CLC Certification: Lean Fundamentals and the Value Stream

  • Value = what the customer will pay for; every step that does not change form, fit, or function of the product for the customer is non-value-added (waste).

  • The three value-stream activities: value-added, necessary non-value-added (Type 1 muda), and pure waste (Type 2 muda); only Type 1 is tolerated short term.

  • The eight wastes (TIMWOODS): Transport, Inventory, Motion, Waiting, Overproduction, Overprocessing, Defects, Skills underutilized.

  • Takt time = available production time / customer demand; it sets the pace, not the cycle time of any single machine.

  • Cycle time = time between one unit leaving a process and the next unit leaving; compare to takt to find the constraint.

  • Lead time = total time a unit spends in the value stream, including queue and wait; Little's Law: Lead time = WIP / Throughput.

  • Flow efficiency = value-added time / total lead time; a typical batch value stream runs below 5%.

  • Process cycle efficiency and percent value-added are computed from the same ratio and are often used interchangeably in lean audits.

Quick reference

CLC Certification: Value Stream Mapping and Analysis

  • A current-state map records customer demand, supplier, process boxes with cycle time, changeover time, uptime, and inventory triangles between boxes.

  • A future-state map is drawn to takt time, using continuous flow where possible, pull (supermarket/FIFO) where flow is impossible, and a pacemaker process.

  • Inventory days = inventory quantity / daily customer requirement; convert each triangle to days to compare queues on one scale.

  • Total lead time on a map = sum of inventory days plus sum of process cycle times; total value-added time = sum of value-added process times only.

  • The pacemaker is the most downstream continuous-flow process; it is scheduled and all upstream processes are pulled from it.

  • Kaizen bursts on a map mark improvement opportunities; each should have an owner, target condition, and due date.

  • A spaghetti diagram traces physical operator or material travel and exposes transport and motion waste a process box hides.

  • Map the door-to-door scope first; mapping a single department hides the interdepartmental waiting that dominates lead time.

Quick reference

CLC Certification: Flow, Pull, and Kanban Systems

  • Continuous flow means one-piece flow at takt; it is chosen when processes can be co-located and cycle times are balanced to takt.

  • Pull means a downstream process signals consumption upstream; the signal is a kanban card, empty container, or electronic trigger.

  • Kanban quantity = (average demand x replenishment lead time) + safety stock, divided by container quantity, rounded up.

  • A two-bin (kanban) system reorders when the first bin empties; reorder point = demand during lead time + safety stock.

  • A supermarket decouples a fast, unreliable upstream process from a downstream pacemaker; a FIFO lane decouples two processes with matched but unequal cycles.

  • WIP cap is the maximum cards in the loop; lowering the cap exposes problems but must not starve the pacemaker.

  • Heijunka (leveling) sequences product mix and volume over a fixed pitch; pitch = pack-out quantity x takt time.

  • A pacemaker interval (pitch) sets the frequency of withdrawal, not the frequency of production at every upstream process.

Quick reference

CLC Certification: Continuous Improvement and Kaizen Tools

  • PDCA: Plan (target condition and current condition), Do (trial), Check (measure against target), Act (standardize or re-plan).

  • A3 problem solving: background, current condition, target condition, root cause analysis, countermeasures, plan, follow-up on one page.

  • 5 Whys drives to a root cause; a good chain ends at a systemic cause the team can act on, not at 'operator error'.

  • Fishbone (Ishikawa) 6M categories: Man, Machine, Material, Method, Measurement, Mother Nature (environment).

  • Standard work has three elements: takt time, work sequence, and standard in-process stock; it is the baseline for all kaizen.

  • SMED separates internal from external setup; target is single-minute (under 10 minutes) exchange of dies.

  • TPM pillars include autonomous maintenance, planned maintenance, and focused improvement; OEE = Availability x Performance x Quality.

  • Kaizen is small, incremental, low-cost, and operator-led; kaikaku is radical redesign; both use the same PDCA discipline.

Quick reference

CLC Certification: Measurement, Metrics, and Leadership

  • OEE = Availability x Performance x Quality; world-class benchmark is often cited as 85%, with 90% availability, 95% performance, 99% quality.

  • Availability = run time / planned production time; Performance = (ideal cycle time x count) / run time; Quality = good count / total count.

  • First pass yield (FPY) = units passing first time / units entering; rolled throughput yield (RTY) = product of each step's FPY.

  • Dock-to-dock lead time and on-time delivery are customer-facing metrics; OEE and downtime are internal process metrics.

  • Lean leaders use gemba walks, ask open questions, and develop people through daily kaizen rather than command-and-control.

  • Resistance to change is addressed by involving operators in designing the new standard and by making the problem visible.

  • A value-stream manager owns the whole stream's flow and lead time, crossing functional department boundaries.

  • Visual management makes the standard and abnormal condition visible at a glance; an andon signals abnormality for immediate response.

Quick reference

CLC Certification: Lean Culture and Implementation

  • Respect for people and continuous improvement are the two pillars of the Toyota Production System; neither works without the other.

  • Leaders go to the gemba (actual place) to see the actual process and the actual part, rather than reviewing reports.

  • Hoshin kanri cascades breakthrough objectives into annual plans and daily management; catchball is the two-way negotiation of targets.

  • Daily management uses tiered accountability: team huddle, value-stream review, and plant review at defined intervals.

  • Lean transformation sequence: purpose and value, value stream map, flow, pull, perfection; skipping flow and jumping to pull fails.

  • A pilot value stream proves the model before expansion; scaling requires standard work, training within industry, and leader standard work.

  • Sustainment requires audit of the process (layered process audits) and of leader behaviors (leader standard work), not just results.

  • The biggest failure mode is treating lean as a toolbox of events; tools without a management system revert within months.