by an even mortar bed plus a clip-and-wedge system that holds adjacent tile edges at the same plane while the mortar cures. Thickening one side or omitting the floor bed creates uneven support and worsens lippage. Tiles still need a joint for grout and movement.
Question 4Occupational skills and work practices
When mixing thin-set mortar from powder, which procedure follows accepted practice?
- Add all powder first, then pour water on top and stir briefly
- Mix only enough for the entire day so the batch stays consistent
- Mix with extra water to extend working time
- Add water to the bucket first, then add powder and mix to a lump-free consistency, then slake Correct answer.
Explanation
Manufacturers specify adding liquid first and then powder while mixing, followed by a slake period and a short remix to reach the correct consistency. Over-watering weakens the mortar, and mixed thin-set has a limited pot life, so it cannot be held all day.
Question 5Occupational skills and work practices
A tilesetter is setting tile over a plywood subfloor in a residential bathroom. Which requirement is essential for a durable installation?
- The tile must be bonded directly to the plywood with no membrane
- The subfloor must be sanded smooth and left slightly damp
- The wood substrate must meet the required stiffness and thickness, with a suitable crack-isolation or membrane system Correct answer.
- The plywood must be sealed with oil-based paint before tiling
Explanation
Wood substrates deflect under load, so they must meet deflection and thickness criteria, and a suitable underlayment or membrane is used to isolate the tile from movement. Sealing the plywood or bonding tile directly to it does not address deflection or moisture movement. A damp wood surface is not acceptable for bonding.
Question 6Occupational skills and work practices
What is the primary function of an uncoupling membrane installed under a tile floor?
- To waterproof the entire floor assembly by itself
- To provide thermal insulation for the floor
- To decouple the tile from substrate movement and reduce transfer of stresses Correct answer.
- To level out large dips in the concrete slab
Explanation
An uncoupling membrane separates the rigid tile layer from the substrate so differential movement is not transferred into the tile. It is not a levelling compound, and while some membranes are part of a waterproofing system, decoupling is the primary structural purpose.
Question 7Occupational skills and work practices
A tilesetter must cut a curved profile in a ceramic wall tile around a pipe. Which tool is most appropriate for producing the curve?
- A wood plane
- A drywall saw
- A wet saw with the tile fed and rotated into the blade, or a tile file for finishing Correct answer.
- A hammer and chisel
Explanation
Curved cuts are made by feeding the tile into a wet saw blade while rotating it, or by rough-cutting and finishing with a tile file or rubbing stone. A drywall saw, hammer and chisel, or plane would shatter or chip ceramic and cannot produce a controlled curve.
Question 8Occupational skills and work practices
Why is a wet saw preferred over a dry scoring cutter for porcelain tile?
- Dry scoring cutters cannot mark porcelain at all
- Water changes the colour of the tile edge
- Porcelain is dense and hard, so the diamond blade with water cooling gives cleaner, more accurate cuts Correct answer.
- Wet saws are lighter and easier to carry on site
Explanation
Porcelain has high density and hardness, making it difficult to snap cleanly with a scoring cutter; a water-cooled diamond blade cuts more accurately and reduces chipping. Dry cutters can score porcelain but often leave ragged edges. Weight and colour are irrelevant to the choice.
Question 9Occupational skills and work practices
When laying out a floor tile installation in a rectangular room, which approach generally gives the best appearance?
- Start with a full tile in one corner and let all cuts fall at the far walls
- Centre the layout so cut tiles at opposite walls are equal and not less than half a tile where possible Correct answer.
- Start with a full tile at the doorway and cut only at the back wall
- Begin from the room's centre with a half tile at every wall
Explanation
Centring the layout balances the cut tiles at opposite edges, which looks intentional and avoids narrow slivers. Starting from a corner pushes all cuts to the far walls and often leaves thin, unattractive pieces. Full tiles at the doorway alone does not balance the room.
Question 10Occupational skills and work practices
A tilesetter is grouting a floor of unglazed quarry tile. Which grout type is normally specified?
- Silicone sealant
- Portland cement-based grout, commonly sanded Correct answer.
