CSCP (ASCM) cheat sheet
CSCP · Keep the key ideas within reach.
Supply Chain Strategy and Design
SCOR defines six level-1 management processes: Plan, Source, Make, Deliver, Return, and Enable; each is decomposed into level-2 and level-3 process elements.
Strategic fit exists when the supply chain's position on the responsiveness-efficiency frontier matches the implied demand uncertainty of the products it serves; high-uncertainty products favor responsiveness, predictable ones favor efficiency.
Four classic causes of the bullwhip effect: demand-signal processing (forecast updating), order batching, price fluctuation, and shortage gaming/rationing.
Square-root law: safety stock held across n identical stocking locations is approximately sqrt(n) times the safety stock required by one consolidated location, so consolidation reduces total buffer inventory.
The push-pull boundary sits where scale economies end and demand uncertainty begins; postponement (delayed differentiation) moves that boundary downstream toward the customer.
Kraljic segmentation: high profit impact + high supply risk = strategic; high profit impact + low supply risk = leverage; low profit impact + high supply risk = bottleneck; low impact + low risk = non-critical.
Total cost of ownership includes unit price plus transportation, duties and tariffs, inventory carrying cost, quality and inspection, risk exposure, and end-of-life disposal costs.
Capacity strategy options: lead (capacity added ahead of demand, risks idle capacity), lag (capacity added after demand is proven, risks shortfalls), and match/track (capacity added in step with demand).
Order winners are the criteria that cause a customer to choose a supplier; order qualifiers are the minimum acceptable standards a supplier must meet to be considered at all.
Supply Chain Planning and Execution
S&OP cycle steps: data gathering and demand planning, demand review, supply review, pre-S&OP financial reconciliation, and executive S&OP that produces one consensus plan.
EOQ = square root of (2DS / H), where D = annual demand in units, S = cost per order placed, H = annual holding cost per unit; it minimizes the sum of ordering and holding costs.
Independent-demand reorder point: ROP = (average demand per period x lead time in periods) + safety stock; with normal variability, safety stock = z x standard deviation of demand x square root of lead time.
Forecast accuracy measures: MAD = sum of absolute errors / n; MAPE = average of (absolute error / actual) x 100; tracking signal = running sum of forecast errors / MAD, with |TS| > 4 indicating bias.
MRP net requirements = gross requirements - projected on-hand - scheduled receipts + safety stock; planned order releases are offset by the item's lead time and sized by the lot-sizing rule.
Cash-to-cash cycle = days inventory outstanding + days sales outstanding - days payables outstanding; shortening it releases working capital without changing profit.
Inventory turnover = cost of goods sold / average inventory value; days of supply = 365 / turnover.
Takt time = available production time / customer demand rate; it sets the pace to which a balanced, pull-driven line is leveled.
Theory of constraints five focusing steps: identify the constraint, exploit it, subordinate everything else to it, elevate it, then repeat once it moves.
Supply Chain Improvement and Best Practices
SCOR performance attributes are reliability, responsiveness, agility, cost, and asset management efficiency; each is measured by level-1 metrics such as perfect order fulfillment, order fulfillment cycle time, and cash-to-cash cycle time.
Perfect order fulfillment counts only orders that are delivered complete, on time, damage-free, and with correct documentation; it is stricter than any single fill-rate or on-time measure.
DMAIC sequence for existing-process improvement: Define, Measure, Analyze, Improve, Control; DMADV (define, measure, analyze, design, verify) applies to new process design.
The seven wastes (TIMWOOD): transportation, inventory, motion, waiting, overproduction, overprocessing, and defects.
Risk response options after scoring likelihood x impact: avoid, mitigate/reduce, transfer (insurance, contracts), and accept with a contingency plan.
Root cause analysis tools: 5 Whys for linear causal chains, fishbone/Ishikawa for grouping candidate causes into categories such as man, machine, method, material, measurement, environment.
Triple bottom line evaluates performance on social, environmental, and economic dimensions; circular economy design keeps materials in use through reuse, repair, remanufacture, and recycling.
Benchmarking types: internal (between own units), competitive (direct rivals), functional/process (similar processes in other industries), and generic (best-in-class regardless of industry).
PDCA (Plan-Do-Check-Act, the Deming cycle) is the iterative loop underlying kaizen, ISO management-system standards, and most continuous improvement programs.