CPSWQ · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Construction stormwater program

  • Map the construction stormwater regulatory framework: identify the federal Construction General Permit structure, the state-delegation model, and where local ordinances layer on top, writing a one-page hierarchy diagram from memory.

  • List every Construction General Permit eligibility criterion and the conditions that trigger a Notice of Intent, then explain in writing why each threshold exists.

  • Define the roles of owner, operator, contractor, and qualified personnel on a construction site, and write a short scenario describing who signs what and when.

  • Build a personal glossary of 30 construction stormwater terms (NOI, NOT, SWPPP, CGP, TMDL, impaired waters, effluent limits) with a plain-language definition for each.

Your checkpoint

A one-page regulatory hierarchy diagram plus a 30-term glossary, self-quizzed until you can reproduce the hierarchy without notes.

Week 2

Construction stormwater program

  • Draft a complete SWPPP outline for a hypothetical 12-acre residential subdivision, including site description, anticipated pollutants, and receiving-water identification.

  • Select and justify best management practices for erosion control, sediment control, and pollution prevention, matching each BMP to the pollutant it targets.

  • Write the inspection and maintenance schedule a permit requires, including who inspects, how often, what triggers a corrective action, and the documentation trail.

  • Explain the difference between erosion control and sediment control using three concrete examples of each, and note which is preferred and why.

Your checkpoint

A full SWPPP outline for the hypothetical subdivision with BMP selection table and inspection schedule, reviewed against permit requirements.

Week 3

Municipal stormwater program

  • Map the municipal separate storm sewer system permit structure, including the six minimum control measures and what each one actually requires an operator to do.

  • Describe the permitting pathways for small municipal separate storm sewer systems and how designation or waiver decisions are made.

  • Explain total maximum daily load requirements and how an approved plan changes what a municipal program must do beyond the baseline minimum measures.

  • Outline the components of a stormwater management program document and the annual reporting cycle that supports it.

Your checkpoint

A comparison table of all six minimum control measures with required elements, typical measurable goals, and one example of acceptable documentation for each.

Week 4

Municipal stormwater program

  • Design a public education and outreach campaign outline for a mid-size municipality, naming audiences, messages, channels, and a way to measure reach.

  • Draft a public involvement and participation plan that identifies at least three mechanisms and how comments feed back into program decisions.

  • Write an illicit discharge detection and elimination procedure covering legal authority, mapping, screening outfalls, tracing, and removal timelines.

  • Explain construction and post-construction runoff control requirements a municipality must enforce on private development, including plan review and inspection authority.

Your checkpoint

A four-part municipal program package (outreach, involvement, illicit discharge procedure, development review process) totaling roughly 1,500 words.

Week 5

Municipal stormwater program & Industrial stormwater program

  • Describe municipal good housekeeping and pollution prevention requirements for roads, parks, fleet yards, and maintenance facilities, listing the operational controls for each.

  • Explain the industrial stormwater permit structure: who needs coverage, how applicability is determined by sector, and how a Notice of Intent is submitted.

  • Compare the exposure-based and traditional sector-based approaches to industrial permitting and state when each applies.

  • Identify the 11 categories of industrial activity and match at least eight to a representative sector with its typical pollutants.

Your checkpoint

A two-column reference sheet: municipal good housekeeping controls on one side, industrial permit applicability and sector pollutants on the other, quizzed to recall.

Week 6

Industrial stormwater program

  • Draft a Stormwater Pollution Prevention Team structure and a facility evaluation section for a hypothetical metal fabrication plant.

  • Conduct a written exposure assessment: identify industrial materials, activities, and locations that could contact stormwater, and classify each as exposed or protected.

  • Select control measures for each identified exposure and justify the selection using the facility's pollutant profile.

  • Explain the difference between stormwater pollution prevention plan requirements for construction versus industrial facilities, listing at least five distinct points.

Your checkpoint

A complete industrial Stormwater Pollution Prevention Plan outline for the metal fabrication plant, including team, exposure assessment, and control measure justification.

Week 7

Industrial stormwater program

  • Write the monitoring and sampling procedure for an industrial facility: outfall identification, sample collection methods, holding times, and chain of custody.

  • Interpret benchmark values versus numeric effluent limits and explain what a facility must do when a result exceeds either.

  • Describe corrective action and follow-up requirements, including the triggers, the timeline, and the documentation expected.

  • Explain visual assessment requirements and how they interact with analytical monitoring results.

Your checkpoint

A monitoring plan with a worked example: given three hypothetical sampling results, write the exceedance response and corrective action narrative for each.

Week 8

Construction stormwater program & Municipal stormwater program & Industrial stormwater program

  • Complete 120 mixed practice questions across all three domains under timed conditions, then classify every miss by domain and by failure mode (knowledge gap, misread, or reasoning error).

  • Re-study only the two weakest subareas identified by the practice results, rewriting the relevant reference sheet from memory.

  • Recite the key numeric thresholds, timelines, and reporting deadlines from all three programs from memory without notes.

  • Build a one-page final review sheet that ties construction, municipal, and industrial requirements together by shared theme: permits, plans, inspections, monitoring, and reporting.

Your checkpoint

A scored 120-question timed practice set with a written error analysis and a final one-page cross-domain review sheet.

Milestones

Week 2: Can you outline a construction SWPPP from blank paper, naming the required elements and the inspection cadence, in under 15 minutes?

Week 4: Can you name all six municipal minimum control measures and give one measurable goal and one documentation example for each without notes?

Week 6: Can you explain industrial permit applicability, the exposure assessment logic, and control measure selection for a new facility in a five-minute spoken answer?