- Epoxy grout only
- Dry-set mortar
Explanation
Cement-based grout, typically sanded for wider joints, is the standard choice for unglazed quarry tile and other porous or textured surfaces. Silicone is used at movement joints and changes of plane, not as a field grout, and dry-set mortar is an adhesive, not a grout.
Question 11Occupational skills and work practices
Why should grout not be mixed with more water than the manufacturer specifies?
- It makes the grout set too quickly
- It prevents the grout from curing at all
- It changes the colour of the tile
- Excess water lowers strength and increases shrinkage and efflorescence Correct answer.
Explanation
Extra water dilutes the cementitious binder, reducing compressive strength and increasing shrinkage and the likelihood of efflorescence. It does not stop curing entirely or alter the tile colour. The effect is on the grout's properties, not the tile.
Question 12Occupational skills and work practices
Where should a movement joint be placed in a large tiled floor?
- Only at doorways
- Nowhere, because grout allows for all movement
- At the perimeter and at regular intervals through the field, following the standard for the tile and substrate Correct answer.
- Only at the room's centre
Explanation
Movement joints are required at the perimeter and at regular intervals through the field to accommodate expansion and contraction of the tile and substrate. Grout alone cannot absorb this movement. Concentrating joints at the centre or at doorways only leaves large areas unrestrained.
Question 13Occupational skills and work practices
A tilesetter is installing tile on a shower wall. Which practice is essential for a durable, watertight installation?
- Relying on the surface grout alone to keep water out
- Installing a continuous waterproof membrane behind the tile, lapped correctly at corners and penetrations Correct answer.
- Skipping the membrane at the bottom of the wall
- Using drywall as the substrate behind the tile
Explanation
Waterproofing in a shower depends on a continuous membrane behind the tile, detailed and lapped at corners, seams and penetrations. Grout is not waterproof, and drywall is unsuitable as a wet-area substrate. Leaving the bottom of the wall unprotected allows water to migrate.
Question 14Occupational skills and work practices
What is the correct way to handle a tile that must be fitted around an outside corner?
- Grind the edge square and leave it unfinished
- Use a trim piece or mitre the edges so the finished corner is neat and protected Correct answer.
- Cut the tile short and fill the gap with grout
- Overlap the two tiles and leave the raw edge exposed
Explanation
Outside corners are finished with a trim profile or a mitred joint so the edge is protected and visually clean. Leaving raw edges exposed is unsafe and unattractive, and filling a gap with grout does not produce a proper corner.
Question 15Occupational skills and work practices
When installing tile over a concrete slab that contains a control joint, what is the standard approach?
- Tile straight across the joint with no special treatment
- Fill the joint with mortar before tiling
- Honour the joint by carrying a movement joint through the tile directly above it Correct answer.
- Cover the joint with a strip of plywood
Explanation
Control joints in the slab must be carried through the tile layer as movement joints directly above, so slab movement does not crack the tile. Tiling across it or filling it with mortar restrains the joint and invites cracking. Plywood is not a joint treatment.
Question 16Occupational skills and work practices
Which safety measure is most important when using a wet saw on site?
- Running the saw without water to save time
- Using a residual current device (GFCI) protected supply and keeping water and cords away from the cutting path Correct answer.
- Removing the blade guard to see the cut line
- Wearing cotton gloves while feeding the tile
Explanation
A wet saw combines water and electricity, so a residual current device or GFCI-protected supply is essential, along with keeping cords clear of water and the cutting path. Removing the guard or running dry defeats safety features. Cotton gloves offer no meaningful protection and can catch in the blade.
Question 17Occupational skills and work practices
A tilesetter is cutting tile with an angle grinder. Which personal protective equipment is essential?
- A hard hat only
- Safety glasses or goggles, hearing protection and a dust mask or respirator Correct answer.
- Steel-toed boots only
- A high-visibility vest only
Explanation
An angle grinder produces flying chips, high noise and silica dust, so eye protection, hearing protection and respiratory protection are all essential. A hard hat, boots or a vest alone do not address these hazards.
Question 18Occupational skills and work practices
What is the accepted method for estimating tile quantity for a room before ordering?
