Baupolier/in BP (Switzerland) cheat sheet
Baupolier/in BP (Switzerland) · Keep the key ideas within reach.
Control execution against the approved technical basis
Use current approved documents, references, and criteria.
Resolve interfaces before concealed or irreversible work.
Link inspection evidence to location, stage, and acceptance rules.
Keep quantity assumptions separate from actual engineering requirements.
Plan prerequisites, resources, interfaces, and a workable sequence
Check prerequisites rather than relying on a scheduled date.
Plan access, shared resources, storage, and trade interfaces.
Separate labour effort, duration, and measured progress.
Communicate and document the operational effect of changes.
Integrate Swiss site safety with the actual work and environment
Plan for the actual hazards, responsibilities, and emergency arrangements.
Do not substitute PPE or caution for required protective measures.
Coordinate shared-site traffic, access, and understandable instructions.
Include health and environmental risks and reassess changed conditions.
Lead crews with clear tasks, feedback, and safe escalation
Assign work with clear results, references, checks, and authority.
Check understanding and communicate changed interfaces.
Base feedback on observable facts and the actual cause.
Maintain accountability without suppressing questions or safety reports.
Record site facts, quantities, and changes so they can be checked
Separate observed facts from uncertain attribution.
Define units, location, method, and contractual measurement basis.
Distinguish delivery, installation, acceptance, and payment evidence.
Preserve a traceable record of corrections, instructions, and changes.