CIA Part 2 study plan
CIA Part 2 · Give each week a clear focus.
8 weeks · About 7 hours per week
Engagement Planning
Sequence the steps of engagement planning and match each step to the governing IIA Standard number
Distinguish engagement objectives, engagement scope, and risk assessment for three different scenario prompts
Assess process-level and entity-level risks and rank them by significance to the engagement plan
Write ten exam-style questions on planning concepts and score your own answers against the standards
Your checkpoint
A one-page planning checklist listing the ordered planning steps, each with its standard citation and a one-line 'why it matters' note
Engagement Planning
Construct a work program of at least 12 steps for a hypothetical procurement engagement, tying every step to a stated objective
Determine staffing, budgeted hours, and specialist needs for that engagement and justify each allocation in writing
Differentiate an internal audit engagement from other assurance and consulting providers and outline the coordination points between them
Solve 30 scenario-based questions on planning and classify every wrong answer by error type
Your checkpoint
A complete engagement planning memo plus a 12-step work program for the procurement case, with a score of at least 80% on the 30-question set
Engagement Execution
Classify six pieces of evidence by sufficiency, relevance, reliability, and usefulness, and defend each classification
Differentiate statistical from nonstatistical sampling and attribute from variable sampling, then select the right approach for four scenarios
Compute sample size, projected error, and upper deviation rate for simple attribute sampling cases
Build a risk-and-control matrix that links each assertion to at least one specific test procedure
Your checkpoint
A ten-item sampling computation set with worked solutions and a written justification of the sampling method chosen in each case
Engagement Planning & Engagement Execution
Evaluate sample workpapers against documentation standards and list the specific deficiencies found
Distinguish engagement supervision and review responsibilities, including who reviews what and when
Interpret data analytics output and convert it into a defensible engagement conclusion
Complete a 60-question timed exam mixing Planning and Execution content
Your checkpoint
A timed 60-question Planning/Execution exam scored at 70% or higher, plus a written list of your top five recurring error themes
Engagement Communication
Identify the required elements of an engagement report and test a draft against the report-quality criteria
Distinguish the situations that require interim or verbal communication from those that do not
Draft complete findings statements using criteria, condition, cause, effect, and recommendation for four scenarios
Rank competing recommendations and evaluate whether each addresses root cause rather than symptom
Your checkpoint
Two full draft reports, one carrying an unfavorable conclusion, each scored against a self-built report-quality checklist
Engagement Monitoring
Sequence monitoring and follow-up procedures, including the escalation path for unresolved findings and accepted risks
Decide who receives follow-up results and when, citing the applicable standards for each decision
Determine whether a separate follow-up engagement is warranted and design its scope and objectives
Solve 25 scenario questions on monitoring, follow-up, and risk acceptance communication
Your checkpoint
A follow-up tracking template plus written decisions, with standard citations, on four escalation and risk-acceptance scenarios
Engagement Communication & Engagement Monitoring
Diagnose your weakest subtopics from Weeks 1 through 6 and re-drill 40 targeted questions in those areas
Condense each domain onto a single-page summary sheet of decision rules and standard triggers
Narrate the full engagement lifecycle from planning through follow-up without notes
Retake every section quiz previously scored below 80% and clear that threshold
Your checkpoint
Four one-page domain summary sheets and all section quiz scores at or above 80%
Engagement Planning & Engagement Execution & Engagement Communication & Engagement Monitoring
Complete two full-length mock exams under timed, closed-book conditions
Analyze both mocks by domain and lift overall performance to 75% with no domain below 65%
Re-work every missed question until you can state the reasoning and the governing standard aloud
Rehearse pacing at roughly 1.2 minutes per question across both sessions
Your checkpoint
A scored result for each full mock plus a one-page remediation log showing a final mock score of 75% or higher
Milestones
Week 2: Planning is mapped end to end: a planning memo and 12-step work program exist, and the planning question set scores at least 80%
Week 4: Mid-plan checkpoint: timed 60-question Planning/Execution exam at 70% or higher with error themes documented
Week 6: Reporting and monitoring covered: two draft reports produced and escalation decisions documented with standard citations
Week 7: All four domains summarized and every section quiz at or above 80% before attempting full mocks
Week 8: Exam readiness: two timed full mocks completed, final score at least 75% overall and no domain below 65%