TSSA Gas Technician 2 (G2) study materials
TSSA Gas Technician 2 (G2) study resources

TSSA Gas Technician 2 (G2) study plan

TSSA Gas Technician 2 (G2) · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Gas fundamentals and properties of gases

  • Define the measurable physical properties of natural gas and propane (relative density, heating value ranges, Wobbe index, flammability limits, ignition temperature) and state how each affects appliance operation

  • Convert between imperial and SI units for pressure, heat input, gas rate, and specific gravity without reference aids

  • Explain the relationship between pressure, gas rate, and orifice size, and predict what happens to burner input when supply pressure changes

  • Describe complete and incomplete combustion and identify the products and symptoms of each in a gas appliance

Your checkpoint

One-page reference sheet of gas properties and unit conversions, self-quizzed to 90% accuracy on 20 recall items

Week 2

Gas fundamentals and properties of gases & Venting, combustion air and appliance installation

  • Calculate combustion air requirements for a given appliance input and room volume, and determine whether a confined space needs two permanent openings

  • Explain draft, spillage, and the difference between natural draft, induced draft, and power-vented appliances

  • Trace the path of flue gases through a Category I through IV appliance and justify why each category needs its venting approach

  • Identify the signs of depressurization and spillage in a residential setting and state the test that confirms each

Your checkpoint

Worked solution set of five combustion air and venting calculations with reasoning shown for each step

Week 3

Codes, regulations and standards

  • Locate and read the clauses governing installation clearances, venting, and piping in the current Canadian gas installation code and the applicable provincial regulation

  • Distinguish the roles of the national code, the provincial regulation, the CSA certification mark, and the manufacturer's installation instructions when requirements conflict

  • List the approval and notification steps a G2 holder must follow before and after installing or altering an appliance

  • Identify the documentation an inspector may request at each stage of a job

Your checkpoint

Annotated clause index of 15 code sections with a one-line summary of what each controls

Week 4

Codes, regulations and standards & Installation of gas piping and tubing systems

  • Size a natural gas and a propane piping run using the pipe sizing tables, including equivalent length for fittings and allowable pressure drop

  • Select between steel pipe, copper tubing, and corrugated stainless steel tubing for a given application and justify the choice against code and material limits

  • Describe required support spacing, protection from physical damage, and the rules for concealed and underground runs

  • Explain bonding and grounding requirements for gas piping and why they matter

Your checkpoint

Completed pipe sizing worksheet for a two-appliance residential layout, showing equivalent lengths and selected sizes

Week 5

Installation of gas piping and tubing systems

  • Lay out a piping system from meter to appliances including drip legs, sediment traps, shutoff valves, and union locations

  • Specify the leak test procedure for a new installation: test medium, pressure, duration, and what constitutes a pass

  • Identify the correct method for joining each material type and the inspection points a code officer would check

  • Diagnose three common piping faults (undersized run, missing sediment trap, improper concealed joint) and state the corrective action for each

Your checkpoint

Hand-drawn isometric piping plan with a written leak test procedure and pass criteria

Week 6

Venting, combustion air and appliance installation

  • Verify vent connector slope, rise, termination clearance, and liner requirements for a specified appliance and building configuration

  • Determine whether an existing chimney or vent can accept a new appliance and identify when relining or resizing is required

  • Check combustion air, clearance to combustibles, and accessibility against manufacturer's instructions for two sample appliances

  • Explain the risks of common venting and backdrafting and the field tests that reveal them

Your checkpoint

Venting compliance checklist applied to two sample installations, with a pass/fail verdict and cited reason for each item

Week 7

Testing, commissioning, servicing and troubleshooting

  • Perform and record a clock-dial gas rate test and a manifold pressure test, and interpret results against the appliance rating plate

  • Describe the startup sequence and safety checks for a newly installed appliance, including purging, pilot and ignition verification, and limit and safety switch testing

  • Build a troubleshooting sequence for three faults: intermittent ignition failure, delayed ignition, and sooting, listing the checks in order

  • Explain carbon monoxide testing procedure, acceptable readings, and the actions required when readings exceed limits

Your checkpoint

Completed commissioning and troubleshooting log for three simulated fault scenarios with the diagnostic path recorded

Week 8

Gas fundamentals and properties of gases & Codes, regulations and standards & Installation of gas piping and tubing systems & Venting, combustion air and appliance installation & Testing, commissioning, servicing and troubleshooting

  • Review weak areas flagged by earlier deliverables and re-derive the underlying rule or calculation for each

  • Practice applying code clauses to short scenario questions under time pressure across all five domains

  • Recite the safety-critical limits from memory: leak test pressures, clearances, combustion air ratios, and CO thresholds

  • Plan the exam-day approach: question triage, unit-checking habit, and how to handle questions where two answers look plausible

Your checkpoint

Full-length timed practice exam with a written error analysis of every missed question

Milestones

Week 4: Score at least 80% on a 30-question mixed set covering Domains 1 and 2, and complete the pipe sizing worksheet with no arithmetic errors

Week 6: Score at least 80% on a 40-question set weighted to Domains 3 and 4, and correctly pass/fail both venting checklists with cited reasons

Week 8: Score at least 85% overall on the timed practice exam with no domain below 75%, and every missed question traced to a specific rule or calculation