Registered Ship Surveyor study materials
Registered Ship Surveyor study resources

Registered Ship Surveyor study plan

Registered Ship Surveyor · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

International maritime conventions and national regulations & Ship stability, subdivision and load lines

  • Map the IMO instrument set (SOLAS, MARPOL, LL 1966/88, COLREG, STCW, Tonnage, BWM, AFS, Load Line Protocol) to the survey tasks each one drives, and write a one-line trigger for every certificate involved

  • Build a personal timeline of convention entry-into-force and amendment dates that a surveyor must know to judge whether a ship's certificates and manuals are current on the survey date

  • Distinguish flag State, port State and recognised organisation responsibilities, and state in writing who issues each statutory certificate and who endorses it

  • Apply load line assignment rules to two worked hull examples: compute freeboard, tabular freeboard corrections, and verify assigned marks against the certificate

Your checkpoint

A one-page convention-to-certificate matrix plus two fully worked load line freeboard calculations with the corrections annotated

Week 2

International maritime conventions and national regulations & Survey procedures, inspection techniques and reporting

  • Draft a survey checklist derived from SOLAS Chapter I survey types (initial, annual, intermediate, renewal) and the harmonised survey system, listing what must be examined at each

  • Explain the ISM/ISPS audit interface with class and statutory surveys and describe how a deficiency is graded, recorded and closed out

  • Write the sequence of a statutory survey from pre-arrival document review through onboard inspection to certificate issue, naming the records a surveyor must retain

  • Practise writing three non-conformity statements in measurable, evidence-based language without opinion or speculation

Your checkpoint

A complete mock annual survey report for a 12-year-old general cargo ship, including document review notes, findings and three correctly worded deficiencies

Week 3

Ship construction, hull structure and strength

  • Describe the structural role of keel, floors, girders, longitudinals, transverse frames, brackets and pillars, and explain how load paths change when one member is wasted or cracked

  • Interpret a midship section drawing: identify primary and secondary members and state the stress each carries (still water bending, wave bending, shear, torsion)

  • Explain buckling, fatigue and brittle fracture mechanisms and the structural details that concentrate stress, including hatch corners and openings

  • Apply a corrosion allowance and wastage assessment to a plate and a stiffener, deciding when renewal or repair is required

Your checkpoint

An annotated midship section showing load paths and three realistic defect scenarios with the surveyor's decision on each

Week 4

Ship construction, hull structure and strength & Materials, welding and non-destructive testing

  • Explain welding procedure qualification and welder qualification, and state what a surveyor checks before accepting production welding

  • Identify the common weld defects (porosity, slag, lack of fusion, undercut, cracking) and match each to the NDT method most likely to reveal it

  • State the capability and limitations of visual, radiographic, ultrasonic, magnetic particle and dye penetrant testing, and justify method selection for a given joint

  • Explain material traceability, mill certificates and the acceptance criteria a surveyor applies to a hull repair

Your checkpoint

A defect-to-NDT comparison table with method selection justified for five named joints, plus a written weld acceptance decision on a supplied repair scenario

Week 5

Ship stability, subdivision and load lines

  • Compute intact stability parameters from a hydrostatic table: displacement, KG, GM, righting lever curve and the area criteria under the applicable stability instrument

  • Explain free surface effect, and calculate the loss of GM for a partly filled tank

  • Explain damage stability and subdivision requirements, including the probabilistic framework, and describe the information a surveyor verifies in the loading computer and stability booklet

  • Test a stability booklet against a loading condition to confirm the approved document matches the ship's actual configuration

Your checkpoint

A worked stability calculation for one loading condition with GM, righting lever curve and criteria checked, plus a written list of stability booklet discrepancies

Week 6

Safety equipment, fire protection and life-saving appliances & Machinery, propulsion and auxiliary systems

  • Explain fire detection and extinction systems by space type, and state the inspection points a surveyor checks on a fixed CO2 or water mist system

  • Verify life-saving appliance requirements by ship type and describe the inspection and servicing intervals for lifeboats, davits, liferafts and immersion suits

  • Describe the machinery survey regime: main propulsion, steering gear, auxiliary systems, and the tests and trials a surveyor witnesses

  • Explain the purpose and inspection of the safety management link between machinery defects and reporting, including the effect of a machinery failure on the ship's certificates

Your checkpoint

A combined fire and life-saving survey checklist plus a written account of a witnessed steering gear trial with the acceptance points recorded

Week 7

Electrical, control and automation systems & Survey procedures, inspection techniques and reporting

  • Explain the inspection of main switchboard, generators, emergency source of power and its changeover, and the tests a surveyor requires

  • Describe automation and alarm systems, including the unattended machinery space notation and the alarms and safety interlocks a surveyor verifies

  • Explain how electrical and automation findings are graded and recorded, and when a defect becomes a condition of class or a statutory deficiency

  • Design a practical onboard inspection route that covers the survey scope efficiently without missing required items

Your checkpoint

A written emergency generator and switchboard test record with findings graded, plus a timed inspection route plan for a two-day annual survey

Week 8

Professional ethics, liability and surveyor conduct & International maritime conventions and national regulations

  • Explain the surveyor's duty of care, independence and confidentiality, and describe the conflicts of interest a surveyor must declare

  • Describe the surveyor's liability position: what is covered by professional indemnity, what is excluded, and how contemporaneous records support a defence

  • State the ethical response to pressure to pass a substandard item, including escalation and documentation

  • Consolidate the whole syllabus by re-testing the weakest domain and re-reading the convention-to-certificate matrix from week 1

Your checkpoint

A one-page professional conduct and liability summary plus a timed 40-question self-test scored against a written target, with weak areas listed for further study

Milestones

Week 2: Can name the survey types, their intervals and the certificate each one supports without notes

Week 4: Can select the correct NDT method for a named weld defect and state its limitation in one sentence

Week 6: Can compute GM and check the righting lever area criteria from a hydrostatic table in under 30 minutes

Week 8: Scores at least 75% on the 40-question self-test, with no domain below 60%