SAMRA key terms
SAMRA · Get comfortable with the vocabulary.
- Risk
- Related: Uncertainty, Inherent Risk, Risk Appetite
The effect of uncertainty on objectives, where the effect is a deviation from what is expected and can be positive or negative. It is usually described by a cause, a potential event, and its consequences.
- Uncertainty
- Related: Risk, Risk Appetite
A lack of complete knowledge about an outcome, its likelihood, or its consequences. It is the raw condition that risk management tries to understand, reduce, or accommodate rather than eliminate entirely.
- Inherent Risk
- Related: Residual Risk, Risk Treatment
The level of risk that exists before any controls or mitigation measures are applied. It is used as a baseline for judging how much protection existing controls actually provide and where treatment is most justified.
- Residual Risk
- Related: Inherent Risk, Risk Acceptance, Risk Treatment
The risk that remains after existing controls and treatment actions have been applied. Comparing it with inherent risk shows control effectiveness and whether further action or formal acceptance is needed.
- Risk Appetite
- Related: Risk Tolerance, Risk Acceptance, Risk Criteria
The amount and type of risk an organization is willing to pursue or retain in order to meet its objectives. It is set by senior leadership and shapes which risks are accepted, reduced, or avoided.
- Risk Tolerance
- Related: Risk Appetite, Risk Criteria
The practical deviation from risk appetite that an organization can accept for a specific objective or category. It translates a broad appetite statement into measurable limits that operational staff can apply.
- Likelihood
- Related: Consequence, Risk Level, Risk Matrix
The chance that a given event or scenario will occur within a stated period or context. It is one of the two dimensions, alongside consequence, used to estimate the level of a risk.
- Consequence
- Related: Likelihood, Risk Level, Risk Matrix
The outcome or impact on objectives if an event occurs, expressed in financial, operational, safety, legal, or reputational terms. It describes how bad or good the effect would be, independent of how likely it is.
- Risk Level
- Related: Likelihood, Consequence, Risk Matrix
The combined significance of a risk, usually derived by combining likelihood and consequence. Levels such as low, medium, or high help prioritize which risks need treatment or escalation.
- Risk Matrix
- Related: Risk Level, Risk Criteria, Risk Evaluation
A tool that plots likelihood against consequence on a grid to assign risk levels and priorities. Its scales and thresholds must be defined clearly, because poor design can hide serious risks.
- Risk Criteria
- Related: Risk Evaluation, Risk Appetite, Risk Tolerance
The defined terms of reference used to judge the significance of a risk, including scales, thresholds, and appetite limits. They make evaluations consistent and comparable across different parts of an organization.
- Risk Identification
- Related: Risk Register, Risk Analysis, Brainstorming
The process of finding, recognizing, and describing risks that could affect objectives, including their sources, causes, and potential events. It is the foundation for all later analysis and treatment work.
- Risk Analysis
- Related: Risk Identification, Risk Evaluation, Risk Level
The process of understanding the nature of an identified risk and determining its level by examining causes, likelihood, consequences, and existing controls. It provides the evidence needed for evaluation and treatment decisions.
- Risk Evaluation
- Related: Risk Analysis, Risk Criteria, Risk Treatment
The process of comparing analysis results with risk criteria to decide whether a risk is acceptable or needs treatment. It turns analysis into a judgment about significance and priority.
- Risk Register
- Related: Risk Identification, Risk Owner, Risk Treatment
A structured record of identified risks, usually capturing description, owner, causes, controls, ratings, and treatment actions. It is the main working document for tracking and reporting the risk profile.
- Risk Owner
- Related: Risk Register, Risk Treatment, Risk Appetite
The person accountable for managing a specific risk, including approving treatment plans and monitoring changes in its level. Clear ownership prevents risks from being identified but left unmanaged.
- Risk Treatment
- Related: Risk Acceptance, Residual Risk, Control
The process of selecting and implementing options to modify risk, such as avoiding, reducing, transferring, or accepting it. The chosen option should be proportionate to the risk level and aligned with appetite.
- Risk Avoidance
- Related: Risk Treatment, Risk Reduction, Risk Acceptance
A treatment option that removes the activity or exposure generating the risk altogether. It can eliminate a threat but may also forfeit opportunities, so it is usually reserved for unacceptable risks.
- Risk Reduction
- Related: Control, Residual Risk, Risk Treatment
A treatment option that lowers either the likelihood or the consequence of a risk through controls or changes to the activity. It is the most common response and usually leaves some residual risk.
- Risk Transfer
- Related: Risk Treatment, Risk Sharing, Residual Risk
A treatment option that shifts the financial or contractual burden of a risk to another party, such as an insurer or supplier. It does not remove the underlying risk, and some responsibility often remains.
- Risk Acceptance
- Related: Residual Risk, Risk Appetite, Risk Treatment
A treatment decision to retain a risk without further action, made knowingly and within approved authority. Acceptance is only valid when the residual level sits within tolerance and is formally recorded.