- Estimate by counting only the full tiles visible
- Order exactly the measured area with no allowance
- Order double the measured area to be safe
- Calculate the area, then add an allowance for cuts, breakage and wastage Correct answer.
Explanation
Tile is ordered from the measured area plus a wastage allowance for cuts, breakage and future repairs. Ordering exactly the area leaves no margin for cuts and errors, and doubling the area wastes money. Counting visible full tiles ignores cuts and partial pieces.
Question 19Occupational skills and work practices
A tilesetter is using a latex-portland cement mortar over a sound concrete floor. What does the latex additive primarily improve?
- Bond strength and flexibility compared with mixing with water alone Correct answer.
- Setting time so the mortar never cures
- The colour of the finished grout
- The thermal insulation of the floor
Explanation
Latex additives improve bond strength and flexibility and reduce water demand in cement mortars. They do not prevent curing, change grout colour or add thermal insulation. The benefit is in adhesion and performance.
Question 20Occupational skills and work practices
When installing tile on a wall over cement backer board, which fastener and joint treatment is correct?
- Nails driven proud of the surface
- Joints left open with no tape
- Adhesive applied only at the board edges
- Backer board screws set flush, with joints taped and bedded in thin-set Correct answer.
Explanation
Cement backer board is fixed with screws set flush and joints are taped and bedded in thin-set to create a continuous surface. Fasteners left proud interfere with the tile, and untaped joints allow movement and telegraphing through the tile.
Question 21Occupational skills and work practices
Which factor most affects the open time of thin-set mortar on a hot, windy day?
- The brand of the notched trowel
- The size of the grout float
- Rapid loss of moisture from the mortar, shortening the time available to place tile Correct answer.
- The colour of the tile being installed
Explanation
Hot, windy and sunny conditions draw moisture from thin-set quickly, so the open time shortens and tile must be placed sooner. Tile colour, trowel brand and float size do not govern open time. The controlling factor is moisture loss from the mortar.
Question 22Occupational skills and work practices
A tilesetter notices hollow-sounding spots when tapping newly set floor tile. What is the most likely cause?
- A grout joint that is too wide
- Tile that is too thick
- Insufficient mortar coverage or voids beneath the tile Correct answer.
- Grout that has not yet cured
Explanation
Hollow sounds indicate voids where mortar did not achieve full contact, often from insufficient coverage or mortar that skinned over before the tile was placed. Grout condition, tile thickness and joint width do not create hollow spots under the tile.
Question 23Occupational skills and work practices
What is the purpose of back-buttering a tile before setting it?
- To speed up the curing of the mortar
- To make the tile heavier so it stays down
- To seal the back of the tile against moisture
- To ensure full contact and coverage between the tile and the combed mortar bed Correct answer.
Explanation
Back-buttering spreads a thin layer of mortar on the tile back so that the combed ridges on the substrate collapse into it, achieving full coverage. It does not add weight for stability, seal the tile or accelerate curing. The goal is bond coverage.
Question 24Occupational skills and work practices
A tilesetter is asked to install tile over a fresh concrete slab poured two weeks earlier. What is the correct response?
- Tile over the slab after painting it with sealer
- Wait until the slab has cured sufficiently and moisture conditions are acceptable before tiling Correct answer.
- Tile immediately while the slab is still damp
- Tile over the slab without checking moisture at all
Explanation
Concrete must be adequately cured and its moisture condition verified before tiling, otherwise moisture vapour can debond the tile. Tiling on a damp slab or sealing it first does not solve the moisture problem and can trap it. Moisture must be checked, not ignored.
Question 25Occupational skills and work practices
Which grout joint width is generally appropriate for a rectified porcelain floor tile?
- No joint at all
- A narrow joint of about 2 to 3 mm, following the manufacturer's recommendation Correct answer.
- A joint of 25 mm
- A joint equal to the tile thickness
Explanation
Rectified porcelain has accurately sized, square edges that allow narrow joints of roughly 2 to 3 mm, as recommended by the manufacturer. Very wide joints, no joint, or a joint matched to tile thickness are not standard practice for this product.
