Quick reference

Six Sigma and the Organization

  • Six Sigma is a data-driven methodology that reduces variation so a process produces no more than 3.4 defects per million opportunities (DPMO), equal to a 6-sigma long-term level after the 1.5-sigma shift.

  • Sigma-to-DPMO reference (1.5-sigma shift applied): 3 sigma ~ 66,807; 4 sigma ~ 6,210; 5 sigma ~ 233; 6 sigma ~ 3.4 DPMO.

  • DMAIC (Define, Measure, Analyze, Improve, Control) improves existing processes; DMADV or DFSS (Define, Measure, Analyze, Design, Verify) creates new processes or products.

  • Core model Y = f(x): Y is the output or CTQ, and the x's are the input process variables that must be found, controlled, or optimized.

  • Roles: Champion/Sponsor funds the project and removes barriers; Master Black Belt is the technical coach; Black Belt leads full time; Green Belt leads part time; Process Owner owns the process after handoff.

  • Cost of poor quality (COPQ) = internal failure + external failure + appraisal + prevention costs; a 3-4 sigma organization typically spends 15-25% of revenue on COPQ versus under 1% near 6 sigma.

  • Lean targets speed and the eight wastes: defects, overproduction, waiting, non-utilized talent, transportation, inventory, motion, excess processing (DOWNTIME).

  • Quality pioneers: Shewhart (control charts), Deming (PDCA, 14 points), Juran (quality trilogy, Pareto principle), Crosby (zero defects, cost of nonconformance), Ishikawa (fishbone, quality circles), Taguchi (robust design, loss function).

  • Theory of Constraints sequence: identify the constraint, exploit it, subordinate everything else to it, elevate it, then repeat; system throughput is set by the constraint.

Quick reference

Define

  • A project charter contains the business case, problem statement, goal statement, scope (in and out), team and roles, milestones/schedule, expected benefits and costs, and approvals.

  • A problem statement states what, where, when, and how much (a measurable gap and its impact) with no stated cause and no stated solution.

  • A goal statement must be SMART (Specific, Measurable, Achievable, Relevant, Time-bound) and should quantify the target improvement in the same metric as the baseline.

  • SIPOC maps Suppliers, Inputs, Process (5-7 high-level steps), Outputs, and Customers; it is used to set and communicate project scope boundaries.

  • VOC to CTQ flow: collect voice of the customer, translate to needs, then to measurable CTQs with operational definitions; Kano classifies needs as dissatisfiers, satisfiers, or delighters.

  • Team development stages are forming, storming, norming, performing, and adjourning; conflict during storming is a normal phase, not a defect.

  • RACI assigns each task one Accountable owner, plus Responsible doers, Consulted contributors, and Informed recipients.

  • Project selection criteria: linkage to strategic goals, COPQ or revenue impact, feasibility, availability of data, and duration (a Green Belt project is typically 3-6 months).

  • RUMBA test for objectives: Reasonable, Understandable, Measurable, Believable, Achievable.

Quick reference

Measure

  • Continuous (variable) data carries more information per observation than discrete (attribute) data; measure continuous whenever the process permits it.

  • Gage R&R %study variation: under 10% acceptable; 10-30% marginal and judged against risk and cost; over 30% unacceptable - fix the measurement system before measuring the process.

  • Repeatability is equipment variation (one appraiser, same parts, repeated trials); reproducibility is appraiser variation (different appraisers, same parts).

  • Attribute agreement: Kappa above 0.90 excellent, 0.70-0.90 acceptable, below 0.70 needs improvement; within-appraiser agreement should approach 100%.

  • Sample size for a mean: n = (z x sigma / E)^2, where E is the desired margin of error; halving the margin of error requires four times the sample.

  • Cp = (USL - LSL) / (6 sigma) measures potential capability; Cpk = min[(USL - mean)/(3 sigma), (mean - LSL)/(3 sigma)] measures actual capability and penalizes off-centering.

