Red Seal Tilesetter study materials
Red Seal Tilesetter study resources

Red Seal Tilesetter study plan

Red Seal Tilesetter · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Installation of tile, mosaic, glass and stone & Surface preparation and substrate assessment

  • Build a one-page reference table of tile types (ceramic, porcelain, glass, natural stone) listing water absorption, PEI/Mohs wear rating, and recommended adhesive class for each

  • List the 8 most common substrates (concrete slab, cured mortar bed, cement backer board, gypsum board, plywood, existing tile, waterproof membrane, heated floor) and record the deflection, flatness, and moisture criteria each must meet before tile is set

  • Demonstrate and describe the water-absorption test on a porcelain and a ceramic sample and explain how the result drives adhesive and grout selection

  • Calculate adhesive coverage and open-time limits for 3 given trowel sizes and explain how notch depth relates to tile size and substrate flatness

Your checkpoint

A 2-page substrate-and-material decision matrix covering at least 8 substrates and 4 tile types, with adhesive class and trowel notch specified for each combination

Week 2

Installation of tile, mosaic, glass and stone & Surface preparation and substrate assessment

  • Sequence the steps for installing a cement backer board over a wood subfloor, including thinset embedment, fastener spacing, and joint treatment

  • Describe the procedure for applying a liquid waterproofing membrane and state the required thickness, cure time, and flood-test method for a shower pan

  • Explain how to assess and correct substrate flatness using a 3 m straightedge and identify when self-levelling underlayment is appropriate

  • Differentiate between uncoupling, crack-isolation, and waterproofing membranes and select the correct one for 4 described site conditions

Your checkpoint

A written step-by-step waterproofing and substrate-preparation procedure for one shower and one floor, with flatness tolerances and cure times stated

Week 3

Layout, measurement and setting out & Installation of tile, mosaic, glass and stone

  • Set out a square reference line in a room using the 3-4-5 method and explain how to verify squareness by measuring diagonals

  • Calculate tile quantities, waste allowance, and layout centring for 3 floor plans including one with a diagonal layout

  • Describe how to plan cuts so that no cut tile is narrower than half a full tile at perimeters and doorways

  • Lay out a running-bond and a herringbone pattern on paper at scale and mark the starting point and control lines for each

Your checkpoint

Three scaled layout drawings (straight, diagonal, herringbone) with control lines, starting points, cut plans, and a materials take-off including 10% waste

Week 4

Layout, measurement and setting out & Installation of tile, mosaic, glass and stone

  • Explain how to transfer layout lines to walls for a tub surround, including level ledger placement and vertical alignment with floor joints

  • Describe dry-laying and pattern-matching procedures for large-format tile and stone with vein direction and shade variation

  • Identify the tools used to cut porcelain, glass, and natural stone and match each material to the correct blade or cutter type

  • Plan the layout around a drain and a niche in a shower, keeping full tiles at the most visible edges

Your checkpoint

A shower and tub-surround layout package: elevation sketches with ledger and control lines, drain and niche cut plan, and a tool-selection list by material

Week 5

Installation of tile, mosaic, glass and stone & Occupational skills and work practices

  • Demonstrate the back-buttering and keying-in technique for large-format tile and state the minimum required coverage percentage for wet and dry areas

  • Describe the installation sequence for mosaic sheets on a shower floor, including slope to drain, mesh orientation, and joint alignment

  • Explain the safe handling and cutting of glass tile, including the adhesive type and the risk of shadowing and lippage

  • List the personal protective equipment and site practices required when cutting silica-containing tile and stone, including wet-cutting and dust control

  • Describe how to install a stone threshold and a tile-to-carpet transition

Your checkpoint

A coverage and technique checklist covering large-format, mosaic, glass, and stone installations, with the required adhesive coverage percentage and PPE listed for each

Week 6

Grouting, sealing, finishing and repair & Occupational skills and work practices

  • Select the correct grout type (cementitious sanded, unsanded, epoxy, high-performance) for 5 given tile and application scenarios and justify each choice

  • Describe the grouting procedure for porous stone and glass tile, including pre-sealing, release time, and cleanup to avoid haze

  • Explain how to apply sealant to movement joints, changes of plane, and penetrations, and state where grout must not be used

  • Sequence the final cleaning and sealing steps for a completed floor and a wet area, including cure times before sealing

Your checkpoint

A grout-and-sealant selection guide plus a finishing schedule for one bathroom and one floor, with cure times and joint types specified

Week 7

Grouting, sealing, finishing and repair & Occupational skills and work practices

  • Diagnose 5 described failures (lippage, efflorescence, hollow tiles, cracked grout, delamination) and trace each to its root cause and repair method

  • Describe how to remove and replace a single damaged tile without damaging adjacent tiles or the waterproofing

  • Explain how to document a deficiency and write a short repair scope for a punch-list item

  • State the warranty, curing, and protection requirements that must be met before handover of a tiled floor

Your checkpoint

A failure-diagnosis and repair log covering 5 defects, each with root cause, repair steps, and prevention note

Week 8

Occupational skills and work practices & Surface preparation and substrate assessment & Layout, measurement and setting out & Installation of tile, mosaic, glass and stone & Grouting, sealing, finishing and repair

  • Complete a full timed practice exam under exam conditions and score it by domain

  • Re-study the two lowest-scoring domains using the notes and matrices built in weeks 1-7

  • Recite from memory the key tolerances: substrate flatness, adhesive coverage, joint width, and cure times

  • Build a one-page formula and reference sheet for quantities, layout, and setting-out calculations

Your checkpoint

A scored practice exam with a domain-by-domain error analysis and a one-page final reference sheet

Milestones