Question 26Occupational skills and work practices
A tilesetter is preparing to install ceramic tile on a bathroom floor that will be exposed to frequent wetting. Which substrate preparation step must be completed before any tile is set?
- Lay a polyethylene vapour barrier directly on top of the substrate to isolate the mortar
- Apply a coat of bonding primer directly over any loose dust and debris to lock it in place
- Confirm the substrate is structurally sound, clean, and within the flatness tolerance required for the tile size Correct answer.
- Seal the substrate with a water-based curing compound to control moisture movement
Explanation
Every tiled floor depends on a substrate that is sound, clean, and flat enough for the tile module being installed. Flatness tolerance tightens as tile size increases, because large-format tile cannot be bent to follow undulations. Loose material and curing compounds prevent the mortar from bonding, so they must be removed rather than coated over.
Question 27Occupational skills and work practices
A tilesetter is setting large-format porcelain tile on a floor and needs full mortar coverage. Which trowel technique best supports that goal?
- Comb the mortar in one direction with a properly sized notched trowel and back-butter the tile Correct answer.
- Spread the mortar in a thin circular swirl and set the tile immediately without combing
- Apply mortar only at the corners of each tile to allow trapped air to escape
- Use a small notched trowel and rely on pressing the tile down firmly to spread the mortar
Explanation
Combing mortar in a single direction with a notched trowel of adequate size, combined with back-buttering, produces ridges that collapse uniformly and drive air out as the tile is embedded. This is how the required coverage percentage is achieved, particularly with large-format tile. Coverage is verified by lifting a tile before the mortar sets.
Question 28Occupational skills and work practices
A tilesetter is installing a tile floor over a wood-frame subfloor. Which condition must be satisfied for a durable installation?
- The subfloor must be sanded smooth and left unpainted so the mortar can grip the wood directly
- The subfloor deflection must be limited to the level the tile assembly can tolerate under the design load Correct answer.
- A single layer of plywood of any thickness is acceptable if it is screwed down tightly
- The joist spacing must be increased so the floor flexes evenly under traffic
Explanation
Tile and mortar are rigid and crack when the floor deflects beyond what the assembly can tolerate, so deflection under design load must be limited. Deflection is controlled by joist size, span, spacing, and the thickness and grade of the subfloor panels. Once deflection is controlled, an appropriate underlayment or membrane is installed.
Question 29Occupational skills and work practices
A tilesetter is installing tile on an exterior wall in a freeze-thaw climate. Which material selection is most appropriate?
- A tile installed with a thin layer of mastic to allow the assembly to flex with temperature
- A glazed wall tile with a high water absorption rate and a soft body
- A decorative tile fixed with organic adhesive and no movement joints
- A porcelain or fully vitrified tile with low water absorption rated for exterior use Correct answer.
Explanation
Exterior installations in freeze-thaw conditions require tile with low water absorption so absorbed water cannot expand and spall the body. Porcelain and fully vitrified tile are typically specified for this reason, along with a suitable exterior-rated setting material. Movement joints are also required to accommodate thermal cycling.
Question 30Occupational skills and work practices
A tilesetter is laying out a floor in a room where the walls are noticeably out of square. Which layout approach best manages the problem?
- Set the first course tight to the longest wall and cut the opposite side to fit
- Snap a reference line square to the primary focal wall and centre the layout on that line Correct answer.
- Start from one corner and work outward so the tile follows the walls exactly
- Begin at the doorway and let the pattern drift toward the far wall
Explanation
Establishing a reference line that is truly square, usually referenced to the main focal wall or entry sight line, keeps the field true even when the walls are not. The resulting taper is then absorbed in the perimeter cuts, where it is least visible. Working from an out-of-square corner propagates the error across the whole field.
Question 31Occupational skills and work practices
A tilesetter is choosing an adhesive to bond ceramic mosaic tile to a gypsum-based wall substrate in a dry interior area. Which product type is appropriate?
- A latex-portland cement mortar mixed with water only
- A dispersion adhesive formulated for interior dry-area use Correct answer.
