CRISC study materials
CRISC study resources

CRISC study plan

CRISC · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Corporate IT Governance

  • Map each of the four CRISC domains to the governance, risk, and control activities it covers

  • Compare COBIT, ISO 31000, and NIST CSF on how each defines risk appetite, tolerance, and capacity

  • Explain the three-lines-of-defense model and assign one sample control to each line

  • Draft a risk appetite statement tied to business objectives for a fictional organization

Your checkpoint

One-page governance framework crosswalk table plus a 150-word risk appetite statement for a fictional company

Week 2

Corporate IT Governance & Risk Assessment

  • Identify and classify 15 business risks by category (strategic, operational, financial, compliance, reputational)

  • Build and calibrate a 5x5 likelihood-impact heat map with documented scoring criteria

  • Distinguish inherent, residual, and current risk and explain which one drives response decisions

  • Describe how enterprise risk management integrates with IT strategy setting

Your checkpoint

A risk register of 15 risks scored for inherent and residual likelihood and impact, with a written rationale for each score

Week 3

Risk Assessment

  • Construct risk scenarios by decomposing threat, vulnerability, asset, and consequence

  • Select an appropriate assessment technique (Delphi, scenario analysis, interview, checklist, quantitative modeling) for four given situations

  • Quantify a single risk using annualized loss expectancy and explain the assumptions behind each input

  • Evaluate how risk assessment results feed the risk register and risk profile

Your checkpoint

A scenario analysis document covering three business-process risk scenarios, including a full quantified ALE calculation for one

Week 4

Risk Assessment & Risk Response & Reporting

  • Evaluate mitigate, transfer, avoid, and accept options against cost, benefit, and residual exposure for 10 risks

  • Calculate the cost of a control versus the reduction in expected loss to justify a treatment decision

  • Assign risk owners and define treatment acceptance criteria and target dates

  • Draft escalation criteria that would move a risk out of tolerance to senior management

Your checkpoint

A risk treatment plan for 10 risks listing selected response, cost-benefit justification, risk owner, and target completion date

Week 5

Risk Response & Reporting

  • Design six key risk indicators with thresholds, data sources, and reporting frequency

  • Structure a risk report so that findings, exposure, and recommended actions are explicit

  • Differentiate the content and depth of risk reporting for board, executive, and operational audiences

  • Describe how risk reporting drives continuous improvement of the risk management program

Your checkpoint

A one-page executive risk dashboard with six KRIs, thresholds, RAG status, and a 200-word narrative written for a board audience

Week 6

Risk Response & Reporting & Technology and Security

  • Classify controls as preventive, detective, or corrective and map each to the risk it addresses

  • Design a control test (inquiry, observation, inspection, re-performance) for each control type

  • Explain how control design and operating effectiveness differ and why both must be assessed

  • Identify how control gaps surface through KRIs and incident reporting

Your checkpoint

A control matrix of 20 controls mapped to specific risks, control type, owner, and test method

Week 7

Technology and Security

  • Explain network segmentation, DMZ design, and boundary defense as risk-reduction controls

  • Compare authentication and authorization approaches, including MFA, SSO, and least privilege

  • Describe a data classification scheme and the handling controls each class requires

  • Assess technical risks in a cloud migration using shared responsibility and third-party risk concepts

Your checkpoint

A two-page technical risk brief on a hypothetical cloud migration identifying eight technical risks with mapped controls and residual exposure

Week 8

Corporate IT Governance & Risk Assessment & Risk Response & Reporting & Technology and Security

  • Synthesize cross-domain linkages by tracing one risk from governance appetite through assessment, response, reporting, and technical control

  • Complete two full-length timed practice exams under exam conditions

  • Re-drill every item on the accumulated weakness list until each is resolved

  • Write a one-page exam-day decision heuristic for choosing between closely worded answer options

Your checkpoint

A weakness list with zero unresolved items, plus two timed practice exam scores of 80 percent or higher

Milestones

Week 2: Score 80 percent or higher on a 30-question self-quiz limited to Domain 1 and the basics of Domain 2, and confirm the risk register is fully scored with rationales

Week 4: Score 75 percent or higher on a timed 50-question mixed set covering Domains 1, 2, and 3, logging every missed item to the weakness list

Week 6: Explain aloud, without notes, the difference between risk appetite, tolerance, and capacity, and how a KRI signals movement out of tolerance; score 80 percent or higher on a 40-question set weighted to Domains 3 and 4

Week 8: Two full-length timed practice exams completed with scores of 80 percent or higher and zero unresolved items remaining on the weakness list