CRISC flashcards
CRISC · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Risk appetite
- The amount and type of risk an organization is willing to accept in pursuit of its objectives, set by the board and expressed qualitatively or quantitatively.
- Risk tolerance
- The acceptable variation or deviation from the stated risk appetite that an organization can absorb for a specific objective before corrective action is required.
- Three lines model
- A governance structure in which operational management owns and manages risk, a risk and compliance function provides oversight, and internal audit gives independent assurance to the board.
- IT governance
- The processes and structures that direct and control IT so it aligns with enterprise strategy, delivers value, and manages technology risk within the approved appetite.
- COBIT framework
- ISACA's framework for governance and management of enterprise IT, providing objectives, processes, and maturity models that link IT activity to stakeholder value.
- Key risk indicator
- A forward-looking metric with defined thresholds that gives early warning that a risk exposure is increasing or approaching an unacceptable level.
- Risk owner
- The individual with accountability and authority to manage a specific risk, including selecting, funding, and monitoring the chosen risk response.
- Segregation of duties
- Dividing incompatible tasks among different people so that no single individual can both initiate and conceal an error or a fraudulent transaction.
- Inherent risk
- The level of risk before any controls or mitigation actions are applied, representing the raw exposure of a process or asset to a threat.
- Residual risk
- The risk remaining after existing controls have been applied and evaluated; it is compared with risk appetite to decide whether further treatment is needed.
- Single loss expectancy
- The monetary loss expected from a single risk event, calculated as the asset value multiplied by the exposure factor for that event.
- Annualized loss expectancy
- The expected yearly loss from a risk, calculated by multiplying the single loss expectancy by the annualized rate of occurrence for the event.
- Business impact analysis
- An analysis identifying critical business processes and the time-based impact of their disruption, producing recovery time and recovery point objectives.
- Risk register
- A repository recording each identified risk with its owner, likelihood, impact, score, response, status, and linked indicators or controls.
- Qualitative risk analysis
- Ranking risks using descriptive ordinal scales such as high, medium, and low, based on judgment and experience rather than monetary valuation.
- Control testing
- Evaluating whether a control is designed effectively and operating as intended, typically through inquiry, observation, inspection, and sample-based re-performance.
- Risk treatment options
- The responses available for a risk: mitigate, transfer, avoid, accept, and exploit, each chosen according to cost, feasibility, and alignment with risk appetite.
- Risk transfer
- Shifting the financial consequences of a risk to a third party, for example through insurance or outsourcing, without eliminating the underlying risk event.
- Risk avoidance
- Eliminating the activity or asset that gives rise to a risk, removing the exposure entirely while also forgoing the associated business benefit.
- Control cost-benefit
- The principle that a control is justified only when its cost is less than the expected reduction in loss that the control produces.
- Preventive control
- A control that stops an undesirable event from occurring, such as access restrictions, input validation, or separation of incompatible duties.
- Detective control
- A control that identifies an undesirable event after it has occurred, such as log review, account reconciliation, or intrusion detection monitoring.
- Risk escalation
- The process of raising a risk to higher management or the board when residual risk exceeds appetite or requires decisions beyond the risk owner's authority.
- Issue versus risk
- An issue is a present problem requiring remediation and tracked to closure, whereas a risk is a potential future event tracked to acceptance or treatment.
- CIA triad
- The three core security objectives: confidentiality for authorized access only, integrity for accurate complete data, and availability for timely access when needed.
- Least privilege
- Granting users only the access rights required to perform their assigned job duties, limiting the damage that a compromised account can cause.
- Defense in depth
- Layering multiple independent controls across people, process, and technology so that the failure of one control does not expose the organization.
- Shared responsibility model
- The division of security duties in cloud computing, where the provider secures the cloud infrastructure and the customer secures data, identity, and configuration.
- Zero trust
- A security model that verifies every access request explicitly and grants least privilege, assuming no implicit trust based on network location.
- Recovery time objective
- The maximum acceptable time to restore a process or system after a disruption, derived from the business impact analysis of dependent processes.
- Digital signature
- A cryptographic mechanism using asymmetric keys that provides authentication, integrity, and non-repudiation for a message or transaction, but not confidentiality.
- IDS versus IPS
- An intrusion detection system monitors traffic and alerts on suspicious activity, while an intrusion prevention system sits inline and can block it.