- A dry-set mortar with no polymer modification
- A cement-based mortar with an acrylic latex additive
Explanation
Gypsum-based substrates are sensitive to moisture, so a cement-based thin-set applied wet is not appropriate in direct contact. A dispersion (mastic) adhesive formulated for interior dry areas is the usual choice for mosaic on gypsum wallboard. Manufacturer instructions for the specific substrate and tile must always govern.
Question 32Occupational skills and work practices
A tilesetter has finished grouting a floor and must clean the tile surface. Which practice protects the grout?
- Flood the floor with water immediately after grouting to wash away excess grout
- Wipe with clean water and change it frequently, then buff the haze after the grout has set sufficiently Correct answer.
- Scrub the joints with a stiff wire brush while the grout is still soft
- Leave the haze on the surface indefinitely so the grout can cure undisturbed
Explanation
Grout should be cleaned with clean water that is changed often, using a damp sponge and light pressure so the joints are not washed out. Final haze removal is done once the grout has firmed up, using a dry cloth or buffing. Excess water or aggressive scrubbing weakens the grout surface.
Question 33Occupational skills and work practices
A tilesetter must install a waterproofing membrane in a shower pan before setting tile. Which detail is critical at the drain?
- The membrane should be punctured at the low point to prevent ponding
- The membrane should stop short of the drain so water can escape under the tile
- The membrane must be clamped into a compatible drain flange to maintain continuity Correct answer.
- The membrane can be omitted at the drain if the grout is sealed
Explanation
Waterproofing is only effective if it is continuous, and the drain is the most common point of failure. A clamping ring drain with a compatible flange lets the membrane be mechanically captured so the assembly stays watertight. Any penetration or gap at the drain defeats the membrane.
Question 34Occupational skills and work practices
A tilesetter is installing tile on a wall and must bring the finished face flush with an adjacent painted drywall surface. Which trim approach achieves this?
- Use a surface bullnose or trim profile that covers the tile edge and bridges the transition Correct answer.
- Butt the cut tile edge directly against the drywall corner and fill the gap with grout
- Overlap the tile onto the drywall by 25 mm and caulk the joint
- Grind the tile edge to a 45-degree bevel and leave it exposed
Explanation
Trim profiles and bullnose pieces are made to finish an exposed tile edge and make the transition to adjacent finishes. They protect the cut edge and provide a clean, groutable or sealable junction. Bare cut edges are porous and look unfinished.
Question 35Occupational skills and work practices
A tilesetter is installing a stone tile floor and must decide on sealer. Which statement reflects correct practice?
- Sealer should be applied before grouting to prevent grout from staining the joints
- Sealer should be applied while the stone is still damp to draw it deeper into the pores
- Sealer should be applied to a clean, dry surface after grouting and full cure, following the product's reapplication schedule Correct answer.
- One coat of sealer permanently eliminates the need for maintenance
Explanation
Impregnating sealers work on clean, dry stone and are applied after grouting so the joints are not sealed over or contaminated. Curing and drying times from the manufacturer must be respected, and most sealers need periodic reapplication. Sealing damp stone traps moisture and produces blotchy results.
Question 36Occupational skills and work practices
A tilesetter is setting tile over an existing sound ceramic tile floor. Which preparation step is essential before new tile is installed?
- Remove all existing tile so the new installation can bond to the original substrate
- Roughen the glazed surface, clean it thoroughly, and use a suitable bonding method approved for tile over tile Correct answer.
- Grind off the glaze only at the perimeter and leave the field glazed
- Apply a thin coat of mastic directly over the glazed tile and set the new tile while it is tacky
Explanation
Tile over tile is possible when the existing installation is sound, well bonded, and flat, but the glazed surface must be abraded and cleaned so the new bonding layer can grip. An appropriate mortar or bonding system approved for that use is then applied. The existing substrate's condition and height build-up must also be confirmed.
Question 37Occupational skills and work practices
A tilesetter is installing a sloped shower floor and must maintain the required fall to the drain. Which practice is correct?
- Set the perimeter level and slope the field continuously toward the drain at the specified fall Correct answer.
