Registered Public Utility Engineer - Power case studies
Registered Public Utility Engineer - Power · Put your knowledge to work in context.
The Registered Public Utility Engineer - Power credential is a professional certification for engineers whose work sits at the intersection of power system engineering and utility regulation: transmission and distribution planning, generation and interconnection studies, cost-of-service analysis, tariff design, reliability compliance, and the public-interest duties that come with operating regulated infrastructure. It suits utility engineers, consultant and ISO/RTO staff, regulatory analysts with an engineering background, and developers who need to defend projects before a commission. The Registered Public Utility Engineer - Power case studies are 5 cases and about 2,868 words.
1Five-Year Peak Forecast with Behind-the-Meter PV, EVs, and a Data Center
An integrated utility serves a summer-peaking system. Its weather-normalized peak for the most recent year was 2,850 MW; a 1-in-10 weather adjustment adds 4%.
652 words, about 3 min2Inverter-Based Resource Ride-Through and Recloser Coordination
A 69 kV substation feeds a 12.47 kV feeder with 6 MW of rooftop PV and a 20 MW solar farm connected through a dedicated 12.47 kV collector. The feeder recloser uses fuse-saving: instantaneous trip on phase faults, with two reclose attempts.
543 words, about 3 min3Cost-of-Service Rate Case with Declining Sales and a Bypass Threat
An electric utility files a general rate case requesting a 48 million revenue increase. Billing determinants have fallen 2% per year for three years as rooftop PV and efficiency reduce sales, while peak demand has grown 1.5%.
553 words, about 3 min4Routing a 345 kV Collector for 800 MW Wind
A developer proposes an 800 MW wind farm in a rural region. The point of interconnection is a 345 kV substation 60 miles away.
574 words, about 3 min5Condition-Based Replacement of a Critical 138/69 kV Transformer
A utility owns 12 138/69 kV transformers. Unit T-7 is 45 MVA, 48 years old, and carries 38 MW at summer peak, about 90% of its forced-cooled rating.
546 words, about 3 min