Registered Civil Engineer (Port & Waterway) study materials
Registered Civil Engineer (Port & Waterway) study resources

Registered Civil Engineer (Port & Waterway) study plan

Registered Civil Engineer (Port & Waterway) · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Coastal and estuarine hydrodynamics, waves, tides, and sediment transport & Port layout, berths, and waterfront structural design

  • Derive and apply linear wave theory relations (dispersion, celerity, shoaling, refraction) to at least 10 numerical problems without notes

  • Compute design wave heights using extreme-value fitting (Gumbel/Weibull) on a synthetic 30-year record and justify return period selection

  • Calculate berth occupancy, throughput capacity, and required number of berths from vessel arrival and service-time distributions

  • Sketch a typical cross-section of a gravity quay wall and a pile-supported wharf, labeling all load paths and design water levels

Your checkpoint

A 10-page formula sheet plus worked solutions covering wave transformation and berth capacity, scored against a self-made answer key (target ≥80%)

Week 2

Coastal and estuarine hydrodynamics, waves, tides, and sediment transport & Port layout, berths, and waterfront structural design

  • Compute longshore sediment transport rates using the CERC formula and evaluate shoreline change with a one-line model

  • Size armor units for a rubble-mound breakwater using the Hudson and van der Meer formulae, comparing both results

  • Determine wave loads on a vertical breakwater using Goda's method and check sliding and overturning stability

  • Select fender and mooring system capacities for a given vessel size and berthing velocity

Your checkpoint

A complete breakwater and quay design calculation package (loads, stability factors of safety, armor sizing) for one worked site scenario

Week 3

Geotechnical engineering for marine and waterfront structures & Navigation structures: breakwaters, locks, and ship lifts

  • Interpret a marine borehole log and CPT profile to derive design soil parameters for a quay wall foundation

  • Evaluate liquefaction potential and cyclic strength for a reclaimed sand fill under design earthquake loading

  • Compute axial and lateral capacity of driven steel pipe piles using an approved static formula and compare with dynamic test interpretation

  • Design a rubble-mound breakwater crest level and armor gradation to satisfy overtopping and stability criteria

Your checkpoint

A geotechnical design memorandum with parameter selection tables, pile capacity calculations, and a liquefaction assessment summary

Week 4

Dredging, reclamation, and channel and basin design & Port and waterway planning, hydrology, and site investigation

  • Size a dredged navigation channel (depth, width, bend radius) using vessel squat, keel clearance, and maneuvering lane allowances

  • Estimate dredging production rates and costs for a cutter suction dredger given soil type, pipeline length, and working hours

  • Design a reclamation fill sequence including consolidation settlement estimates and surcharge staging

  • Assemble a site investigation program (bathymetry, geophysics, boreholes, metocean) matched to a stated project type and budget

Your checkpoint

A channel and reclamation design report with a costed dredging plan and a site investigation scope table

Week 5

Navigation structures: breakwaters, locks, and ship lifts & Inland waterway engineering and river regulation

  • Design a lock chamber layout including filling/emptying system hydraulics and lockage time calculation

  • Compute head loss and flow capacity for a navigation channel with a lock and weir, and evaluate ship lift versus lock alternatives

  • Apply river regulation principles to design a training wall and groyne layout for a navigable reach

  • Calculate bed degradation and stable channel dimensions downstream of a dam using regime and threshold theories

Your checkpoint

A lock and river regulation design brief comparing two navigation structure alternatives with quantified lockage times and cost indicators

Week 6

Construction methods, marine equipment, and project management & Codes, standards, safety, and environmental protection

  • Select marine construction plant (dredgers, crane barges, piling rigs) for three given work packages and justify each choice with cycle-time calculations

  • Build a critical path schedule for a phased marine works project including weather downtime allowances

  • Map environmental protection requirements (dredging disposal, turbidity control, EIA commitments) to specific construction activities

  • Identify the governing code clauses for breakwater, quay wall, and dredging design from the applicable national and international standards

Your checkpoint

A construction methodology and compliance matrix linking each major activity to plant, schedule duration, and the governing code or environmental requirement

Week 7

Engineering economics and professional practice & Port and waterway planning, hydrology, and site investigation

  • Perform a present-worth and benefit-cost comparison of two port expansion options including O&M and residual value

  • Compute unit rates and a bill of quantities for a dredging and reclamation package

  • Draft a risk register for a marine project covering geotechnical, metocean, and contractual risks with mitigation actions

  • Explain professional and ethical obligations in reviewing and certifying another engineer's marine design calculations

Your checkpoint

An economic appraisal and risk register for a port expansion case, with a clear recommendation and stated assumptions

Week 8

Coastal and estuarine hydrodynamics, waves, tides, and sediment transport & Geotechnical engineering for marine and waterfront structures & Port layout, berths, and waterfront structural design & Dredging, reclamation, and channel and basin design & Navigation structures: breakwaters, locks, and ship lifts & Inland waterway engineering and river regulation & Construction methods, marine equipment, and project management & Codes, standards, safety, and environmental protection & Engineering economics and professional practice

  • Complete two full-length timed mock exams under exam conditions and score each by domain

  • Re-work every missed question to identify the underlying concept gap rather than the arithmetic error

  • Consolidate the formula sheet into a one-page quick-reference for each domain

  • Rehearse written-answer structure for design-type questions within time limits

Your checkpoint

Two scored mock exams with a remediation log and a final one-page-per-domain quick-reference set

Milestones

Week 2: Score ≥75% on a self-made 20-question quiz covering wave transformation, sediment transport, breakwater loads, and berth capacity; if below, repeat weeks 1-2 calculation sets before proceeding

Week 4: Produce a complete channel, dredging, and reclamation design package unaided in under 3 hours, and pass a 15-question quiz on site investigation and hydrology at ≥75%

Week 6: Score ≥70% on a 25-question mixed quiz across domains 6-9, and demonstrate a construction schedule with realistic weather downtime and a completed compliance matrix

Week 8: Average ≥70% across two full mock exams with no single domain below 60%; otherwise schedule targeted re-study of the weakest two domains before the exam