- Build up mortar at the drain to raise it above the surrounding tile
- Set the entire floor flat and rely on the drain grate height to create fall
- Slope only the last row of tile nearest the drain
Explanation
A shower floor needs a continuous slope from a level perimeter to the drain so water flows without ponding. The specified fall is established in the mortar bed or preformed pan before tile is set. A flat field or a raised drain traps water.
Question 38Occupational skills and work practices
A tilesetter is estimating material for a diagonal tile layout in a room with several offsets and a closet. What allowance is most defensible?
- Order the measured area plus a waste allowance that reflects the diagonal layout and the number of cuts Correct answer.
- Order the measured area minus the closet because closets are usually left untiled
- Order half the measured area because diagonal cuts use less tile
- Order exactly the measured floor area with no allowance for cuts or breakage
Explanation
Diagonal layouts generate more offcuts and require more waste allowance than a straight grid, and rooms with offsets and closets add further cutting. The measured area plus a realistic waste percentage, confirmed against the actual layout, is the defensible estimate. Ordering exact area leaves no margin for breakage or future repairs.
Question 39Occupational skills and work practices
A tilesetter is installing a cementitious backer board as a tile substrate on a floor. Which installation detail is correct?
- Install the panels over a compressible layer and rely on the tile to bridge the joints
- Fasten only at the panel corners and leave the joints open for drainage
- Butt the panels tightly with no gap and omit fasteners in the field
- Fasten the panels with the specified screws and embed the joints in mortar with reinforcing tape Correct answer.
Explanation
Backer board must be fastened with the specified screws at the required spacing and the joints reinforced with tape embedded in mortar so the panels act as a continuous substrate. Panel joints are typically gapped per the manufacturer and the fasteners are driven flush. Open or unreinforced joints become crack paths.
Question 40Occupational skills and work practices
A tilesetter is planning a large floor installation in an occupied building and must control silica dust from cutting. Which control strategy best follows the hierarchy of controls?
- Provide respirators to every worker and continue dry cutting in the occupied space
- Open the windows and rely on general ventilation to dilute the dust
- Use wet cutting or on-tool dust extraction at the source, supplemented by respiratory protection as needed Correct answer.
- Post a warning sign at the entrance and schedule cutting during off hours
Explanation
The hierarchy of controls favours eliminating or capturing the hazard at the source before relying on personal protection. Wet cutting and on-tool extraction with HEPA filtration suppress silica dust where it is generated. Respiratory protection is a supplementary measure for residual exposure, not the primary control.
Question 41Surface preparation and substrate assessment
Before laying tile on a new concrete slab, which condition most directly indicates the slab is ready for a moisture-sensitive adhesive?
- The general contractor has scheduled tile installation for the following week
- A primer coat has been rolled on and is still tacky
- The slab surface feels dry to the touch and has no visible damp patches
- The slab has cured for at least 28 days and a moisture test reads within the adhesive manufacturer's limit Correct answer.
Explanation
Concrete must be evaluated for moisture emission or relative humidity using a recognised test, and the result must fall within the adhesive manufacturer's published limit. Curing time alone is not proof, but the 28-day minimum combined with an acceptable test result is the standard readiness benchmark.
Question 42Surface preparation and substrate assessment
A tiler is preparing a plywood subfloor for ceramic tile in an interior residential kitchen. Which preparation approach meets common industry requirements?
- Lay tile directly on the plywood using a modified thin-set mortar
- Install a single layer of 12 mm plywood and tile over it with epoxy adhesive
- Fasten a cement backer board over the plywood according to the board manufacturer's instructions Correct answer.
- Sand the plywood smooth and seal it with polyurethane before tiling
Explanation
Wood substrates move with moisture and temperature, so ceramic tile requires a dimensionally stable underlayment such as cement backer board installed to the manufacturer's fastening pattern. Direct bonding of tile to plywood is not an accepted practice for ceramic tile in this application.
Question 43Surface preparation and substrate assessment
What is the primary purpose of checking substrate flatness before installing large-format tile?
- To determine how many boxes of tile to order
- To confirm the substrate meets the tolerance so lippage and hollow spots are controlled Correct answer.
- To verify the tile has been stored at room temperature
- To decide which grout colour will match the tile
Explanation
Flatness tolerance governs how evenly mortar can be spread and how well large tile can be bedded without voids or lippage. Checking with a straightedge before setting allows correction while it is still inexpensive.
