CA Well Driller study materials
CA Well Driller study resources

CA Well Driller study plan

CA Well Driller · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Well drilling and construction practices & California well standards, reporting, and licensing law

  • Map the California Water Code and Well Standards framework by writing a one-page outline of which authority (DWR bulletins, local ordinance, RWQCB) governs each drilling activity you perform

  • Define and correctly use 25 core drilling terms (annular seal, surface seal, gravel pack, blank casing, perforated interval, blowout, artesian flow, etc.) in your own words

  • Sketch a typical well construction cross-section from memory, labeling casing, seal, filter pack, and screen depths

  • List the permit and notification steps a C-57 contractor must complete before, during, and after drilling a new well in your county

Your checkpoint

A one-page annotated well cross-section plus a 25-term glossary with the governing authority cited next to each construction element

Week 2

Well drilling and construction practices

  • Compare rotary, cable-tool, air-percussion, and mud-rotary methods by listing the formation conditions and hole-stability problems each suits

  • Explain how drilling fluid properties (weight, viscosity, sand content) affect hole cleaning and borehole integrity

  • Identify common drilling problems (lost circulation, stuck tools, caving, deviation) and write the standard mitigation for each

  • Describe the correct procedure for setting and verifying plumbness and alignment of a borehole

Your checkpoint

A 15-row troubleshooting table mapping drilling symptom to likely cause to corrective action

Week 3

Well casings, seals, and annular space requirements

  • Specify casing material, wall thickness, diameter, and joint type for three different scenarios (domestic, irrigation, monitoring) and justify each choice

  • Detail the required depth and method for the annular seal and surface seal, including the minimum thickness and the materials allowed

  • Explain the purpose of the filter pack and screen slot sizing relative to formation gradation, and compute a slot size from a sample sieve analysis

  • Describe how to place grout or bentonite from the bottom up and how to verify seal integrity

Your checkpoint

A casing-and-seal specification sheet for three well types, including seal depths, materials, and placement method

Week 4

Well casings, seals, and annular space requirements & Well development, testing, and disinfection

  • Sequence the steps of well development (surge, bail, jet, air-lift) and state which development method fits which screen and formation type

  • Explain how development restores formation permeability and how to judge when development is complete

  • Describe the purpose and procedure of a pump test, including drawdown measurement, stabilization criteria, and specific capacity calculation

  • Distinguish between disinfection for a new well and for a repaired well, and state the chlorine concentration and contact time required

Your checkpoint

A written development-and-testing procedure for one well, including a completed specific-capacity calculation and a disinfection step list

Week 5

Well development, testing, and disinfection & Well abandonment and destruction

  • Interpret a pump test data set by plotting drawdown versus time and identifying stabilization and specific capacity

  • Explain the disinfection process from start to finish, including how to handle chlorine contact water and how to verify residual

  • List the conditions that require well destruction rather than continued use, and the notification steps to the enforcing agency

  • Describe abandonment methods for different casing types (perforated, steel, PVC) and the sealing materials used in each

  • Identify the reporting requirements triggered by well destruction and where records are filed

Your checkpoint

A completed well-destruction plan for one hypothetical well, including method, seal materials, notifications, and the report to be filed

Week 6

Well abandonment and destruction & California well standards, reporting, and licensing law

  • Outline the sequence of well destruction from pre-work inspection through final seal verification and site restoration

  • Explain the requirements for destroying a well that penetrates multiple aquifers and the risk of cross-contamination if seals fail

  • Summarize the reporting obligations for new well construction, modification, and destruction, including who signs and who receives each report

  • Describe the licensing framework for C-57 contractors: scope of work, supervision requirements, and the consequences of unlicensed contracting

Your checkpoint

A one-page destruction and reporting checklist covering pre-work, sealing, verification, and the reports due to the enforcing agency

Week 7

California well standards, reporting, and licensing law & Well drilling and construction practices

  • Explain the enforcement roles of the county, DWR, and the RWQCB and how each can affect a drilling project

  • Describe the permit process, including what information a permit application must contain and the inspection points

  • Identify the legal and practical consequences of noncompliance, including stop-work orders, permit revocation, and liability

  • Review your weakest domain from earlier weeks and re-teach it by writing a short summary of the key rules

Your checkpoint

A compliance scenario write-up that traces one well project through permitting, inspection, and reporting, with the governing rule cited at each step

Week 8

Well drilling and construction practices & Well casings, seals, and annular space requirements & Well development, testing, and disinfection & Well abandonment and destruction & California well standards, reporting, and licensing law

  • Take a timed 60-question practice set across all five domains and score it by domain

  • Review every missed question and write a one-line rule or fact for each

  • Rehearse the calculations most likely to appear: specific capacity, seal volume, chlorine dose, and screen slot sizing

  • Build a one-page quick-reference sheet of the highest-yield standards, depths, and reporting deadlines

Your checkpoint

A scored practice exam with a written correction log and a one-page quick-reference sheet

Milestones

Week 2: Can sketch and label a complete well cross-section from memory and explain the drilling method choice for three formations

Week 4: Can state seal depth, thickness, and material requirements for a given well without notes, and complete a specific-capacity calculation correctly

Week 6: Can walk through a full well destruction from notification to final report and name the enforcing agency at each step

Week 8: Scores at least 80 percent on the timed 60-question practice set, with no domain below 70 percent