- Disturbance threshold for CGP
- Construction General Permit coverage is generally required when earth-disturbing activity disturbs one acre or more, or less than one acre if part of a common plan totaling one acre or more.
- SWPPP purpose
- A Stormwater Pollution Prevention Plan identifies potential pollutant sources and specifies the best management practices, inspection schedules, and maintenance procedures used to prevent stormwater contamination at a site.
- Construction inspection frequency
- Sites must be inspected at least every seven calendar days, or every 14 calendar days with an additional inspection within 24 hours after a storm event producing 0.25 inches or more of rain.
- Site stabilization deadline
- Disturbed areas must be stabilized as soon as practicable, but no later than 14 days after construction activity has permanently ceased on that portion of the site.
- Concrete washout requirements
- Washout water from concrete operations is a prohibited non-stormwater discharge and must be contained in a lined, designated pit or container that is never connected to the storm drain system.
- Notice of Termination construction
- The NOT is submitted when all disturbed areas have been finally stabilized, all temporary controls removed, and no further construction stormwater discharges occur from the site.
- Erosion vs sediment control
- Erosion controls prevent soil from being detached, such as mulching and seeding, while sediment controls trap soil already mobilized, such as silt fence and sediment basins.
- Construction record retention
- The SWPPP and inspection records must generally be retained for at least three years after permit termination and be made available to the permitting authority upon request.
- Phase I MS4 definition
- Phase I municipal separate storm sewer systems serve populations of 100,000 or more and are regulated under individual NPDES permits with specific program requirements.
- Phase II MS4 definition
- Phase II covers regulated small MS4s located in urbanized areas or designated by the permitting authority, generally operating under a general permit with six minimum control measures.
- Six minimum control measures
- Small MS4 programs must address public education, public participation, illicit discharge detection, construction runoff control, post-construction runoff control, and municipal pollution prevention and good housekeeping.
- Illicit discharge detection program
- The IDDE program requires a storm sewer system map, a regulatory mechanism prohibiting illicit discharges, and procedures to trace and eliminate non-stormwater entries into the system.
- Maximum extent practicable
- MEP is the statutory standard for MS4 stormwater programs, requiring controls that reduce pollutants to the maximum extent practicable using available technologies, funding, and resources.
- Post-construction stormwater controls
- New development and redevelopment must use structural and non-structural BMPs to manage runoff volume, rate, and pollutant loads, often meeting numeric retention or treatment criteria.
- TMDL wasteload allocation
- A TMDL assigns a wasteload allocation to point sources, including MS4s, which must implement BMPs and measurable milestones to meet the assigned pollutant load reduction.
- Municipal good housekeeping
- This minimum measure covers municipal operations such as street sweeping, catch basin cleaning, vehicle maintenance, and employee training to prevent stormwater pollution from government activities.
- MS4 annual report contents
- Annual reports typically document BMP implementation status, measurable goals achieved, monitoring results, and progress toward compliance deadlines specified in the permit.
- Urbanized area designation
- The Census Bureau defines urbanized areas with populations of 50,000 or more; small MS4s within these boundaries are automatically regulated under Phase II.
- Storm sewer system map
- An MS4 must maintain a map showing outfalls, receiving waters, and the storm sewer system, used to support illicit discharge detection and program planning.
- Industrial activity definition
- Stormwater associated with industrial activity includes discharges from facilities in regulated sectors identified by SIC codes, such as manufacturing, mining, and transportation.
- Industrial SWPPP contents
- An industrial SWPPP includes a facility description, site map, inventory of exposed materials, list of significant spills, description of controls, and monitoring and inspection procedures.
- BAT and BCT standards
- Industrial permits require Best Available Technology Economically Achievable and Best Conventional Pollutant Control Technology, plus numeric limits where TMDLs or state standards apply.
- Quarterly visual inspection
- Industrial facilities typically conduct quarterly visual inspections of stormwater discharges and associated BMPs, documenting observations and any needed corrective actions.
- Annual comprehensive site evaluation
- Once a year the facility must conduct a comprehensive evaluation of the SWPPP and site conditions, documenting findings and revising the plan where deficiencies are found.
- Benchmark exceedance response
- When monitoring exceeds a benchmark value, the facility must investigate the cause, implement additional BMPs, and document the corrective action and follow-up monitoring in the SWPPP.
- Notice of Intent industrial
- An NOI is submitted to obtain coverage under a general industrial stormwater permit, certifying eligibility and identifying the facility, outfalls, and receiving waters.
- Notice of Termination industrial
- An NOT is submitted when industrial activity ceases or stormwater discharges are eliminated, ending permit coverage and further monitoring obligations.
- Non-stormwater discharge elimination
- Industrial facilities must identify and eliminate non-stormwater discharges to storm drains; authorized discharges must be listed in the SWPPP and covered by separate permits where required.
- Exposed materials inventory
- The SWPPP must list significant materials exposed to precipitation, including their quantities, storage locations, and potential for contributing pollutants to stormwater runoff.
- Significant spill history
- The SWPPP must document significant spills of oil or hazardous substances that occurred at the facility in the three years before permit coverage, along with response actions taken.
- Responsible corporate officer
- The SWPPP and permit reports must be signed and certified by a responsible corporate officer or duly authorized representative who attests to their accuracy.
- Stormwater discharge monitoring
- Industrial permits often require sampling of stormwater discharges for parameters such as total suspended solids, pH, and sector-specific pollutants, with results reported to the permitting authority.