- Control
- Related: Risk Reduction, Residual Risk, Control Effectiveness
A measure that modifies risk, either by preventing an event, detecting it, or limiting its consequences. Controls can be preventive, detective, or corrective, and their effectiveness must be verified rather than assumed.
- Control Effectiveness
- Related: Control, Residual Risk, Key Risk Indicator
A judgment of how well a control performs in practice, including its design and whether it operates as intended. Weak effectiveness means residual risk is higher than the design suggests.
- Key Risk Indicator
- Related: Control Effectiveness, Risk Monitoring, Risk Appetite
A measurable metric that signals rising or falling exposure to a specific risk before losses occur. Good indicators are linked to a risk driver, have defined thresholds, and trigger a response when breached.
- Risk Communication
- Related: Risk Reporting, Stakeholder, Risk Culture
The exchange of risk information between stakeholders so that they understand exposure and can make informed decisions. It must be timely, accurate, and tailored to the audience's needs and expertise.
- Risk Reporting
- Related: Risk Communication, Risk Register, Key Risk Indicator
The formal process of providing decision-makers with structured information on risk levels, trends, and treatment progress. Effective reports are concise, comparable over time, and focused on what requires action.
- Risk Culture
- Related: Risk Communication, Governance, Risk Appetite
The shared values, attitudes, and behaviors that determine how an organization identifies and responds to risk. A healthy culture encourages open reporting of bad news rather than hiding it.
- Stakeholder
- Related: Risk Communication, Risk Reporting
Any person or group that can affect, be affected by, or perceive itself to be affected by a decision or risk. Identifying them early shapes communication and treatment priorities.
- Risk Monitoring
- Related: Key Risk Indicator, Risk Review, Control Effectiveness
The ongoing checking of risks, controls, and treatment progress to detect changes and confirm that plans are working. It relies on indicators, reviews, and audit activity rather than a one-off assessment.
- Risk Review
- Related: Risk Monitoring, Continual Improvement, Risk Analysis
A periodic or triggered reassessment of the risk profile to confirm that ratings, controls, and treatment plans remain valid. Reviews are essential when context changes, such as a new project phase or external shock.
- Continual Improvement
- Related: Risk Review, Risk Maturity, Lessons Learned
The recurring effort to strengthen the risk management framework and its outputs based on performance data, incidents, and feedback. It keeps the process relevant as the organization and its environment evolve.
- Lessons Learned
- Related: Continual Improvement, Risk Review
Knowledge captured from past projects, incidents, or near misses and used to improve future decisions. It is most valuable when stored accessibly and actively applied, not merely recorded after closure.
- Governance
- Related: Three Lines Model, Risk Culture, Risk Appetite
The system of direction and oversight by which an organization sets objectives, assigns accountability, and monitors performance, including risk management. It defines who decides, who reports, and how assurance is obtained.
- Three Lines Model
- Related: Governance, Risk Owner, Assurance
A structure that separates management, risk and compliance oversight, and independent internal audit into distinct roles. It clarifies accountability and reduces gaps or duplication in assurance.
- Assurance
- Related: Three Lines Model, Control Effectiveness, Governance
Independent or objective evidence that controls and risk processes are working as intended. It can come from internal audit, external audit, testing, or certification and supports governing bodies in their oversight.
- Risk Management Framework
- Related: Governance, Risk Criteria, Risk Maturity
The set of principles, structures, processes, and responsibilities that guide how risk is managed across an organization. It provides consistency and links risk activity to strategy and decision-making.
- Risk Maturity
- Related: Risk Management Framework, Continual Improvement
A measure of how embedded, systematic, and effective an organization's risk management practices are. Higher maturity means risk information is used proactively in decisions rather than produced for compliance only.
- Project Risk Management
- Related: Programme Risk, Risk Register, Risk Review
The application of risk processes to a defined project, covering scope, schedule, cost, quality, and benefits uncertainty. It must be integrated with project planning and reviewed at each phase gate.
- Programme Risk
- Related: Project Risk Management, Risk Register
Risk arising from a group of related projects and the coordination between them, including dependency and benefit-realization risk. It differs from project risk because it concerns the wider portfolio of change.
- Emerging Risk
- Related: Horizon Scanning, Organizational Resilience, Risk Identification
A risk that is new, increasing, or newly visible and whose impact is not yet well understood. It requires early scanning and scenario thinking because historical data may not reveal its likelihood or scale.
- Horizon Scanning
- Related: Emerging Risk, Organizational Resilience
The systematic search for signals of change, threats, and opportunities that could affect the organization in future. It feeds emerging risk identification and long-term strategic planning.
- Organizational Resilience
- Related: Business Continuity, Emerging Risk, Horizon Scanning
The capacity of an organization to anticipate, absorb, adapt to, and recover from disruption while continuing to deliver its objectives. It combines risk management, business continuity, and adaptive leadership.
- Business Continuity
- Related: Organizational Resilience, Consequence
The capability to keep critical activities running, or restore them quickly, during and after disruption. It depends on impact analysis, recovery priorities, and tested response plans.