CRE study materials
CRE study resources

CRE (ASQ) cheat sheet

CRE · Keep the key ideas within reach.

Quick reference

Reliability Engineering Fundamentals

  • Reliability R(t) is the probability a unit performs its required function without failure for a stated time under stated conditions; it is a probability, so 0 <= R(t) <= 1.

  • Failure rate lambda(t) = f(t)/R(t); hazard function relates density and survival, and F(t) = 1 - R(t).

  • Exponential model: R(t) = exp(-lambda*t), constant failure rate, MTBF = 1/lambda, and memoryless property.

  • Weibull reliability: R(t) = exp(-(t/eta)^beta); beta < 1 infant mortality, beta = 1 random, beta > 1 wear-out.

  • Bathtub curve phases: decreasing failure rate (infant mortality), constant (useful life), increasing (wear-out).

  • Mean life for exponential equals MTBF; median life = MTBF * ln(2) = 0.693 * MTBF.

  • Series system reliability R_s = product of component reliabilities; system is only as strong as its weakest link.

  • Parallel (active redundancy) with n identical units: R_s = 1 - (1 - R)^n.

  • Availability A = MTBF / (MTBF + MTTR) for steady-state repairable systems.

Quick reference

Reliability Management and Leadership

  • Reliability program plan defines tasks, responsibilities, schedules, and deliverables tied to program phases and milestones.

  • Design reviews (preliminary, critical) are formal gates where reliability analyses and test results are evaluated against requirements.

  • FRACAS: closed-loop Failure Reporting, Analysis, and Corrective Action System tracks failures to verified corrective action.

  • Reliability growth tracking uses Duane model: cumulative MTBF = A * T^alpha, where alpha is growth slope.

  • Cost of poor reliability rises sharply later in the life cycle; failures found in design are cheapest to correct.

  • Reliability requirements must be quantitative, measurable, and traceable to customer and mission needs.

  • Supplier reliability management includes specifications, qualification testing, and data requirements in contracts.

  • Reliability metrics include MTBF, failure rate, mission reliability, and probability of success.

Quick reference

Design and Development for Reliability

  • Derating applies components below rated stress (power, voltage, temperature) to reduce failure rate and extend life.

  • Redundancy types: active (parallel, all powered) vs standby (switched); standby needs a reliable switch and monitor.

  • FMEA ranks severity, occurrence, detection; RPN = S * O * D; high severity items require action regardless of RPN.

  • Fault tree analysis is top-down deductive logic using AND/OR gates to model causes of an undesired top event.

  • Robust design (Taguchi) reduces sensitivity to noise factors using parameter design and orthogonal arrays.

  • Thermal management and stress-strength interference: failure occurs when stress exceeds strength distribution.

  • Design for reliability includes parts selection, derating, redundancy, and environmental protection.

  • Reliability allocation distributes system reliability targets to subsystems by complexity or criticality weighting.

Quick reference

Reliability Modeling and Prediction

  • Parts count prediction: system failure rate = sum of part failure rates times quality and environment factors.

  • Parts stress prediction applies stress factors to base failure rates for each component category.

  • Series RBD: R_s = product of R_i; parallel RBD: R_s = 1 - product of (1 - R_i).

  • k-out-of-n system reliability uses the binomial sum of terms C(n,i) R^i (1-R)^(n-i) for i = k to n.

  • Markov models use state transition rates (lambda, mu) to compute state probabilities and availability.

  • Reliability block diagram is success-oriented; fault tree is failure-oriented.

  • MTBF predictions from MIL-HDBK-217 style models use base failure rate times pi factors for stress, temperature, quality.

  • Monte Carlo simulation estimates system reliability when closed-form solutions are intractable.

Quick reference

Reliability Testing and Data Analysis

  • Type I (producer's risk alpha) rejects good lot; Type II (consumer's risk beta) accepts bad lot.

  • OC curve plots probability of acceptance vs lot fraction defective; steeper curve means better discrimination.

  • Weibull probability plot: straight line indicates Weibull fit; slope estimates beta, intercept estimates eta.

  • Maximum likelihood estimation gives point estimates of parameters; confidence intervals quantify uncertainty.

  • Accelerated life testing uses Arrhenius (temperature) or inverse power law (voltage) models to extrapolate life.

  • Reliability demonstration test sample size depends on required MTBF, discrimination ratio, and risk levels.

  • Censored data (suspended items) must be included in life data analysis to avoid bias.

  • Goodness-of-fit (Anderson-Darling, chi-square) tests whether a distribution adequately models the data.

Quick reference

Maintainability, Maintenance, and Availability

  • Maintainability M(t) = probability a failed unit is restored within time t; MTTR is its mean.

  • Inherent availability A_i = MTBF / (MTBF + MTTR); operational availability includes logistics and admin delay.

  • Preventive maintenance intervals balance failure cost against maintenance cost; too frequent PM can increase failures.

  • Maintenance strategies: corrective, preventive, predictive (condition-based), and reliability-centered maintenance.

  • RCM selects maintenance tasks by failure consequence and mode: condition-based, scheduled, redesign, or run-to-failure.

  • Repairable system metrics include MTBF, MTTR, and mean downtime; availability is a function of both.

  • Spare parts provisioning affects operational availability through logistics delay time.

  • Maintainability design features: accessibility, modularity, diagnostics, and standardized fasteners.

Quick reference

Safety, Risk, and Failure Analysis

  • Risk = probability of occurrence * severity of consequence; risk ranking prioritizes mitigation.

  • Hazard analysis identifies energy sources and unsafe conditions before failures occur.

  • FMEA severity scale is 1-10; detection and occurrence also 1-10; RPN ranges 1-1000.

  • Fault tree minimal cut sets identify single points of failure; a cut set of order one is a critical single point.

  • Safety integrity levels (SIL) map to target probability of failure on demand ranges.

  • Common cause failure defeats redundancy; design diversity and physical separation reduce it.

  • Risk matrix plots likelihood vs consequence to classify risk as acceptable, tolerable, or unacceptable.

  • Pareto analysis prioritizes the vital few failure modes that account for most failures or cost.