Question 44Surface preparation and substrate assessment
A concrete floor shows a white, powdery deposit on the surface. What is this condition and how should it be treated before tiling?
- Mould, which should be painted over with an encapsulating sealer
- Curing compound, which should be left in place to protect the slab
- Efflorescence, which should be removed mechanically and the moisture source corrected Correct answer.
- Latex residue, which should be left as a bonding agent
Explanation
Efflorescence is soluble salt carried to the surface by moisture and left behind as the water evaporates. It must be removed and the underlying moisture path corrected, because leaving it or simply coating over it will interfere with adhesion.
Question 45Surface preparation and substrate assessment
Why must a tiler remove paint, adhesive residue, and curing compounds from a concrete slab before applying thin-set mortar?
- They increase the slab's compressive strength beyond specification
- They cause the tile to expand after installation
- These materials form a weak boundary layer that prevents the mortar from bonding to the concrete Correct answer.
- They change the colour of the finished grout joints
Explanation
Mortar bonds to the concrete surface itself, so any film or residue between them becomes the weakest link and can allow debonding. Mechanical scarifying or grinding is typically required to expose clean, sound concrete.
Question 46Surface preparation and substrate assessment
Which test is commonly used to assess the moisture vapour emission rate of a concrete slab?
- Sand patch test
- Slump test
- Ball penetration test
- Anhydrous calcium chloride test Correct answer.
Explanation
The calcium chloride test measures moisture vapour emission from a concrete slab over a set exposure period. It is one of the recognised methods used to judge whether a slab is dry enough for a given flooring adhesive or membrane.
Question 47Surface preparation and substrate assessment
When a substrate is too absorptive and pulls water rapidly from thin-set mortar, what preparation step is appropriate?
- Apply a suitable primer or pre-wet the surface according to the mortar manufacturer's directions Correct answer.
- Spread the mortar much thicker to retain moisture
- Add extra water to the mortar to compensate for absorption
- Apply a coat of oil-based paint to seal the surface
Explanation
Highly absorptive substrates can dehydrate the mortar before it cures, reducing bond strength. Priming or dampening the surface, as directed by the mortar manufacturer, restores proper curing conditions.
Question 48Surface preparation and substrate assessment
A tiler is about to tile over an existing vinyl floor covering. Which condition makes removal of the vinyl the required course of action?
- The vinyl is a single fully bonded sheet with a matte finish
- The vinyl is lighter in colour than the new tile
- The vinyl is cushioned, loosely bonded, or has multiple layers Correct answer.
- The vinyl was installed more than ten years ago
Explanation
Cushioned, unbonded, or multi-layer resilient flooring cannot provide a stable base and must be removed. A single, well-bonded, non-cushioned sheet may sometimes be acceptable if the manufacturer permits it and the surface is properly prepared.
Question 49Surface preparation and substrate assessment
A tiler is assessing a slab and finds a network of fine hairline cracks with no vertical displacement. What is the appropriate first step?
- Cover the entire slab with a thick layer of sand
- Ignore them because hairline cracks never telegraph through tile
- Fill them with grout and proceed immediately
- Evaluate whether the cracks are stable and treat them with a crack isolation membrane if the covering requires it Correct answer.
Explanation
Hairline cracks without displacement are often shrinkage cracks, but they still need evaluation for stability and movement. A crack isolation membrane or suitable treatment prevents the crack from reflecting through the tile.
Question 50Surface preparation and substrate assessment
A tiler must prepare a concrete slab that has a high spot of 10 mm across a 3 m straightedge. What does this condition most likely require?
- Installing the tile with a tighter joint to hide the variation
- Grinding down the high spot or applying a levelling underlayment before tiling Correct answer.
- Using a darker grout to reduce visual lippage
- Increasing the mortar bed thickness only under the tile near the high spot
Explanation
Flatness deviations beyond tolerance must be corrected by grinding high areas or filling low areas with a suitable levelling compound. Trying to compensate locally with mortar thickness leads to lippage and inconsistent bond.