- SCOR model
- Reference framework describing a supply chain through six management processes: Plan, Source, Make, Deliver, Return, and Enable. Used to structure, measure, and benchmark supply chain performance.
- Bullwhip effect
- Upstream amplification of demand variability. Main causes are demand-signal processing or forecast updating, order batching, price fluctuations, and shortage gaming during rationing.
- Postponement
- Delaying final product configuration or the point of differentiation until customer demand is known, which lowers inventory risk and improves responsiveness to volatile demand.
- Push-pull boundary
- Point in a supply chain where forecast-driven push processes give way to demand-driven pull processes; its position reflects where economies of scale end and uncertainty begins.
- Square root law
- Rule of thumb stating that total safety stock across n identical stocking locations is roughly the square root of n times the safety stock needed at one consolidated location.
- Kraljic matrix
- Two-by-two segmentation of purchased items by profit impact and supply risk, producing four categories: strategic, leverage, bottleneck, and non-critical, each with a different sourcing approach.
- Total cost of ownership
- Sum of all costs of acquiring, using, and disposing of a good, including price, freight, duties, inventory carrying cost, quality, risk, and disposal rather than purchase price alone.
- Level capacity strategy
- Holding production capacity constant and absorbing demand variation through inventory build, backlogs, or overtime; favors stable operations at the cost of higher inventory.
- Chase capacity strategy
- Adjusting capacity each period to match demand, which keeps inventory low but incurs costs of hiring, layoffs, overtime, and idle equipment as demand swings.
- Cross-docking
- Flow of inbound goods directly to outbound vehicles with little or no storage, cutting handling cost and inventory while requiring tight scheduling and accurate inbound shipments.
- Order winners and qualifiers
- Order winners are criteria that differentiate a firm and cause the customer to buy; qualifiers are minimum standards a supplier must meet merely to be considered.
- Sales and operations planning
- Monthly cross-functional process that balances demand, supply, and financial plans, ending in an executive consensus plan covering a rolling horizon of roughly 18 to 24 months.
- Economic order quantity
- Order size that minimizes the combined cost of ordering and holding inventory, computed as the square root of 2DS divided by H, where H is annual holding cost per unit.
- Reorder point
- Inventory position at which a replenishment order is triggered; equals expected demand during lead time plus safety stock for independent-demand items with a fixed review period.
- Safety stock
- Buffer inventory protecting against demand and lead-time variability; with normally distributed demand it equals the z factor times demand standard deviation times the square root of lead time.
- Mean absolute deviation
- Average of the absolute differences between actual and forecast values, calculated as the sum of absolute errors divided by the number of periods; used to size safety stock.
- Tracking signal
- Running sum of forecast errors divided by mean absolute deviation; values outside roughly plus or minus four indicate persistent forecast bias rather than random error.
- Material requirements planning
- Time-phased planning of components and raw materials using the bill of materials, inventory records, and lead times to generate planned order releases for dependent demand items.
- Available-to-promise
- Uncommitted portion of supply, after existing commitments, that can still be promised to new customer orders in a given period; used by sales to quote reliable delivery dates.
- Takt time
- Available production time divided by the rate of customer demand; it sets the pace at which a leveled, synchronized production line should complete one unit.
- Kanban
- Visual or electronic signal that authorizes upstream replenishment of exactly what a downstream operation has consumed, implementing pull scheduling in a lean system.
- Cash-to-cash cycle
- Days inventory outstanding plus days sales outstanding minus days payables outstanding; measures how long cash is tied up in the supply chain before collection.
- Theory of constraints
- Improvement method with five steps, identify, exploit, subordinate, elevate the constraint, and repeat; the constraint determines the throughput of the entire system.
- Distribution requirements planning
- Time-phased replenishment planning across a distribution network that aggregates warehouse needs back through regional centers to the plant, driving transportation and inventory plans.
- DMAIC
- Six Sigma roadmap for improving an existing process: Define the problem, Measure current performance, Analyze root causes, Improve the process, and Control the gains.
- Perfect order fulfillment
- Percentage of orders delivered complete, on time, damage-free, and with correct documentation; a strict SCOR reliability metric reflecting the whole order fulfillment process.
- SCOR performance attributes
- Five attributes used to structure supply chain metrics: reliability, responsiveness, agility, cost, and asset management efficiency, each supported by level-1 and lower-level metrics.
- Five whys
- Iterative technique of asking why a problem occurred until the underlying root cause is reached, preventing teams from acting on symptoms rather than causes.
- PDCA cycle
- Plan, Do, Check, Act: iterative improvement loop where a change is planned, piloted, evaluated against expected results, then standardized or corrected before repeating.
- Seven wastes
- Lean categories of non-value-adding activity: transportation, inventory, motion, waiting, overproduction, overprocessing, and defects, commonly remembered by the acronym TIMWOOD.
- Risk response strategies
- Four options chosen after assessing likelihood and impact: avoid the activity, mitigate or reduce exposure, transfer risk through contracts or insurance, or accept it with a contingency plan.
- Triple bottom line
- Performance framework measuring results on social, environmental, and economic dimensions simultaneously, used to balance stakeholder value against purely financial measures.