CA Well Driller study plan
CA Well Driller · Give each week a clear focus.
8 weeks · About 6 hours per week
Well drilling and construction practices & California well standards, reporting, and licensing law
Map the California Water Code and Well Standards framework by writing a one-page outline of which authority (DWR bulletins, local ordinance, RWQCB) governs each drilling activity you perform
Define and correctly use 25 core drilling terms (annular seal, surface seal, gravel pack, blank casing, perforated interval, blowout, artesian flow, etc.) in your own words
Sketch a typical well construction cross-section from memory, labeling casing, seal, filter pack, and screen depths
List the permit and notification steps a C-57 contractor must complete before, during, and after drilling a new well in your county
Your checkpoint
A one-page annotated well cross-section plus a 25-term glossary with the governing authority cited next to each construction element
Well drilling and construction practices
Compare rotary, cable-tool, air-percussion, and mud-rotary methods by listing the formation conditions and hole-stability problems each suits
Explain how drilling fluid properties (weight, viscosity, sand content) affect hole cleaning and borehole integrity
Identify common drilling problems (lost circulation, stuck tools, caving, deviation) and write the standard mitigation for each
Describe the correct procedure for setting and verifying plumbness and alignment of a borehole
Your checkpoint
A 15-row troubleshooting table mapping drilling symptom to likely cause to corrective action
Well casings, seals, and annular space requirements
Specify casing material, wall thickness, diameter, and joint type for three different scenarios (domestic, irrigation, monitoring) and justify each choice
Detail the required depth and method for the annular seal and surface seal, including the minimum thickness and the materials allowed
Explain the purpose of the filter pack and screen slot sizing relative to formation gradation, and compute a slot size from a sample sieve analysis
Describe how to place grout or bentonite from the bottom up and how to verify seal integrity
Your checkpoint
A casing-and-seal specification sheet for three well types, including seal depths, materials, and placement method
Well casings, seals, and annular space requirements & Well development, testing, and disinfection
Sequence the steps of well development (surge, bail, jet, air-lift) and state which development method fits which screen and formation type
Explain how development restores formation permeability and how to judge when development is complete
Describe the purpose and procedure of a pump test, including drawdown measurement, stabilization criteria, and specific capacity calculation
Distinguish between disinfection for a new well and for a repaired well, and state the chlorine concentration and contact time required
Your checkpoint
A written development-and-testing procedure for one well, including a completed specific-capacity calculation and a disinfection step list
Well development, testing, and disinfection & Well abandonment and destruction
Interpret a pump test data set by plotting drawdown versus time and identifying stabilization and specific capacity
Explain the disinfection process from start to finish, including how to handle chlorine contact water and how to verify residual
List the conditions that require well destruction rather than continued use, and the notification steps to the enforcing agency
Describe abandonment methods for different casing types (perforated, steel, PVC) and the sealing materials used in each
Identify the reporting requirements triggered by well destruction and where records are filed
Your checkpoint
A completed well-destruction plan for one hypothetical well, including method, seal materials, notifications, and the report to be filed
Well abandonment and destruction & California well standards, reporting, and licensing law
Outline the sequence of well destruction from pre-work inspection through final seal verification and site restoration
Explain the requirements for destroying a well that penetrates multiple aquifers and the risk of cross-contamination if seals fail
Summarize the reporting obligations for new well construction, modification, and destruction, including who signs and who receives each report
Describe the licensing framework for C-57 contractors: scope of work, supervision requirements, and the consequences of unlicensed contracting
Your checkpoint
A one-page destruction and reporting checklist covering pre-work, sealing, verification, and the reports due to the enforcing agency
California well standards, reporting, and licensing law & Well drilling and construction practices
Explain the enforcement roles of the county, DWR, and the RWQCB and how each can affect a drilling project
Describe the permit process, including what information a permit application must contain and the inspection points
Identify the legal and practical consequences of noncompliance, including stop-work orders, permit revocation, and liability
Review your weakest domain from earlier weeks and re-teach it by writing a short summary of the key rules
Your checkpoint
A compliance scenario write-up that traces one well project through permitting, inspection, and reporting, with the governing rule cited at each step
Well drilling and construction practices & Well casings, seals, and annular space requirements & Well development, testing, and disinfection & Well abandonment and destruction & California well standards, reporting, and licensing law
Take a timed 60-question practice set across all five domains and score it by domain
Review every missed question and write a one-line rule or fact for each
Rehearse the calculations most likely to appear: specific capacity, seal volume, chlorine dose, and screen slot sizing
Build a one-page quick-reference sheet of the highest-yield standards, depths, and reporting deadlines
Your checkpoint
A scored practice exam with a written correction log and a one-page quick-reference sheet
Milestones
Week 2: Can sketch and label a complete well cross-section from memory and explain the drilling method choice for three formations
Week 4: Can state seal depth, thickness, and material requirements for a given well without notes, and complete a specific-capacity calculation correctly
Week 6: Can walk through a full well destruction from notification to final report and name the enforcing agency at each step
Week 8: Scores at least 80 percent on the timed 60-question practice set, with no domain below 70 percent