  • Cp/Cpk use within-subgroup (short-term) sigma; Pp/Ppk use overall (long-term) sigma, so Ppk is generally less than or equal to Cpk on the same data.

  • Yield metrics: DPU = defects / units; DPMO = (defects / opportunities) x 1,000,000; RTY = the product of the first-pass yields of all process steps.

  • Sampling methods: random, systematic (every kth unit), stratified (random within strata), and cluster (whole groups); convenience sampling is biased and should be avoided.

Quick reference

Analyze

  • Hypothesis testing: H0 states no difference or no effect; the alternative H1 is the claim the data must support, and the burden of proof lies with H1.

  • Type I error (alpha) rejects a true H0 (producer risk); Type II error (beta) fails to reject a false H0 (consumer risk); power = 1 - beta.

  • Decision rule with p-values: reject H0 when p < alpha; otherwise fail to reject H0 (never 'accept' H0).

  • Test selection: continuous Y with two levels uses a t-test; three or more levels uses ANOVA; count/categorical data uses chi-square; equal-variance checks use F, Levene, or Bartlett tests.

  • A paired t-test handles two related measurements on the same units (before/after); a two-sample t-test handles independent groups.

  • ANOVA splits total variation into between-group and within-group components; a small F-test p-value indicates at least one group mean differs from the others.

  • Correlation coefficient r ranges from -1 to +1 and measures linear association only; r-squared is the proportion of variation in Y explained by X.

  • Regression assumptions are checked with residuals: independence, normality, constant variance, and no influential outliers (high leverage or large Cook's D).

  • Chi-square goodness-of-fit and test of independence require attribute data with expected counts of at least five per cell.

Quick reference

Improve

  • Designed experiments (DOE) estimate main effects and interactions efficiently, whereas one-factor-at-a-time (OFAT) testing cannot detect interactions at all.

  • Full factorial 2^k design: k factors at two levels require 2^k runs; resolution III confounds main effects with two-factor interactions, resolution IV confounds two-factor interactions with each other, resolution V confounds two-factor with three-factor interactions.

  • Randomization protects against nuisance variables, replication provides an independent error estimate, and blocking removes known sources of variation such as shift, operator, or batch.

  • A main effect is the average response change as one factor moves from low to high level; an interaction exists when the effect of one factor depends on the level of another.

  • FMEA ranks failure modes by RPN = Severity x Occurrence x Detection; higher RPN gets earlier corrective action, and severity alone can override the ranking.

  • Poka-yoke (mistake proofing) prevents an error at its source and is preferred over detection-based controls because detection still allows defects to be produced.

  • Lean improvement tools: 5S (sort, set in order, shine, standardize, sustain), kaizen events, value stream mapping, SMED setup reduction, TPM, kanban, standard work, and cellular layout.

  • Pilot the change on a limited scale and confirm statistically that the effect is real and practical before full deployment; verify the improvement against the original baseline capability.

Quick reference

Control

  • A control plan lists, per process step: the characteristic and specification, measurement method, sample size and frequency, control method, and the reaction plan (OCAP).

  • Control limits are computed from process data at plus/minus three sigma around the center line; specification limits are customer tolerances and are never plotted as control limits.

  • Chart selection: continuous data uses X-bar and R (subgroup n of 2-8), X-bar and S (n of 9 or more), or I-MR (n = 1); attribute defectives use p or np; attribute defects use c or u.

  • Out-of-control signals include: one point beyond 3 sigma, two of three consecutive points beyond 2 sigma, four of five beyond 1 sigma, eight consecutive points on one side of the center line, trends, and too little variation.

  • Control limits are reliable only after about 20-25 subgroups of rational-subgroup data collected while the process is stable.

  • Capability must be re-verified after improvement; ongoing tracking of Cpk/Ppk and DPMO demonstrates that the gain is sustained.

  • Standardization sustains gains through documented procedures, revised work instructions, training, visual controls, and mistake-proofing devices.

  • Project closure requires handoff to the process owner, documentation of the new method, lessons learned, and a defined audit or follow-up schedule.